-
公开(公告)号:US09534348B2
公开(公告)日:2017-01-03
申请号:US14623375
申请日:2015-02-16
发明人: Federico Rio , Ricky Leon Mings
CPC分类号: E01C19/46 , E01C19/22 , E01C19/42 , E01C19/48 , E01C23/02 , E01C2201/16 , E01C2301/00
摘要: A paving machine for reducing transition marks in a mat. The paving machine may comprise a frame, a tow arm, a screed assembly, a sensor and a controller. The screed assembly includes a main screed plate and an extension plate. The main screed plate is configured to pave a first surface section of the mat. The extension plate includes an extension trailing edge having an inner end. The extension plate is configured to pave a second surface section of the mat. The sensor is configured to sense transition marks in the mat proximal to an intersection between the first and second surface sections and to transmit data indicative of such to the controller. The controller may be configured to determine from the data received from the sensor when the inner end is disposed above or below the first plane, and move the inner end to the first plane.
摘要翻译: 用于减少垫子中过渡痕迹的铺路机。 铺路机可以包括框架,拖臂,熨平板组件,传感器和控制器。 熨平板组件包括主刮板和延伸板。 主熨平板被配置为铺设垫的第一表面部分。 延伸板包括具有内端的延伸后缘。 延伸板被配置成铺设垫子的第二表面部分。 传感器被配置为感测靠近第一和第二表面部分之间的交叉点的垫中的过渡标记,并将指示这样的数据传送到控制器。 控制器可以被配置为当内端设置在第一平面的上方或下方时从从传感器接收的数据确定,并且将内端移动到第一平面。
-
2.
公开(公告)号:US20160312415A1
公开(公告)日:2016-10-27
申请号:US14691611
申请日:2015-04-21
IPC分类号: E01C23/02
CPC分类号: E01C23/02 , E01C23/025 , E01C23/026
摘要: A tool for concrete construction has a base provided with downwardly open channel for receiving an expansion joint with movement of said tool effecting straightening of expansion joint. Generally upwardly directed flanges are structured to be cooperating with a straight edge for facilitating straight movement of tool during straightening of expansion joint. The tool may also be employed to establish control joints. Related methods arc provided.
摘要翻译: 用于混凝土结构的工具具有底部,其具有向下开口的通道,用于接收具有所述工具的运动的膨胀接头,从而实现膨胀接头的拉直。 通常向上指向的凸缘被构造成与直边配合,以便于在膨胀接头矫直期间工具的直线运动。 该工具也可用于建立控制关节。 提供相关方法。
-
公开(公告)号:US20170159250A1
公开(公告)日:2017-06-08
申请号:US15325688
申请日:2015-03-05
申请人: GAEART CO., LTD
CPC分类号: E01C23/02 , E01C7/35 , E01C11/24 , E01C19/43 , E01C19/48 , E01C19/4846 , E01C23/021 , E01C23/025
摘要: Provided is longitudinal groove forming technology that is easy to execute. A longitudinal groove forming instrument 11 is provided on a base plate bottom face of a screed 7, 8. The longitudinal groove forming instrument 11 comprises a plurality of beam members 12. The beam members 12 are disposed in parallel with the direction of travel of the screed as the axial direction. A longitudinal groove 20 is formed by the beam members 12 pressing into a leveled face when leveling a pavement face and moving in the direction of travel for leveling while the beam members are being pressed down.
-
4.
公开(公告)号:US09506206B2
公开(公告)日:2016-11-29
申请号:US14691611
申请日:2015-04-21
IPC分类号: E01C23/02
CPC分类号: E01C23/02 , E01C23/025 , E01C23/026
摘要: A tool for concrete construction has a base provided with downwardly open channel for receiving an expansion joint with movement of tool effecting straightening of expansion joint. Generally upwardly directed flanges are structured to be cooperating with a straight edge for facilitating straight movement of tool during straightening of expansion joint. The tool may also be employed to establish control joints. Related methods are provided.
摘要翻译: 用于混凝土结构的工具具有底部,其具有向下开口的通道,用于接收具有伸缩接头矫直的工具的移动的膨胀接头。 通常向上指向的凸缘被构造成与直边配合,以便于在膨胀接头矫直期间工具的直线运动。 该工具也可用于建立控制关节。 提供相关方法。
-
公开(公告)号:US1950673A
公开(公告)日:1934-03-13
申请号:US34399129
申请日:1929-03-02
申请人: HELTZEL JOHN N
发明人: HELTZEL JOHN N
IPC分类号: E01C23/02
CPC分类号: E01C23/02
-
公开(公告)号:US20160237629A1
公开(公告)日:2016-08-18
申请号:US14623375
申请日:2015-02-16
发明人: Federico Rio , Ricky Leon Mings
CPC分类号: E01C19/46 , E01C19/22 , E01C19/42 , E01C19/48 , E01C23/02 , E01C2201/16 , E01C2301/00
摘要: A paving machine for reducing transition marks in a mat. The paving machine may comprise a frame, a tow arm, a screed assembly, a sensor and a controller. The screed assembly includes a main screed plate and an extension plate. The main screed plate is configured to pave a first surface section of the mat. The extension plate includes an extension trailing edge having an inner end. The extension plate is configured to pave a second surface section of the mat. The sensor is configured to sense transition marks in the mat proximal to an intersection between the first and second surface sections and to transmit data indicative of such to the controller. The controller may be configured to determine from the data received from the sensor when the inner end is disposed above or below the first plane, and move the inner end to the first plane.
摘要翻译: 用于减少垫子中过渡痕迹的铺路机。 铺路机可以包括框架,拖臂,熨平板组件,传感器和控制器。 熨平板组件包括主熨斗板和延伸板。 主熨平板被配置为铺设垫的第一表面部分。 延伸板包括具有内端的延伸后缘。 延伸板被配置成铺设垫子的第二表面部分。 传感器被配置为感测靠近第一和第二表面部分之间的交叉点的垫中的过渡标记,并将指示这样的数据传送到控制器。 控制器可以被配置为当内端设置在第一平面的上方或下方时从从传感器接收的数据确定,并且将内端移动到第一平面。
-
公开(公告)号:US2014894A
公开(公告)日:1935-09-17
申请号:US49105230
申请日:1930-10-24
申请人: HELTZEL JOHN N
发明人: HELTZEL JOHN N
IPC分类号: E01C23/02
CPC分类号: E01C23/02
-
公开(公告)号:US1997216A
公开(公告)日:1935-04-09
申请号:US32653828
申请日:1928-12-17
申请人: HELTZEL JOHN N
发明人: HELTZEL JOHN N
IPC分类号: E01C23/02
CPC分类号: E01C23/02
-
公开(公告)号:US1982387A
公开(公告)日:1934-11-27
申请号:US22316127
申请日:1927-09-30
申请人: HELTZEL JOHN N
发明人: HELTZEL JOHN N
-
公开(公告)号:US12065580B2
公开(公告)日:2024-08-20
申请号:US17548767
申请日:2021-12-13
发明人: Brian Cancio , Ashley Seybert , Lucas Greenawalt
IPC分类号: C08L95/00 , C09D195/00 , E01C23/02
CPC分类号: C09D195/005 , C08L95/005 , C08L2555/50 , C08L2555/54 , C08L2555/82 , C08L2555/84 , E01C23/02
摘要: Provided herein is an asphalt membrane emulsion for reducing voids in an asphalt joint that includes asphalt, an asphalt modifier, mineral filler, an emulsifier, and water. Provided herein is a method of making an asphalt membrane emulsion, the method including: forming a first phase; forming a second phase; pumping the first phase and the second phase into a colloid mill; and mixing the first phase and second phase into the colloid mill to form the asphalt membrane emulsion. The first phase includes asphalt, asphalt modifier, and mineral filler. The second phase includes water and an emulsifier. A method of applying an asphalt membrane emulsion to fill a crack is also provided.
-
-
-
-
-
-
-
-
-