摘要:
The disclosure relates to a paving screed for a road paver that comprises a screed plate, a heating element and a fastening device for pressing the heating element onto the screed plate. The fastening device comprises an actuating member and an elastic element. The actuating member is configured to deflect through its operation the elastic element directly or indirectly by a predetermined amount, wherein the elastic element applies a predetermined force directly or indirectly onto the heating element and biases the heating element against the screed plate.
摘要:
Embodiments of the present invention are directed to a method for performing non-contact based determination of the position of an implement. In one embodiment, the method includes using a non-contact based measurement system to determine a first measurement comprising the position of the implement relative to a mobile machine coupled with the implement, determining a second measurement comprising the geographic position of the mobile machine and determining the geographic position of the implement using the first measurement and the second measurement.
摘要:
A telescopic screed is provided which includes main section and telescopic section screeds, the main section screed includes a screed frame and a base plate; the telescopic section screeds are arranged on the left side and/or the right side of the main section screed and include a cross slope framework, a cross slope driver, at least two multistage sliding pipes, a telescopic frame, a telescopic driver, a telescopic section frame, a telescopic section base plate and an elevation difference driver; the cross slope framework is pivotally connected with the main section screed to adjust the cross slope; the multistage sliding pipes are used for transversely guiding the telescopic frames to achieve the telescopic ability of the telescopic section screeds; the telescopic section frame is connected with the corresponding telescopic frame to move up and down to adjust the relative height between the telescopic section frame and the telescopic frame.
摘要:
A paving machine for reducing transition marks in a mat. The paving machine may comprise a frame, a tow arm, a screed assembly, a sensor and a controller. The screed assembly includes a main screed plate and an extension plate. The main screed plate is configured to pave a first surface section of the mat. The extension plate includes an extension trailing edge having an inner end. The extension plate is configured to pave a second surface section of the mat. The sensor is configured to sense transition marks in the mat proximal to an intersection between the first and second surface sections and to transmit data indicative of such to the controller. The controller may be configured to determine from the data received from the sensor when the inner end is disposed above or below the first plane, and move the inner end to the first plane.
摘要:
The present invention relates to a paving method of forming an intermediate layer, where a non-solidifying rubberized asphalt penetrates, on an asphalt mixture for base layer or a cement concrete to provide a permeable layer and an impermeable (intermediate) layer simultaneously with a single paving process for surface layer. The waterproofing and draining functions of the non-solidifying rubberized asphalt layer completely block water or moisture from penetrating into the underlying layer and protect the roads from damage due to freezing temperature with the moisture penetrating into the group in winter. The non-solidifying rubberized asphalt layer constituting the intermediate layer has the non-solidifying rubberized asphalt melt down and move upwards under the paving temperature and pressure applied during the paving process of forming a surface layer and firmly bind with the base layer, thereby completing an integrated pavement structure with enhanced water resistance and durability.
摘要:
An apparatus for screeding concrete to produce a level finished surface that includes a frame assembly, a boom assembly secured to the frame assembly at a first end and to a screed head at a second end, and a track drive assembly having a pair of driven tracks spaced from at least one wheel, the tracks and the wheels each rotatably secured to the rigid frame assembly.
摘要:
A concrete finishing machine includes a mobile frame supported above the slab on front and rear wheels with at least one screed roller and a plurality of vibrators are suspended from the frame between the front and rear wheels. The front and rear wheels are rotatable at least ninety degrees between a longitudinally directed traveling orientation and a laterally directed concrete finishing orientation. The front and rear wheels are driven and steerable so that the mobile frame may travel longitudinally down a lane of a road, and then upon pivoting of the wheels, move laterally over a hole in an adjacent lane having uncured concrete to be finished by the finishing machine.
摘要:
A smart steering assembly for a modularly configurable paving operations system includes an end structure at either end of a modular framework. Each end structure has a front and rear adjustable leg with a steerable crawler connected to each leg. A control system can rotate one or more steerable crawlers via the smart steering assembly to drive, steer, or reconfigure the system in response to user input or data received from one or more sensors. Steerable crawlers may be articulated independently or in unison via smart steering cylinders or actuators incorporating onboard sensors connected to the control system. Adjustable legs may alternatively be mounted to the end structure via leg pivots.
摘要:
A method for preparing a screed assembly for starting a new paving operation is provided. The screed assembly is reset to a pre-stored screed position in response to a user command. A user defined paving depth associated with the new paving operation is received. The screed assembly is positioned to rest on a paving surface and to a float mode in response to a user command. An angle of attack of the screed assembly associated with the new paving operation is set in response to a user command. Further, a height of the screed assembly is adjusted based on the user defined paving depth. A confirmation message indicative of the screed assembly prepared for the new paving operation is provided to a user.
摘要:
The invention provides a bituminous composition, a process for preparing a bituminous paving composition and process for bituminous paving having lower mixing, paving, and compaction temperatures than for conventional hot-mix paving while retaining sufficient performance characteristics of conventional hot-mix paving. The inventive paving process comprises the steps of injecting a foamable solution comprising a lubricating substance into a heated, asphalt binder to provide a heated, foamed mixture; adding the heated, foamed mixture to a suitable, heated aggregate; further mixing the heated, foamed mixture and heated aggregate to coat the heated aggregate with the heated, foamed, asphalt binder to form a heated paving material; supplying the heated paving material to a paving machine; applying the heated paving material by the paving machine to a surface to be paved; and compacting the applied paving material to form a paved surface.