-
1.
公开(公告)号:US11708940B2
公开(公告)日:2023-07-25
申请号:US17016922
申请日:2020-09-10
申请人: Mavig GmbH
发明人: Hendrik Thomann
CPC分类号: F16S3/04 , B21D51/06 , B21D53/00 , B23P19/04 , B66C23/64 , E02F3/38 , F16M13/022 , F16M2200/06 , Y10T29/49631
摘要: The present invention relates to a process of producing a boom part from a sheet metal blank, in particular a process of producing a boom part having a bearing seat, in which the starting material is merely formed by bending. Thus, the production process is simplified. In addition, the present invention relates to a process of producing a boom that is closed at both ends by joining two boom parts produced by means of the process of the present invention. Furthermore, the present invention comprises boom parts and booms which are produced by means of one of the processes according to the present invention.
-
公开(公告)号:US09759065B2
公开(公告)日:2017-09-12
申请号:US14271476
申请日:2014-05-07
CPC分类号: E21F1/14 , Y10T29/49631
摘要: A mine ventilation structure including a support structure, a plurality of side panels and ceiling panels mounted on the support structure, and a cementitious sealing composition applied over at least one surface of the side or ceiling panels. A method of assembling an overcast in an intersection within a mine is also provided.
-
公开(公告)号:US09446871B2
公开(公告)日:2016-09-20
申请号:US14284487
申请日:2014-05-22
发明人: Claude Granger , Jean Roy
IPC分类号: B21B39/34 , B21B39/04 , B21B39/16 , B66F5/04 , B65B23/00 , B21B39/02 , B65B55/00 , B65B55/20 , B23P23/06 , E04H5/02 , B23Q3/18 , E04G21/24 , E04H9/00 , A47B3/06 , A47B37/00 , B61B13/12 , B66D1/60 , E04G3/24 , E04G1/18 , B66C1/66 , B65G67/02 , B01D3/32 , F25J3/04 , B66C1/10 , B01J19/32 , E04G1/36 , E04G5/14 , E04G21/28 , E04F11/18 , E04G1/15 , E04G5/06 , E04G21/14 , B23K9/02 , B23K9/173 , B23K9/23 , B65B65/00 , B21D5/12 , B21C37/08 , B21D5/14 , B21C37/083 , E04H5/10 , E04G5/12
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A trolley for supporting the plate during vertical rolling of the plate is provided. In one embodiment, the trolley can include a support body configured to provide support for the trolley; a plurality of wheels configured to allow the trolley to move across a floor; a lifting arm supported by the support body, wherein the lifting arm is movable about a first position and a second position; a pump handle configured to raise the lifting arm between the first position and the second position; and a plate holder configured to move with the lifting arm and hold the plate in place relative to the trolley.
摘要翻译: 提供了用于在板的垂直轧制期间支撑板的手推车。 在一个实施例中,手推车可以包括构造成为手推车提供支撑的支撑体; 多个车轮,其被构造成允许台车移动穿过地板; 由所述支撑体支撑的提升臂,其中所述提升臂可围绕第一位置和第二位置移动; 泵手柄,其构造成在所述第一位置和所述第二位置之间升高所述提升臂; 以及板保持器,其构造成与提升臂一起移动并相对于手推车将板保持在适当位置。
-
公开(公告)号:US20150322787A1
公开(公告)日:2015-11-12
申请号:US14271476
申请日:2014-05-07
IPC分类号: E21F1/16
CPC分类号: E21F1/14 , Y10T29/49631
摘要: A mine ventilation structure including a support structure, a plurality of side panels and ceiling panels mounted on the support structure, and a cementitious sealing composition applied over at least one surface of the side or ceiling panels. A method of assembling an overcast in an intersection within a mine is also provided.
摘要翻译: 一种矿井通风结构,包括支撑结构,多个侧板和安装在支撑结构上的天花板板,以及施加在侧板或天花板板的至少一个表面上的水泥密封组合物。 还提供了在矿井内的交叉口中组装阴影的方法。
-
5.
公开(公告)号:US09175494B2
公开(公告)日:2015-11-03
申请号:US14675966
申请日:2015-04-01
申请人: Andresen Towers A/S
发明人: Tom Andresen
CPC分类号: E04H12/342 , E04H12/00 , E04H12/08 , E04H12/34 , F03D13/20 , F05B2240/912 , Y02B10/30 , Y02E10/728 , Y02P70/523 , Y02P80/22 , Y10T29/49623 , Y10T29/49631
摘要: A method of assembling a tubular building structure 1 comprising a circumferential wall structure formed from a plurality of wall elements 2,20. The method comprises mutually assembling at least some of the wall elements 2,20 by use of screw sockets 4 mounted in holes in the wall elements 2,20 and bolts. The wall elements may be superposed tube sections 2 arranged on top of each other, and these tube sections 2 may be formed by interconnecting axially extending tube segments 20. In some embodiments of the invention, the screw sockets 4 are mounted at the manufacturing site, and the wall elements 2,20 are subsequently transported to the erection site of the tubular building structure 1. Preferably the mutual assembly of the wall elements 2,20 is performable solely by people working inside the tubular building structure 1 fastening the bolts 5 to the pre-mounted screw sockets 4.
摘要翻译: 一种组装管状建筑结构1的方法,包括由多个壁元件2,20形成的圆周壁结构。 该方法包括通过使用安装在壁元件2,20中的孔中的螺钉孔4和螺栓来相互组装至少一些壁元件2,20。 壁元件可以是彼此重叠的叠置的管段2,并且这些管段2可以通过将轴向延伸的管段20互连而形成。在本发明的一些实施例中,螺钉插座4安装在制造现场, 并且壁元件2,20随后被运送到管状建筑结构1的竖立位置。优选地,壁元件2,20的相互组合仅由在管状建筑结构1内部工作的人员执行,将螺栓5紧固到 预装螺丝插座4。
-
公开(公告)号:US09168576B2
公开(公告)日:2015-10-27
申请号:US14113948
申请日:2011-05-27
申请人: Cevdet Unan
发明人: Cevdet Unan
CPC分类号: B21C47/02 , B21C37/122 , B21C37/124 , B21C37/126 , B21C37/15 , B21C37/185 , Y10T29/49631 , Y10T29/49826
摘要: A tower (C) production method is developed with the present invention, comprising a first production stage including the steps of unrolling and bringing into a planar state a sheet metal (B) wound around a coil (A); bending the planar sheet metal (B) at the lateral direction at varying bending radii (d); and winding the bent sheet metal (B′) into a conical coil (A′), as well as a final production stage yielding the tower and including the steps of feeding the sheet metal (B′) unwound from the conical coil (A′) to at least one winding machine (8), and bending and winding the bent sheet metal (B′) in the winding machine around a central bending axis (T) parallel to one surface (B1) thereof so that a defined initial winding radius and the angle between a longer edge (B3) thereof and the axis (T) are kept constant and the longer edge (B3) of the sheet metal is joined over itself.
摘要翻译: 利用本发明开发了一种塔(C)制造方法,包括:第一制造阶段,包括使卷绕在线圈(A)上的金属片(B)展开并呈平面状态的步骤; 在变化的弯曲半径(d)下在横向弯曲平面金属片(B); 并且将弯曲的金属板(B')卷绕成圆锥形线圈(A'),以及将塔架的最终生产阶段卷绕,并且包括将从锥形线圈(A')退绕的金属片(B') )到至少一个绕线机(8),并且绕着绕线机将弯曲的金属片(B')绕平行于其一个表面(B1)的中心弯曲轴线(T)弯曲和卷绕,使得限定的初始绕组半径 并且其长边缘(B3)与轴线(T)之间的角度保持恒定,并且金属片材的较长边缘(B3)自身接合。
-
公开(公告)号:US20150143765A1
公开(公告)日:2015-05-28
申请号:US14381611
申请日:2012-02-28
CPC分类号: E04H12/34 , E02D27/425 , E04B1/4114 , F03D13/22 , F05B2230/60 , F05B2240/912 , F05B2240/917 , F05B2260/30 , Y02E10/728 , Y02P70/523 , Y10T29/49631
摘要: The invention relates to a connection between a tower (7) of a wind generator and its foundation established by an interface formed by flexible elements independent from one another which are formed by a series of tensioned cables (1). Each of these cables is located inside vertical housing means (4) which are embedded in the foundation.The invention also relates to a method of execution of the connection between a tower (7) of a wind generator and its foundation (8), comprising a series of stages, some of which vary depending on whether or not the foundation (8) has central lightweighting. It also generates variation in some aspect if the tower is made of metal or concrete and, in this case, if the tensioning cables of the tower are common to or independent of those of the connection.
摘要翻译: 本发明涉及一种风力发电机的塔架(7)与其由通过由一系列张紧的电缆(1)形成的彼此独立的柔性元件形成的接口所建立的基座之间的连接。 这些电缆中的每一个位于嵌入基座的垂直外壳装置(4)内。 本发明还涉及执行风力发电机的塔架(7)与其基座(8)之间的连接的方法,该方法包括一系列的阶段,其中一些阶段根据基础(8)是否具有 中央轻量化。 如果塔由金属或混凝土制成,并且在这种情况下,如果塔的张紧电缆与连接的共用或不相关,则它也会在某些方面产生变化。
-
公开(公告)号:US08931749B2
公开(公告)日:2015-01-13
申请号:US13717029
申请日:2012-12-17
发明人: Jan Vetesnik
CPC分类号: E04H12/2246 , A62B35/0068 , E01F9/688 , E04H12/2269 , F16B5/0004 , F41J1/10 , G09F1/00 , Y10S248/91 , Y10T29/49631
摘要: A portable base is provided for supporting an upstanding mast and particularly a davit with a jib where the jib includes a load connecting point arranged such that on application of a load beyond a predetermined limit the spacing of the load connecting point from the mast is reduced to reduce a side load on the base. The base includes bottom and side panels connected edge to edge to form a container with a hollow interior filled by concrete where at least one side by side panels forming a top wall has a sleeve extends from the panel at least partly through the hollow interior to the base. The sleeve which is welded to reinforcing bars passing through the material receives and supports the mast and is held in place by forces contributed both by the set filling material and the panels.
-
公开(公告)号:US20140345975A1
公开(公告)日:2014-11-27
申请号:US14284743
申请日:2014-05-22
发明人: Claude GRANGER , Jean ROY
IPC分类号: E04G1/18
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A scaffolding assembly configured for use with an assembly table is provided. In one embodiment, the scaffolding assembly can include an inner scaffolding and an outer scaffolding, wherein the inner scaffolding and the outer scaffolding each include: a plurality of main posts having a lower end and an upper end; an extendible arm connected to each of the main posts, wherein the extendible arm is configured to extend substantially perpendicular from the main post; and a tertiary scaffolding support connected to the extendible arm and the main post, the tertiary support configured to transfer at least some of the force from the extendible arm to the main post, wherein the scaffolding assembly is configured to attach to the assembly table, such that the scaffolding assembly receives support from the assembly table.
摘要翻译: 提供了一种构造成与组装台一起使用的脚手架组件。 在一个实施例中,脚手架组件可以包括内部脚手架和外部脚手架,其中内部脚手架和外部脚手架各自包括:具有下端和上端的多个主支柱; 连接到每个主柱的可延伸臂,其中所述可延伸臂构造成从所述主柱基本垂直地延伸; 以及连接到所述可伸缩臂和所述主柱的第三脚手架支撑件,所述第三支撑构造成将所述力中的至少一些力从所述可延伸臂传递到所述主柱,其中所述脚手架组件构造成附接到所述组装台, 脚手架组件从组装台接收支撑。
-
10.
公开(公告)号:US20140345140A1
公开(公告)日:2014-11-27
申请号:US14284510
申请日:2014-05-22
发明人: Claude GRANGER , Yves HARDY , Emmanuelle BROMET , Jean ROY , Philippe GRIGOLETTO , Qun-Fang LI , Herve FERRIERE , Sylvain MADE
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A method for fabricating a distillation column in a remote location away from a permanent manufacturing facility is provided. In one embodiment, the method can include the steps of: forming a plurality of column sections each having a diameter D, each column section comprising a plurality of courses that have been horizontally welded together, wherein each course is comprised of two or more partial shells that have been vertically welded together, wherein each of the two or more partial shells was created by vertically rolling a rectangular plate having a length of at least ( 1 N π · D ) , wherein N is the number of partial shells used to form the course; installing a distributor and packing in each column section to form a plurality of packed column sections; and stacking the plurality of packed column sections to form a column.
摘要翻译: 提供了一种在远离永久性制造设施的远程位置制造蒸馏塔的方法。 在一个实施例中,该方法可以包括以下步骤:形成多个具有直径D的柱段,每个柱段包括已经被水平焊接在一起的多个球道,其中每个球道由两个或更多个部分球 已经被垂直焊接在一起,其中两个或更多个部分壳中的每一个是通过垂直滚动长度至少为(1 N& D)的矩形板而产生的,其中N是用于 形成课程; 在每个柱部分安装分配器和包装件以形成多个填充柱部分; 并堆叠多个填充柱部分以形成柱。
-
-
-
-
-
-
-
-
-