-
公开(公告)号:US12236362B2
公开(公告)日:2025-02-25
申请号:US17044276
申请日:2019-12-20
Applicant: BOE TECHNOLOGY GROUP CO., LTD.
Inventor: Zhaoyue Li , Dong Chai , Yuanyuan Lu , Hong Wang
Abstract: An inference computing apparatus comprises at least one processor and a memory with program instructions stored therein, the program instructions can be executed by the at least one processor to cause the inference computing apparatus to perform the following operations: receiving a first inference model from a model training apparatus, the first inference model being obtained through a model training by the model training apparatus based on a first training sample library, the first training sample library comprising training samples from historical data generated in a manufacturing stage; performing an inference computing on data to be processed generated in the manufacturing stage based on the first inference model to obtain the inference result which is sent to a user-side device; and evaluating performance of the first inference model to determine whether the first inference model needs to be updated, and if yes, updating the first inference model.
-
公开(公告)号:US12020516B2
公开(公告)日:2024-06-25
申请号:US17044160
申请日:2019-12-20
Applicant: BOE TECHNOLOGY GROUP CO., LTD.
Inventor: Meijuan Zhang , Yaoping Wang , Zhaoyue Li , Yuanyuan Lu , Dong Chai , Hong Wang
IPC: G07C3/14 , B29C45/76 , G01N21/88 , G06F11/36 , G06F18/2451 , G06Q10/0639 , G06T7/00 , H01L21/67
CPC classification number: G07C3/14 , B29C45/76 , G01N21/8851 , G06F11/3688 , G06F18/2451 , G06Q10/06395 , G06T7/001 , H01L21/67288 , G01N2021/8887
Abstract: A method and a device for processing product manufacturing messages, and an electronic device are disclosed. The method for processing product manufacturing messages includes: monitoring a plurality of product manufacturing messages; establishing a product defect analysis task queue based on the plurality of product manufacturing messages; distributing product defect analysis tasks to product manufacturing assisting devices based on the product defect analysis task queue, wherein the product defect analysis tasks include a task of identifying product defect content based on a defect identification model; wherein the product defect content includes any one or more of: product defect type, product defect location, and product defect size.
-
公开(公告)号:US12001400B2
公开(公告)日:2024-06-04
申请号:US17312965
申请日:2020-08-11
Applicant: BOE TECHNOLOGY GROUP CO., LTD.
IPC: G06F16/178 , G06F3/14 , G06F8/65 , G06F9/445 , G06F16/182
CPC classification number: G06F16/178 , G06F3/14 , G06F8/65 , G06F9/44526 , G06F16/183
Abstract: A method for synchronizing a file includes acquiring a first synchronization instruction for a target application. The first synchronization instruction is used to instruct to synchronize a target file generated by the target application to a server of an auxiliary application, the target application is a graphics drawing application, and the auxiliary application is a product lifecycle management (PLM) application. The method includes acquiring the target file based on the first synchronization instruction and sending a second synchronization instruction carrying the target file to the server based on a target interface of a synchronization plug-in of the target application. The target interface of the synchronization plug-in is configured to communicate with the server.
-
公开(公告)号:US11928311B2
公开(公告)日:2024-03-12
申请号:US17357955
申请日:2021-06-24
Inventor: Ming Ding , Li Ma , Yang Wu , Wanwan Tang , Dachuan Wang , Hong Wang , Guangyu Shao , Chaozheng Liu
IPC: G06F3/0482 , G06F3/04817 , G16H10/60 , G16H40/20 , H04L67/12 , H04L67/306 , H04L67/54 , H04L67/55 , H04L67/53
CPC classification number: G06F3/0482 , G06F3/04817 , G16H10/60 , G16H40/20 , H04L67/12 , H04L67/306 , H04L67/54 , H04L67/55 , H04L67/53
Abstract: The present application discloses a communication method, a terminal, a server, a communication system, a computer device and a medium. The communication method includes that a server establishes a connection and feeds back a display control in response to requests of a first terminal and a second terminal; then, the server feeds back function feedback information in response to a function request of the first terminal, and feeds back function feedback information in response to a menu request of the second terminal; and the servers presents multiple interface components and maintains and updates each interface component in response to management operation of a third user.
-
公开(公告)号:US11908049B2
公开(公告)日:2024-02-20
申请号:US17620613
申请日:2020-12-26
Inventor: Shuyi Li , Wenjuan Li , Guangyu Shao , Hong Wang
IPC: G06T11/20 , G06F16/26 , G06F3/0482
CPC classification number: G06T11/206 , G06F16/26 , G06F3/0482 , G06T2200/24
Abstract: A data processing device includes visualization component(s) of an option group and at least one chart component. The option group includes a first option and a second option. The at least one chart component has a subscription relationship with the first option of the option group. The at least one chart component is configured to display first chart(s) belonging to the at least one chart component in response to operation of selecting the first option. The at least one chart component has a subscription relationship with the second option of the option group. The at least one chart component is further configured to display second chart(s) belonging to the at least one chart component in response to operation of selecting the second option.
-
公开(公告)号:US20240028983A1
公开(公告)日:2024-01-25
申请号:US18246891
申请日:2022-02-22
Inventor: Xieming Su , Xuemei Lin , Yang Li , Xixun Liu , Nan Liu , Chuan Wang , Zhai Lu , Guihao Liu , Hua Zhang , Hong Wang , Jianmin Wu
IPC: G06Q10/0631
CPC classification number: G06Q10/0631
Abstract: Provided are a method of production scheduling for a product, including: acquiring basic data for performing a production scheduling for the product; determining at least one production process from a plurality of production processes of the product as a bottleneck process according to the basic data; performing the production scheduling for the product using a linear programming solution model to obtain a first scheduling result of the product; merging a plurality of first entries corresponding to same products having production dates falling within a same time range into a second entry to obtain a plurality of second entries, wherein each of the second entries includes a production quantity of a same product in a time range; and acquiring orders corresponding to each product and sorting the orders of the product according to at least one of an order delivery date and an order priority to obtain an order sorting result.
-
公开(公告)号:US11854282B2
公开(公告)日:2023-12-26
申请号:US17357927
申请日:2021-06-24
Applicant: BOE Technology Group Co., Ltd.
Inventor: Chuan Wang , Xinyu Miao , Xiaohong Wei , Nan Liu , Yongyang Yan , Yunan Wang , Hong Wang , Yiming Lei
IPC: G06V30/146 , G06T5/00 , G06V30/12 , G06V30/10 , G06V10/22
CPC classification number: G06V30/1478 , G06T5/006 , G06V30/12 , G06V10/22 , G06V30/10
Abstract: The present disclosure provides a method for correcting an OCR text position, a storage medium and an electronic device. The method includes: determining a first slope of each text block in an OCR recognition result of a to-be-processed image; fitting a tilt field function in accordance with the first slope of each text block; determining an offset value of each text block in accordance with the tilt field function; and correcting a position of each text block in accordance with the offset value.
-
公开(公告)号:US11782705B2
公开(公告)日:2023-10-10
申请号:US17514323
申请日:2021-10-29
Inventor: Chunhu Tian , Guangyu Shao , Wenjuan Li , Hong Wang
CPC classification number: G06F8/77 , G06F9/44521
Abstract: This application discloses a scene switching method, device and medium. The method includes after having loaded a first Activity interface of an application development project, removing a first scene contained in the first Activity interface in response to an operation of loading a second Activity interface of the application development project loading the second Activity interface and loading the first scene in the second Activity interface, replacing the first scene with a second scene in the second Activity interface, the multiple scenes being provided by a scene development project imported into the application development project, and the first Activity interface and the second Activity interface being developed and obtained by the application development project.
-
公开(公告)号:US11471095B2
公开(公告)日:2022-10-18
申请号:US16029256
申请日:2018-07-06
Applicant: BOE TECHNOLOGY GROUP CO., LTD.
IPC: A61B5/00 , G06T7/00 , A61B5/01 , A61B5/024 , A61B5/08 , G06T3/20 , G06T3/60 , G06T7/11 , H04N5/235 , G06K9/62
Abstract: A tongue-image-based diagnostic system and a tongue-image-based diagnostic method are disclosed. The diagnostic system includes a parameter collector configured to acquire environmental parameter information; a model establishment circuitry configured to perform a training process using image training data and the environmental parameter information and establish an estimation model; and an analysis circuitry configured to analyze acquired image information using the estimation model, and generate an analysis result corresponding to the acquired image information.
-
10.
公开(公告)号:US20220318697A1
公开(公告)日:2022-10-06
申请号:US17311348
申请日:2020-09-03
Applicant: BOE Technology Group Co., Ltd.
Inventor: Nan Liu , Chuan Wang , Xuemei Lin , Jianmin Wu , Hong Wang
Abstract: An intelligent management system is provided. The intelligent management system includes an intelligent supply chain manager configured to generate supply chain limitations based on a supply chain knowledge graph comprising information of at least one of demand planning and forecasting, inventory planning, sales planning and forecasting, or budget planning; generate industry chain contingencies based on an industry chain event knowledge graph comprising information of at least one of event urgency level, event importance level, and event impact spread level; generate constraints on supply chain based on supply chain limitations and industry chain contingencies; and generate a proposal and provide the proposal to business systems for supply chain planning based on the constraints on supply chain, the proposal comprising proposal for at least one of demand re-planning and re-forecasting, inventory re-planning, sales re-planning and re-forecasting, or budget re-planning.
-
-
-
-
-
-
-
-
-