公开(公告)号:US20190068386A1
公开(公告)日:2019-02-28
申请号:US16114896
申请日:2018-08-28
Applicant: Huawei Technologies Co., Ltd.
Inventor: Shiyong Fu , Yan Zhuang , Rui Hua
Abstract: A network device probes whether a first port of the network device is coupled to power sourcing equipment, and when probing that the first port is coupled to power sourcing equipment, maintain or change the first port to a powered state, and lock the first port as a power drawing port, or when probing that the first port is decoupled to power sourcing equipment, and the network device has a power supply for supplying power, change the first port to a powering state. In this way, the first port may adaptively serve as a power drawing port or a power sourcing port according to a coupled device such that manually distinguished a port during device interconnection is not necessary and a coupling error rate is reduced.
-
公开(公告)号:US20190058254A1
公开(公告)日:2019-02-21
申请号:US15998675
申请日:2018-08-16
Applicant: Huawei Technologies Co., Ltd.
Inventor: Maomao Zhu , Bo Yuan , Rui Hua
CPC classification number: H01Q9/045 , H01Q1/22 , H01Q3/242 , H01Q3/446 , H01Q19/10 , H01Q19/28 , H01Q19/30 , H01Q19/32 , H01Q21/0006 , H01Q21/293 , H04B7/15585
Abstract: An antenna includes a feeding element and at least one non-feeding element. A vertical distance between each non-feeding element and the feeding element falls within a specified threshold, each non-feeding element includes a first conductor that is grounded, a regulator circuit, and a control switch disposed on the first conductor and configured to control the regulator circuit, where the regulator circuit is configured to regulate a current path length of the non-feeding element. The non-feeding element forms a reflector when the regulator circuit is enabled, or the non-feeding element forms a director when the regulator circuit is disabled. A design in which the reflector and the director are compatible is used such that a combination of one feeding element, M directors and N reflectors is implemented for the antenna to achieve a high directive gain and interference suppression capability.
-
公开(公告)号:US11368321B2
公开(公告)日:2022-06-21
申请号:US16802974
申请日:2020-02-27
Applicant: HUAWEI TECHNOLOGIES CO., LTD.
Inventor: Hua Chen , Shiyong Fu , Yan Zhuang , Rui Hua , Qi Dong , Chao Gu
IPC: G06F1/32 , H04L12/10 , G06F1/3209 , G06F1/3203
Abstract: Power sourcing equipment (PSE) and an energy saving method for Power over Ethernet are provided. The PSE includes: a low-power detection component, configured to: detect a power supply port when being connected to the power supply port; and send a first instruction when the power supply port is connected to a valid powered device PD, to instruct a control switch to connect a PSE chip and the power supply port and disconnect the low-power detection component from the power supply port, and instruct a power switch to connect the PSE chip and a power supply; the control switch, configured to: according to the first instruction, connect the PSE chip and the power supply port, and disconnect the low-power detection component from the power supply port; and the power switch, configured to connect the PSE chip to the power supply port according to the first instruction.
-
公开(公告)号:US11329837B2
公开(公告)日:2022-05-10
申请号:US16391021
申请日:2019-04-22
Applicant: HUAWEI TECHNOLOGIES CO., LTD.
Inventor: Shiyong Fu , Yan Zhuang , Jincan Cao , Fuguang Huang , Xueqi Chen , Rui Hua
Abstract: A network device includes a power system, a processor, a power sourcing equipment PSE chip coupled to a first forward power supply port, and a first powered device PD chip coupled to a first reverse power receiving port. A first powered device is connected to the first forward power supply port and the first reverse power receiving port. When detecting that a power failure occurs on the network device, the processor instructs the first PD chip to draw power from the first powered device; the first PD chip draws the power from the first powered device through the first reverse power receiving port, and supplies the obtained power to the power system. Therefore, when a power failure occurs, the network device can continue to obtain power and work properly when the power failure occurs.
-
公开(公告)号:US11309620B2
公开(公告)日:2022-04-19
申请号:US16204564
申请日:2018-11-29
Applicant: Huawei Technologies Co., Ltd.
Inventor: Xinghui Ji , Bo Yuan , Rui Hua
IPC: H01Q1/22 , H01Q1/38 , H01Q9/16 , H01Q19/10 , H01Q5/30 , H01Q1/52 , H01Q21/06 , H01Q15/00 , H01Q21/00 , H01Q21/28 , H01Q9/06 , H01Q5/42
Abstract: A dual-band antenna and a wireless communications device, where the dual-band antenna includes a first antenna arranged on a first printed circuit board (PCB), a second antenna arranged on a second PCB, and a reflection panel. An operating frequency band of the first antenna is a first frequency band. An operating frequency band of the second antenna is a second frequency band. The first frequency band is higher than the second frequency band. The second PCB is disposed between the first PCB and the reflection panel. The reflection panel includes an artificial magnetic conductor. A resonant frequency band of the artificial magnetic conductor includes the second frequency band. The first frequency band is outside the resonant frequency band. The dual-band antenna has a small size.
-
公开(公告)号:US20210392066A1
公开(公告)日:2021-12-16
申请号:US17356276
申请日:2021-06-23
Applicant: Huawei Technologies Co., Ltd.
Inventor: Shiyong Fu , Yan Zhuang , Rui Hua
Abstract: A port adaptation method applied to a network device including a port adaptation apparatus includes probing whether the first port and the second port are connected to power sourcing equipment, and maintaining or switching one of the first port and the second port that is connected to power sourcing equipment as, or to, a powered state, and a state of the other port as, or to, a powering state.
-
公开(公告)号:US20200228353A1
公开(公告)日:2020-07-16
申请号:US16835181
申请日:2020-03-30
Applicant: HUAWEI TECHNOLOGIES CO., LTD.
Inventor: Shiyong Fu , Yan Zhuang , Xiangen Xu , Qi Dong , Peng Xu , Rui Hua
IPC: H04L12/10 , G06F1/28 , G06F1/3296
Abstract: This application discloses an energy-saving power sourcing method. Power sourcing equipment receives an input voltage of a powered device fed back by the powered device, and adjusts, based on the input voltage, a power sourcing voltage that is output to the powered device, so that the input voltage of the powered device is a maximum voltage, thereby reducing a link loss and saving electric power resources of the power sourcing equipment.
-
公开(公告)号:US20190165450A1
公开(公告)日:2019-05-30
申请号:US16204564
申请日:2018-11-29
Applicant: Huawei Technologies Co., Ltd.
Inventor: Xinghui Ji , Bo Yuan , Rui Hua
Abstract: A dual-band antenna and a wireless communications device are disclosed. The dual-band antenna includes a first antenna arranged on a first printed circuit board (PCB), a second antenna arranged on a second PCB, and a reflection panel. An operating frequency band of the first antenna is a first frequency band. An operating frequency band of the second antenna is a second frequency band. The first frequency band is higher than the second frequency band. The second PCB is disposed between the first PCB and the reflection panel. The reflection panel includes an artificial magnetic conductor. A resonant frequency band of the artificial magnetic conductor includes the second frequency band. The first frequency band is outside the resonant frequency band. The dual-band antenna has a small size.
-
公开(公告)号:US20180323981A1
公开(公告)日:2018-11-08
申请号:US16039310
申请日:2018-07-18
Applicant: Huawei Technologies Co.,Ltd.
Inventor: Yan Zhuang , Shiyong Fu , Hua Chen , Xiuju Liang , Jincan Cao , Rui Hua
Abstract: A power over Ethernet (PoE) power supplying method where power sourcing equipment (PSE) and a powered device exchange link layer discovery protocol data units (LLDPDUs). Each of the LLDPDUs includes two power values. Each of the power values indicates requested or allocated power for one of two sets of cable pairs of the Ethernet twisted pair connecting the PSE and the powered device. Accordingly, the supplied powers to the powered device at sets of cable pairs are independent from each other.
-
30.
公开(公告)号:US09268383B2
公开(公告)日:2016-02-23
申请号:US14464514
申请日:2014-08-20
Applicant: Huawei Technologies Co., Ltd.
Inventor: Rui Hua , Ying Gu , Zhangqing He , Jianguang Yang , Tongqiang Cao , Anhu Huang
IPC: G06F1/00 , G06F1/26 , H04L12/10 , H04L12/413
CPC classification number: G06F1/26 , H04L12/10 , H04L12/413
Abstract: The application pertains to a method for an Ethernet power sourcing equipment to provide electric power to one or more Ethernet powered devices. A controlling apparatus determines a power supply mode of the Ethernet power sourcing equipment, and determines high-power Ethernet powered device(s) and low-power Ethernet powered device(s) among the Ethernet powered devices. The controlling apparatus sets a power supply priority for each of the Ethernet powered devices. In one power supply mode, the power supply priority of a high-power Ethernet powered device is same as or lower than the lowest priority of the low-power Ethernet powered device(s). When a new Ethernet powered device is connected to the Ethernet power sourcing equipment, the controlling apparatus determines whether to supply electric power to the new Ethernet powered device according to its power supply priority.
Abstract translation: 该应用涉及以太网供电设备向一个或多个以太网供电的设备提供电力的方法。 控制设备确定以太网供电设备的电源模式,并确定以太网供电设备中的大功率以太网供电设备和低功率以太网供电设备。 控制装置为每个以太网供电设备设置电源优先级。 在一个电源模式下,大功率以太网供电设备的电源优先级低于或低于低功率以太网供电设备的最低优先级。 当新的以太网供电设备连接到以太网供电设备时,控制设备根据其电源优先级确定是否向新的以太网供电设备供电。
-
-
-
-
-
-
-
-
-