Pile driving methods and systems for driving a pile

    公开(公告)号:US12123159B2

    公开(公告)日:2024-10-22

    申请号:US17424279

    申请日:2020-01-21

    申请人: ITREC B.V.

    发明人: Eric Romeijn

    摘要: A pile driving method for driving a pile, e.g. a hollow and open ended pile, e.g. a large diameter pile having an outer diameter of at least 5 meters, e.g. a monopile of an offshore wind turbine, into the soil, e.g. into the seabed. Use is made of a pile driving system which comprises a drive head member that is configured to engage the pile, and a solid mass drop weight assembly comprising a support structure and comprising solid drop weight elements supported by said support structure, preferably solid steel drop weight elements being composed of steel elements, e.g. stackable steel elements, which drop weight elements have a total mass of at least 100 tonnes, e.g. more than 500 tonnes. e.g. more than 1000 tonnes, e.g. more than 2000 tonnes, which drop weight assembly is vertically mobile relative to, e.g. above, the drive head member. Further use is made of a lift system that is configured to bring the drop weight assembly into an initial height position relative to the drive head, and a quick release system adapted to effect quick release of the lift system.

    Post sleeve assembly
    2.
    发明授权

    公开(公告)号:US12116780B2

    公开(公告)日:2024-10-15

    申请号:US16994275

    申请日:2020-08-14

    申请人: N. Eric Knudsen

    发明人: N. Eric Knudsen

    摘要: A post sleeve provides a substantially permanent base for supporting a post for a fence or sign, and from which one post can be removed and replaced with another post. The sleeve includes a concrete body that is poured on site, using a sleeve core prepositioned in the post hole, and around which wet concrete is poured. After the concrete is cured, the core is removed, leaving a post sleeve cavity configured to receive a post. The core can be rigid, or can include a flexible shell and stiffener. A preformed post sleeve top can be attached to the sleeve core and positioned therewith in the post hole, to become a permanent part of the post sleeve, once the concrete cures. A drain is attached to the core, and remains in the sleeve when the core is removed, and can be a percolation chamber, or passage extending below the sleeve.

    System for forming a wind turbine foundation

    公开(公告)号:US12000378B2

    公开(公告)日:2024-06-04

    申请号:US17555989

    申请日:2021-12-20

    IPC分类号: F03D13/20 E02D27/42 E04H12/34

    摘要: A method of forming a wind turbine foundation includes providing an anchor cage in an excavation pit, the anchor cage including an upper flange, a lower flange, and a plurality of anchor bolts extending therebetween. A first cementitious material is directed into the excavation pit so that the anchor cage becomes at least partially embedded in the material, which is allowed to cure to form a rigid body. A connecting element is selectively engaged with the upper flange and an actuating element is positioned in operative relation with the connecting element, the connecting and actuating elements positioned in non-contact relation with the anchor bolts. The actuating element is actuated relative to the connecting element to raise the upper flange from the rigid body into a leveled position. A second cementitious material is directed into a space beneath the raised upper flange and is allowed to cure to form a support layer.

    OFFSHORE PILE INSTALLATION METHOD AND SYSTEM

    公开(公告)号:US20240175227A1

    公开(公告)日:2024-05-30

    申请号:US18283667

    申请日:2022-03-22

    申请人: ITREC B.V.

    摘要: A method for pile installation wherein use is made of a vessel for pile installation. A pile holding system is mounted to the hull of a vessel, e.g. on deck (2) of a vessel, which pile holding system is configured to hold the pile in an upright orientation at a pile installation location at least whilst suspended from a crane by means of one or more winch driven cables, e.g. for installation of a pile adapted to support an offshore wind turbine, the pile holding system comprises a pile holding tool (40). The pile holding tool (40) further comprises a damping system including at least one damping device (45) that is mounted to the base structure (42) and is configured to, in use, engage on the pile suspended from the crane at a location that is vertically spaced from the circumferential zone that is engaged by the plurality of pile engaging positioning devices (43) of the pile holding tool, and wherein the at least one damping device (45) is configured to dampen pendulum motion of the pile suspended from the crane.

    Wind turbine foundation base
    6.
    发明授权

    公开(公告)号:US11965302B2

    公开(公告)日:2024-04-23

    申请号:US17685502

    申请日:2022-03-03

    IPC分类号: E02D27/42 E02D27/14 F03D13/20

    摘要: A wind turbine platform includes a wind turbine base; a plurality of radial moment beams, operatively connected to the wind turbine base, extending radially from the wind turbine base; and a plurality of piles, each pile being operatively connected to a radial moment beam and extending into a medium to provide foundational support for the wind turbine platform.

    PORTAL FRAME PLATFORM AND CONSTRUCTION METHOD FOR LARGE OFFSHORE WIND TURBINES

    公开(公告)号:US20240084537A1

    公开(公告)日:2024-03-14

    申请号:US17941775

    申请日:2022-09-09

    申请人: Jin Wang

    发明人: Jin Wang

    摘要: A portal frame platform comprises at least three elongate tubular legs extending vertically downward from a top above the waterline to the seabed without horizontal or diagonal bracing members in-between, and a horizontal deck with at least three circular sleeves concentrically coupled to the top of the legs supporting a wind turbine in an in-service configuration. The portal frame platform supporting the wind turbine has an installation configuration with two barges connected to opposite sides of the deck, and the legs extending vertically upward from a bottom above the waterline through the circular sleeves. A construction method includes twelve-steps for quayside assembling, sea-towing and self-installing the portal frame platform with the wind turbine and foundation piles wherein the portable frame platform is converted from the installation configuration to the in-service configuration by lowering the legs through the circular sleeves using wire and winch systems on the two barges.

    Pole stabilization assembly
    10.
    发明授权

    公开(公告)号:US11927026B2

    公开(公告)日:2024-03-12

    申请号:US16819915

    申请日:2020-03-16

    申请人: Brandon W Baker

    发明人: Brandon W Baker

    摘要: A post stabilization system which uses components which allow for both pushing and pulling forces to be applied to a workpiece in situ. The system uses the ground as an anchor point to stabilize a workpiece being installed. A force application member is connected to an anchoring device at one end. The opposing end of the force application member is an abutment member for applying a stabilizing force to a pole or other vertically oriented workpiece. An adjustment/tensioning member is applied between the anchoring device and the abutment member to allow for adjusting the angle of the workpiece by applying either pushing or pulling forces to the workpiece.