A rack and a hoist system. The rack is L-shaped with a first planar floor/leg and a second planar floor/foot, which is a solid plate. The first floor has three pairs of wheels with the middle pair larger than the other pairs and a mount to couple to the hoist via a hooked line that couples to a double-hooked line that hooks into apertures through paired mounting plates near the top end of the leg. The foot includes a tag-line mount from which a tag-line may be mounted to help guide movement thereof using the hoist. The foot includes wheels such that when the first floor is tipped up while being lifted, the wheels of the foot engage with the surface while the wheels on the leg are disengaging. There are flanking posts, strap structures, and flanking plates that help to secure the load (e.g. rebars, pipes, and sheet rock).
摘要:
A construction management system for constructing a building including at least one heavy lifting machine for moving a one building element to a mounting position on the building, a central computing unit providing a building information model comprising at least a construction plan comprising a target state of the construction of the building, a three-dimensional model of an actual construction state of the building, and a three-dimensional model of the element, wherein the central computing unit is adapted to determine the mounting position for the element based on the construction plan, the model of the current construction state and on the model of the element.
摘要:
This invention is directed toward a panel framing device. The device comprises a portable framing table that can be driven in a trailer to remote locations and a pre-printed roll of framing tape that is used to tell a worker where different parts of a framed panel will go. The goal of the device is to facilitate the building of structures using a panel approach, with the framing table and template tape minimizing the chances that a worker will make a mistake in either the selection of materials or the location of the materials. The technology can also be used to construct entire walls, which are then either transported to the site, or merely “tilted-up” into place, having been constructed on the slab.
摘要:
Precast wall systems and methods for constructing a high-rise building using the precast wall system is disclosed. In one embodiment, the system includes a plurality of interconnected precast panels, each having a top end plate, a bottom end plate, a plurality of vertical bars disposed between the end plates and a cementitious material encasing the vertical bars and defining a plurality of sides of the respective panel. A first of the precast panels has a first column member half defining a right side of the first panel, a second of the precast panels has a second column member half defining a left side of the second panel such that, when the right side of the first precast panel and the left side of the second precast panel are disposed horizontally adjacent to each other, the first column member half and the second column member half collectively form a column member.
摘要:
A tool kit makes it possible for one person to pick up one or more frangible elongate workpieces such as strips of cement lap siding using a first part of the invention, and properly position each one on, and affix it to, a vertical surface such as an exterior wall using a second part of the invention.
摘要:
The invention comprises a method of forming a concrete structure. The method comprises placing plastic concrete in a form of a desired shape, encasing the concrete in insulating material having insulating properties equivalent to at least 1 inch of expanded polystyrene and allowing the plastic concrete to at least partially cure inside the insulating material. An insulated concrete form and a method of using the insulated concrete form are also disclosed.
摘要:
A construction apparatus for use within an elevator hoistway is provided. The construction apparatus includes span members, each span member having a first end, a second end and a length. Sill attachments are connected to the first end of the span members. The sill attachments are configured to rotate about and seat against a building sill. A support member connected to the second end of the span members. The support members are configured to seat against a second side of the elevator hoistway. The length of the span members is longer than a horizontal distance from the building sill to the second side of the elevator hoistway such that the span members rest in an inclined orientation with respect to a substantially horizontal axis. One or more platforms is supported by one or more forms, the platforms arranged such as to provide a working platform within the elevator hoistway.
摘要:
The invention comprises a method of forming a concrete structure. The method comprises placing plastic concrete in a form of a desired shape, encasing the concrete in insulating material having insulating properties equivalent to at least 1 inch of expanded polystyrene and allowing the plastic concrete to at least partially cure inside the insulating material. An insulated concrete form and a method of using the insulated concrete form are also disclosed.
摘要:
The present invention relates to a method for mounting facade elements (12, 12b-c) on a multi-story building by means of a profile system comprising a first type of vertical profile (1a-d) having a slot extending along the longitudinal axis of the profile, and an inner part of the slot being designed to receive an edge of a first facade element and an outer part of the slot being designed to receive and support a second type of vertical profile, provided with a groove extending along the longitudinal axis of the profile and designed to receive and support an edge of a second facade element. The method comprises: a) mounting two vertical profiles (1a-b) of the first type at a second floor of the building so that the slots are facing each other, and above profiles (1c-d) of the first and second type previously mounted on a first floor, b) transporting a facade element (12), guided by the grooves of the profiles mounted on the first floor until it reaches the vertical profiles mounted on the second floor, c) entering the facade element into the outer part of the slots of the vertical profiles mounted on the second floor, d) continuing transporting the facade element, guided by the outer part of the slots to a mounting position, e) pushing the facade element from the outer part of the slots to the inner part of the slots, f) attaching the facade element to the building, and g) inserting vertical profiles of the second type into the outer part of the slots.
摘要:
The invention relates to an automated mobile production system for fabricating a cement panel or composite cement panel. The system includes a movable container and a conveyor system inside the container aligned along a longitudinal axis of the container. The system further includes a plurality of independent manufacturing stations inside the container and aligned along the conveyor system. The container is preferably an international standard shipping container so that being compact and movable from place to place. Further, the system includes a removable mortar mixing station affixed to the outer top side of the container when the system is in operation, and is removed and stored inside the container during transport of the system.