-
公开(公告)号:US20190025855A1
公开(公告)日:2019-01-24
申请号:US15928967
申请日:2018-03-22
Applicant: Hitachi, Ltd.
Inventor: Tomohiro MATSUDA , Hideya YOSHIUCHI
IPC: G05D1/02 , G05B19/042
Abstract: A distance between an autonomously mobile information processing device and an apparatus is calculated based on positional information of the information processing device and positional information of the apparatus installed in a service provision site and necessary for a service to be provided by the information processing device, and the apparatus that is available is determined based on the distance between the information processing device and the apparatus in a case where the information processing device coordinates with the apparatus to provide the service.
-
公开(公告)号:US20180326593A1
公开(公告)日:2018-11-15
申请号:US15918486
申请日:2018-03-12
Applicant: HITACHI, LTD.
Inventor: Hideya YOSHIUCHI
CPC classification number: B25J13/006 , B25J9/0003 , B25J9/162 , G05D1/0022 , G05D1/0276 , Y10S901/01
Abstract: In a service provision system utilizing a movable device such as a robot, a service is realized, in which an external service device installed at a service location and the movable device cooperate with each other. A position of the movable device as well as an installation position and an availability range of the service devices are managed at a service provision location; when the movable device provides a service, an availability of a service device necessary for the service is determined, and when there is a service device not available, the robot is moved to a position where the service device becomes available.
-
公开(公告)号:US20180001473A1
公开(公告)日:2018-01-04
申请号:US15637691
申请日:2017-06-29
Applicant: Hitachi, Ltd.
Inventor: Hideya YOSHIUCHI , Seishi HANAOKA
IPC: B25J9/16 , G05B19/048 , G05B23/02
CPC classification number: B25J9/1674 , B25J9/1602 , G05B19/042 , G05B19/048 , G05B23/0208
Abstract: An operation monitoring server includes a storage apparatus configured to store instructions, and a processor configured to operate based on the instructions. The processor is configured to acquire state information on at least one of a monitoring target device or a base location in which the monitoring target device is placed. The processor is configured to select, based on the acquired state information, one of a plurality of service request processing apparatus each having a function of processing a service request received from the monitoring target device.
-
公开(公告)号:US20160309044A1
公开(公告)日:2016-10-20
申请号:US15096341
申请日:2016-04-12
Applicant: HITACHI, LTD.
Inventor: Naokazu NEMOTO , Yoshiki MATSUURA , Yukiko TAKEDA , Hideya YOSHIUCHI , Tatsuhiko MIYATA , Tsuneo SOBUE
CPC classification number: H04M15/8228 , H04L12/1435 , H04L41/5025 , H04L41/5029 , H04L41/5054 , H04M15/06 , H04M15/48 , H04M15/68 , H04M15/885
Abstract: When a plurality of services are enjoyed by a single terminal, a communication regulation caused by another service has influence on enjoyment of another service. A service provider and a mobile communication provider are affiliated with each other and newly provide an affiliated service in which a communication fee for a service use is borne by the service provider to a user. Conventional communication and affiliated service communication are performed on a single communication line of the user together, and communication control is performed in units of services such that a service quality of the affiliated service is maintained. It is implemented by affiliating a communication log and contract information between business operators and performing communication identification using user information at the time of a contract as a key.
Abstract translation: 当单个终端享受多个服务时,由另一个服务引起的通信规则对另一个服务的享受具有影响。 服务提供商和移动通信提供商彼此关联,并且新提供附属服务,其中服务提供商对用户承担服务使用的通信费用。 常规通信和附属业务通信在用户的单个通信线路上一起执行,并且以服务为单位执行通信控制,使得维护附属服务的服务质量。 通过在业务运营商之间关联通信日志和合同信息,并且在合同时使用用户信息作为关键字执行通信识别来实现。
-
公开(公告)号:US20230415996A1
公开(公告)日:2023-12-28
申请号:US18205344
申请日:2023-06-02
Applicant: Hitachi, Ltd.
Inventor: Tomohiro MATSUDA , Hideya YOSHIUCHI
CPC classification number: B65G1/1373 , G05D1/0287 , G06Q10/087 , G06Q10/063114 , G05D1/0217 , G06Q10/06316 , G05D2201/0216
Abstract: The disclosure is to eliminate a load on a portion as a bottleneck portion between work processes in a warehouse work control system. The invention includes: a work delay detection unit configured to detect a work delay of each of work subjects; a group configuration change unit configured to change a configuration of a work group when it is determined that the work delay is hindersome to execution of a work; a shift determination unit configured to determine a shift of the work subject when it is determined that the work subject whose work group is changed is present; and an on-movement-path work determination unit configured to determine the work to be performed on a movement path by the work subject.
-
公开(公告)号:US20230132818A1
公开(公告)日:2023-05-04
申请号:US17971423
申请日:2022-10-21
Applicant: Hitachi, Ltd.
Inventor: Hiroaki SHIKANO , Hiroki MIYAMOTO , Hideya YOSHIUCHI
Abstract: Risk element information indicating risk elements is acquired. An asset capable of becoming a fault due to a risk element indicated in the risk element information, and a fault probability that the asset becomes the fault are specified based on static configuration information. A risk model in which the asset capable of becoming the fault and the fault probability are associated is generated in advance. In response to a designated input, an one asset to be evaluated is specified as an evaluation target asset, based on the designated input. A risk model related to the evaluation target asset is specified. A risk evaluation value being an index indicating a risk of the evaluation target asset is calculated based on the fault probability of the evaluation target asset and the static configuration information. The risk evaluation value of the evaluation target asset is associated with the asset of the risk model.
-
公开(公告)号:US20210233002A1
公开(公告)日:2021-07-29
申请号:US17147655
申请日:2021-01-13
Applicant: Hitachi, Ltd.
Inventor: Hideya YOSHIUCHI
Abstract: It is made possible to adjust schedules of objects to be managed including hardware boxes and individuals including involved parties.
An integrated schedule management apparatus includes: a communication section that receives schedules of a user or/and a hardware box and associated schedules associated with the user or/and the hardware box from one or a plurality of management servers via a network; and an integrated schedule management section that generates an integrated schedule obtained by integrating the schedules received from the one or the plurality of management servers for each of the user or/and the hardware box, and an integrated associated schedule obtained by integrating the associated schedules received from the one or the plurality of management servers for each of the user or/and the hardware box, and that reflects the generated integrated schedule and the generated integrated associated schedule in the one or the plurality of management servers.-
公开(公告)号:US20200090103A1
公开(公告)日:2020-03-19
申请号:US16568308
申请日:2019-09-12
Applicant: Hitachi, Ltd.
Inventor: Hideya YOSHIUCHI , Tomohiro MATSUDA
Abstract: An object of the present invention is to promote efficiency improvement of a business by a mobile device. A business analysis server that analyzes a business in a mobile device system conducting the business by controlling a mobile device on the basis of a scenario includes a control unit, and a storage unit including a business index value database that manages a business index value indicating an effect of the business and a business index value history database that manages a change in the business index value as time-series data. The control unit receives scenario execution information when a business index value is designated, analyzes a correlation between the business index value and the scenario by referring to the business index value history database and the scenario execution information, extracts a target scenario whose correlation value with the business index value satisfies predetermined conditions, and generates a correction scenario.
-
公开(公告)号:US20240403764A1
公开(公告)日:2024-12-05
申请号:US18699862
申请日:2022-10-04
Applicant: HITACHI, LTD.
Inventor: Hideya YOSHIUCHI , Hidekazu MORITA , Sayaka KURATA , Hiroki MIYAMOTO
IPC: G06Q10/0633 , G06Q10/0639
Abstract: A business information management server 1 includes: a performance data collection unit that collects performance data of each business process from a data generation device 4 for each business flow, and stores the collected performance data in a storage device in association with a business in the business process and related elements related to the business; and a performance data search unit that, when a business flow and a search condition regarding similarity of performance data are designated together with a reference business flow, extracts a business flow similar to the reference business flow from among a plurality of business flows associated with the performance data stored in the storage device on the basis of the search condition, extracts performance data similar to performance data of the reference business flow from among the performance data of the extracted business flow, and outputs an extraction result.
-
公开(公告)号:US20240202193A1
公开(公告)日:2024-06-20
申请号:US18522397
申请日:2023-11-29
Applicant: Hitachi, Ltd.
Inventor: Amit KUMAR , Hideya YOSHIUCHI
IPC: G06F16/2455 , G06F16/2453 , G06F16/248 , G06F16/901
CPC classification number: G06F16/2455 , G06F16/24542 , G06F16/248 , G06F16/9024
Abstract: A graph search device includes: an existing information database storing existing information that includes a set of existing process graphs and a set of existing process tables; a query data management unit that acquires query data that includes a query graph and a query table; a structure comparison unit that determines, as a first search candidate, an existing process graph satisfying a predetermined structural similarity threshold value with respect to the query graph from among the set of existing process graphs; a content comparison unit that determines, as a second search candidate, an existing process graph associated with an existing process table satisfying a predetermined content similarity threshold value for the query table, from among the set of existing process tables; and a results management unit that determines search results data for the query data among the first search candidate and the second search candidate.
-
-
-
-
-
-
-
-
-