Methods and devices for processing and retrieving defect information of product

    公开(公告)号:US12092587B2

    公开(公告)日:2024-09-17

    申请号:US17765595

    申请日:2021-04-30

    CPC classification number: G01N21/95 G01N2021/9511

    Abstract: The present disclosure provides a method for processing defect information of a product, which includes the following steps of: acquiring defect information on a current film layer and defect information on historical film layers; determining whether defect information exists at a target location of the historical film layer if defect information exists at a target location of the current film layer; if defect information exists for a corresponding location to the target location in at least one of the historical film layers, deleting the defect information detected at the target location in the current film layer; and if no defect information exists for the target location in any of the historical film layers, retaining the defect information detected at the target location in the current film layer. According to this, for the defect information on the current film layer, only the defect information caused by factors of the current film layer may be retained, and the defect information caused by the historical film layers will not be retained, and thus, on the one hand, the stored data volume may be reduced, and on the other hand, the complexity of subsequent analysis of defect information may be simplified.

    INTELLIGENT MANAGEMENT SYSTEM, INTELLIGENT MANAGEMENT METHOD, AND COMPUTER-PROGRAM PRODUCT

    公开(公告)号:US20220318697A1

    公开(公告)日:2022-10-06

    申请号:US17311348

    申请日:2020-09-03

    Abstract: An intelligent management system is provided. The intelligent management system includes an intelligent supply chain manager configured to generate supply chain limitations based on a supply chain knowledge graph comprising information of at least one of demand planning and forecasting, inventory planning, sales planning and forecasting, or budget planning; generate industry chain contingencies based on an industry chain event knowledge graph comprising information of at least one of event urgency level, event importance level, and event impact spread level; generate constraints on supply chain based on supply chain limitations and industry chain contingencies; and generate a proposal and provide the proposal to business systems for supply chain planning based on the constraints on supply chain, the proposal comprising proposal for at least one of demand re-planning and re-forecasting, inventory re-planning, sales re-planning and re-forecasting, or budget re-planning.

Patent Agency Ranking