公开(公告)号:US20150063923A1
公开(公告)日:2015-03-05
申请号:US14470206
申请日:2014-08-27
Applicant: Guangzhou Institute of Building Science Co., Ltd. , Technology Development Center of Guangzhou Institute of Building Science Co., Ltd.
Inventor: Yuliang QI , Mengxiong TANG , Hesong HU
IPC: E02D5/52
CPC classification number: E02D5/526
Abstract: The present invention relates to a quick coupling for pipe pile, comprising an upper end plate, a lower end plate and a screw hook made of spring steel for coupling the upper and lower end plate, a plurality of tapped holes are uniformly provided on the upper end plate, a plurality of holes corresponding to the tapped holes are provided on the lower end plate, a lock hole is positioned at the lower portion of the hole, while the cross-section area of the lock hole is bigger than the cross-section area of the hole. One end of the screw hook is provided with a screw end mating with the tapped hole on the upper end plate, while the other end is provided with a hook end mating with the lock hole on the lower end plate, whereby the upper and lower end plate can be coupled firmly.
Abstract translation: 本发明涉及一种用于管桩的快速接头,包括上端板,下端板和用于连接上端板和下端板的弹簧钢制成的螺纹钩,多个螺纹孔均匀地设置在上部 在所述下端板上设置与所述螺纹孔对应的多个孔,在所述孔的下部设有锁定孔,同时所述锁定孔的截面积大于所述截面 孔的面积。 螺丝钩的一端设置有与上端板上的螺纹孔配合的螺纹端,另一端设有与下端板上的锁定孔配合的钩端,由此上端和下端 板可以牢固地连接。
-
">2.
公开(公告)号:US20190236373A1
公开(公告)日:2019-08-01
申请号:US16245756
申请日:2019-01-11
Inventor: Hesong HU , Jian SU , Zhongtian LU , Junyi WEN , Zhuo YANG , Lingsheng TAN , Chaowen WANG , Jieming LI
CPC classification number: G06K9/00718 , G06K9/00201 , G08B7/066
Abstract: The present disclosure discloses a data transmission system of safety patrol on construction project site based on “internet plus” according to the present disclosure comprises a patrol apparatus for collecting and transmitting an on-site panorama image, 3D point cloud data of the scene, location information and construction on-site data; a cloud computing platform for receiving the on-site panorama image, the 3D point cloud data of the scene, the location information and the construction on-site data, and reconstructing a 3D model of a patrol scene based on the panorama images, the 3D point cloud data of the scene, the location information and the construction on-site data; a safety patrol data terminal providing inspection/browse to construction site; the present disclosure enable users to patrol in construction project remotely, reducing workload of the safety production management personnel, improving patrol efficiency, enhancing the intuitive reality of the patrol and the safety patrol level of the construction project; the inspection result is transferred electronically, ensuring the time efficiency of project patrol inspection.
-
3.
公开(公告)号:US20220081863A1
公开(公告)日:2022-03-17
申请号:US17158718
申请日:2021-01-26
Applicant: Guangzhou Municipal Engineering Testing Co., Ltd. , Guangzhou Institute of Building Science Co., Ltd. , Guangzhou Construction Engineering Co., Ltd. , Guangzhou Municipal Construction Group Co., LTD.
Inventor: Mengxiong TANG , Zhiguo ZHOU , Xiaoli SUN , Jun YANG , Hesong HU
Abstract: Provided is a drilling apparatus, comprising a PHC pipe cased pile having a drilling section for containing fluid and a hammer element arranged inside the cavity of the PHC pipe cased pile which moves along the drilling direction till the bottom of the drilling section. As the hammer element moves along the drilling direction till the bottom of the drilling section, a localized hydraulic force will be induced in the fluid contained in the drilling section of the PHC pipe cased pile by a sharp rise in the fluid pressure in addition to the impact force directly acted on the rock and soil by the hammer element. Under action of the hydraulic force and the impact force, the surrounding soft rock stratum could be crushed and the rock stratum with higher strength is left intact, that is, the drilling apparatus proceeds until harder rock. At this point, concrete casting will bond with the harder rock, resulting in a better bearing capacity of the PHC pipe cased pile foundation.
-
公开(公告)号:US20210292987A1
公开(公告)日:2021-09-23
申请号:US16880722
申请日:2020-05-21
Applicant: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO.,LTD. , Guangzhou Construction Engineering Co., Ltd
Inventor: Mengxiong TANG , Hang CHEN , Hesong HU
Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.
-
5.
公开(公告)号:US20210040703A1
公开(公告)日:2021-02-11
申请号:US16862746
申请日:2020-04-30
Applicant: Guangzhou Institute of Building Science Co., Ltd. , Guangzhou Testing Centre of Construction Quality and Safety Co., Ltd.
Inventor: Hesong HU , Mengxiong TANG , Chunlin LIU
Abstract: Provided is a construction method for foundation pit support utilizing prefabricated large-diameter pipe pile, through this method the pipe pile can be sunk into a hole being drilled. The method applies to a large-diameter pipe pile being sunk. All of components, such as the prefabricated capping beam configured to fix all pile heads and the prefabricated waist beam configured to secure the pile bodies, can ensure the excellent fixture of the pipe piles during the construction of the foundation pit. This method has a good retaining and protecting effect when applied to construction of a deep foundation pit requiring large-diameter pipe pile. It can reduce the environmental impact caused by waste soil and mud discharge in traditional cast-in-place construction, and the use of prefabricated components decreased the construction period and improved the construction efficiency.
-
-
-
-