QUICK COUPLING FOR PIPE PILE
    1.
    发明申请
    QUICK COUPLING FOR PIPE PILE 有权
    管道快速接头

    公开(公告)号:US20150063923A1

    公开(公告)日:2015-03-05

    申请号:US14470206

    申请日:2014-08-27

    CPC classification number: E02D5/526

    Abstract: The present invention relates to a quick coupling for pipe pile, comprising an upper end plate, a lower end plate and a screw hook made of spring steel for coupling the upper and lower end plate, a plurality of tapped holes are uniformly provided on the upper end plate, a plurality of holes corresponding to the tapped holes are provided on the lower end plate, a lock hole is positioned at the lower portion of the hole, while the cross-section area of the lock hole is bigger than the cross-section area of the hole. One end of the screw hook is provided with a screw end mating with the tapped hole on the upper end plate, while the other end is provided with a hook end mating with the lock hole on the lower end plate, whereby the upper and lower end plate can be coupled firmly.

    Abstract translation: 本发明涉及一种用于管桩的快速接头,包括上端板,下端板和用于连接上端板和下端板的弹簧钢制成的螺纹钩,多个螺纹孔均匀地设置在上部 在所述下端板上设置与所述螺纹孔对应的多个孔,在所述孔的下部设有锁定孔,同时所述锁定孔的截面积大于所述截面 孔的面积。 螺丝钩的一端设置有与上端板上的螺纹孔配合的螺纹端,另一端设有与下端板上的锁定孔配合的钩端,由此上端和下端 板可以牢固地连接。

    "> Data Transmission System of Safety Patrol on Construction Project Site Based on

    公开(公告)号:US20190236373A1

    公开(公告)日:2019-08-01

    申请号:US16245756

    申请日:2019-01-11

    CPC classification number: G06K9/00718 G06K9/00201 G08B7/066

    Abstract: The present disclosure discloses a data transmission system of safety patrol on construction project site based on “internet plus” according to the present disclosure comprises a patrol apparatus for collecting and transmitting an on-site panorama image, 3D point cloud data of the scene, location information and construction on-site data; a cloud computing platform for receiving the on-site panorama image, the 3D point cloud data of the scene, the location information and the construction on-site data, and reconstructing a 3D model of a patrol scene based on the panorama images, the 3D point cloud data of the scene, the location information and the construction on-site data; a safety patrol data terminal providing inspection/browse to construction site; the present disclosure enable users to patrol in construction project remotely, reducing workload of the safety production management personnel, improving patrol efficiency, enhancing the intuitive reality of the patrol and the safety patrol level of the construction project; the inspection result is transferred electronically, ensuring the time efficiency of project patrol inspection.

    CONSTRUCTION METHOD FOR POURING CONCRETE IN KARST CAVE

    公开(公告)号:US20210292987A1

    公开(公告)日:2021-09-23

    申请号:US16880722

    申请日:2020-05-21

    Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.