Method and an elevator arrangement

    公开(公告)号:US09809424B2

    公开(公告)日:2017-11-07

    申请号:US13779091

    申请日:2013-02-27

    CPC classification number: B66B20/00 B66B9/187 B66B11/0045 B66B19/00

    Abstract: A method of constructing an elevator, the elevator including a hoistway, an elevator car, a first movable support structure in the hoistway above the elevator car, for supporting the elevator car with a roping, and a roof structure, separate from the movable support structure, in the hoistway above the support structure, where the elevator car is used for transporting passengers and/or goods, and thereafter the first movable support structure is lifted higher in the hoistway, and thereafter the elevator car is used again for transporting passengers and/or goods. The method includes lifting the roof structure higher in the hoistway so as to make more room below the roof structure, the roof structure being a movable roof structure, and in that the movable roof structure is lifted in the hoistway taking support for the lift from a second movable support structure mounted in the hoistway above the roof structure.

    METHOD IN THE MANUFACTURE OF AN ELEVATOR
    2.
    发明申请
    METHOD IN THE MANUFACTURE OF AN ELEVATOR 有权
    电梯的制造方法

    公开(公告)号:US20120272612A1

    公开(公告)日:2012-11-01

    申请号:US13453603

    申请日:2012-04-23

    Abstract: Method in the manufacture of an elevator, in which method the parts of a platform, more particularly its support structure, are used for forming the structure that supports the machinery of the final machine room of the elevator, which platform has earlier been in its position in a position disposed lower in the elevator hoistway, and which platform was used in the aforementioned lower disposed position for supporting the machinery.

    Abstract translation: 电梯的制造方法,其中使用平台的部件,尤其是其支撑结构的部件来形成支撑电梯的最终机房的机构的结构,该平台早已处于其位置 在电梯井道中位于下方的位置,并且在上述下部设置位置使用哪个平台用于支撑机械。

    METHOD AND AN ELEVATOR ARRANGEMENT
    3.
    发明申请
    METHOD AND AN ELEVATOR ARRANGEMENT 有权
    方法和电梯装置

    公开(公告)号:US20130233655A1

    公开(公告)日:2013-09-12

    申请号:US13779091

    申请日:2013-02-27

    CPC classification number: B66B20/00 B66B9/187 B66B11/0045 B66B19/00

    Abstract: A method of constructing an elevator, the elevator including a hoistway, an elevator car, a first movable support structure in the hoistway above the elevator car, for supporting the elevator car with a roping, and a roof structure, separate from the movable support structure, in the hoistway above the support structure, where the elevator car is used for transporting passengers and/or goods, and thereafter the first movable support structure is lifted higher in the hoistway, and thereafter the elevator car is used again for transporting passengers and/or goods. The method includes lifting the roof structure higher in the hoistway so as to make more room below the roof structure, the roof structure being a movable roof structure, and in that the movable roof structure is lifted in the hoistway taking support for the lift from a second movable support structure mounted in the hoistway above the roof structure.

    Abstract translation: 一种构造电梯的方法,电梯包括井道,电梯轿厢,电梯轿厢上方的井道中的第一可移动支撑结构,用于支撑具有绳索的电梯轿厢和与可移动支撑结构分离的屋顶结构 在电梯轿厢用于运送乘客和/或货物的支撑结构上方的井道中,然后第一可移动支撑结构在井道中提升得较高,之后电梯轿厢再次用于运送乘客和/ 或商品。 该方法包括在井道中升高屋顶结构,以便在屋顶结构下方形成更多的空间,屋顶结构是可移动的屋顶结构,并且可移动屋顶结构在井道中被提升,从而支撑升降机 安装在屋顶结构上方的井道中的第二可移动支撑结构。

    Procedure and apparatus for installing the overspeed governor of an
elevator
    4.
    发明授权
    Procedure and apparatus for installing the overspeed governor of an elevator 有权
    安装电梯超速调速器的步骤和装置

    公开(公告)号:US6138797A

    公开(公告)日:2000-10-31

    申请号:US180552

    申请日:1999-01-06

    Abstract: The invention relates to a procedure and an apparatus intended to be used in elevator installation to install the overspeed governor (28) for the time it takes to install the elevator. According to the invention, when the elevator is being installed, at least one suspension element (17) is fastened to the upper part of the elevator shaft (2), an element (30) supporting the overspeed governor (28) is fitted to the suspension element and the position of the overspeed governor (28) at least in the vertical direction is so adjusted that it corresponds to the final placement of the overspeed governor (28). After the elevator guide rails (56) have been installed, the overspeed governor is removed from the suspension element (17) and fixed to a guide rail.

    Abstract translation: PCT No.PCT / FI98 / 00206 Sec。 371日期1999年1月6日 102(e)日期1999年1月6日PCT提交1998年3月6日PCT公布。 WO98 / 40304 PCT出版物 日期1998年9月17日本发明涉及一种在电梯安装中用于在安装电梯所需的时间安装超速调速器(28)的程序和装置。 根据本发明,当电梯正在安装时,至少一个悬挂元件(17)被紧固到电梯井道(2)的上部,支撑超速调速器(28)的元件(30)被安装到 悬架元件和至少在垂直方向上的超速调速器(28)的位置被调整为使其对应于超速调速器(28)的最终位置。 在电梯导轨(56)已经安装之后,超速调速器从悬挂元件(17)移除并固定在导轨上。

    Method and an elevator arrangement
    5.
    发明授权
    Method and an elevator arrangement 有权
    方法和电梯安排

    公开(公告)号:US09388020B2

    公开(公告)日:2016-07-12

    申请号:US14020027

    申请日:2013-09-06

    CPC classification number: B66B19/00 B66B9/187 B66B11/00 B66B19/007 E04H12/34

    Abstract: A method and elevator arrangement wherein a roof structure is lifted higher in a hoistway so as to make more room below the roof structure, the roof structure being a movable roof structure, and in that the movable roof structure is lifted in the hoistway taking support for the lift from a second movable support structure mounted in the hoistway above the roof structure.

    Abstract translation: 一种方法和电梯装置,其中屋顶结构在井道中被提升得更高,以便在屋顶结构下面形成更多的空间,屋顶结构是可动屋顶结构,并且可移动屋顶结构在井道中提升, 来自安装在屋顶结构上方的井道中的第二可移动支撑结构的升降机。

    TRAVELLING CABLE CLAMP ASSEMBLY, AN ELEVATOR ARRANGEMENT, AND A METHOD
    6.
    发明申请
    TRAVELLING CABLE CLAMP ASSEMBLY, AN ELEVATOR ARRANGEMENT, AND A METHOD 有权
    旅行电缆钳组件,电梯装置和方法

    公开(公告)号:US20150307322A1

    公开(公告)日:2015-10-29

    申请号:US14264768

    申请日:2014-04-29

    CPC classification number: B66B7/064 B66B19/00

    Abstract: The present disclosure is related to a travelling cable clamp assembly fixing an elevator travelling cable to a fixing base, such as to a first movable support structure in the hoistway for supporting said at least one elevator unit movable in the hoistway, including at least an elevator car.

    Abstract translation: 本公开涉及将电梯行进电缆固定到固定基座的行进电缆夹具组件,例如在井道中的第一可移动支撑结构,用于支撑在井道中可移动的至少一个电梯单元,至少一个电梯 汽车。

    Method of installing an elevator
    7.
    发明授权
    Method of installing an elevator 有权
    安装电梯的方法

    公开(公告)号:US08881872B2

    公开(公告)日:2014-11-11

    申请号:US12969524

    申请日:2010-12-15

    CPC classification number: B66B19/00 Y10T29/49828 Y10T29/49904 Y10T29/49947

    Abstract: In a method in the use of a construction-time elevator, at least two lifts are performed. In each of the lifts, the supporting platform is lifted higher in the elevator hoistway with the hoisting device supported by the support structure so as to extend the operating range of the elevator car to reach higher in the elevator hoistway. A second support structure and a second hoisting device, which are above the support structure, are used between the lifts of the supporting platform, for moving the working platform in the elevator hoistway under construction between the second support structure and the support structure, and for lifting the support structure upwards in the elevator hoistway.

    Abstract translation: 在使用施工时电梯的方法中,至少执行两个升降机。 在每个升降机中,支撑平台在电梯井道中升高,起重装置由支撑结构支撑,以便延长电梯轿厢的工作范围,使其在电梯井道中达到更高。 第二支撑结构和第二提升装置,其位于支撑结构之上,用于支撑平台的升降机之间,用于在第二支撑结构和支撑结构之间移动在施工中的电梯井道中的工作平台,并且 在电梯井道中向上提升支撑结构。

    Hosting machine supporting frame for jump lifts of elevators
    8.
    发明授权
    Hosting machine supporting frame for jump lifts of elevators 有权
    升降机升降机主机支架

    公开(公告)号:US08636115B2

    公开(公告)日:2014-01-28

    申请号:US13444423

    申请日:2012-04-11

    Abstract: An elevator arrangement includes an elevator hoistway, an elevator car, and a movable supporting platform for supporting the elevator components in the elevator hoistway. The supporting platform includes a supporting frame. The supporting frame includes a plurality of beams that are rigidly fixed to each other. The plurality of beams are arranged such that towards each of all four lateral directions of the supporting platform points at least one beam end of the supporting frame, at which beam end is a movable support element belonging to a plurality of movable support elements movable between a position extended from the platform towards the side and a position retracted towards the platform.

    Abstract translation: 电梯装置包括电梯井道,电梯轿厢和用于支撑电梯井道中的电梯部件的可移动支撑平台。 支撑平台包括支撑框架。 支撑框架包括彼此刚性地固定的多个梁。 多个梁被布置成使得朝向支撑平台的所有四个横向方向中的每一个指向支撑框架的至少一个梁端,梁端处于属于多个可移动支撑元件的可移动支撑元件,该可移动支撑元件可在 位置从平台朝向侧面延伸,并且朝向平台缩回的位置。

    Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine
    9.
    发明授权
    Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine 有权
    在建筑物施工期间安装没有机房的电梯的方法和装置,以及使用曳引机

    公开(公告)号:US08485319B2

    公开(公告)日:2013-07-16

    申请号:US12466821

    申请日:2009-05-15

    CPC classification number: B66B19/00 B66B7/027

    Abstract: The invention relates to a method and an apparatus for installing an elevator with-out machine room during the construction of a building, said elevator comprising at least a hoisting machine (4) provided with a traction sheave (30) and an elevator car (3) suspended by a set of hoisting ropes (28) and fitted to move along guide rails (2), and in which method at least a temporary machine room (6) movable in the elevator shaft (1) is utilized. At the final stage of installation, the machine room (6) of the elevator provided with a temporary machine room (6) is dismounted and the elevator is converted into an elevator without machine room by placing the hoisting machine (4) that was used in the temporary machine room (6), together with the hoisting ropes (28) on the traction sheave (30), into its final position in the elevator shaft (1).

    Abstract translation: 本发明涉及一种在建筑物施工期间安装电梯机房的方法和装置,所述电梯至少包括一个设有牵引绳轮(30)和电梯轿厢(3)的曳引机(4) )由一组提升绳索(28)悬挂并且被安装成沿着导轨(2)移动,并且利用这种方法,至少在电梯井道(1)中可移动的临时机房(6)被利用。 在安装的最后阶段,拆下设有临时机房(6)的电梯的机房(6),并将升降机转换成没有机房的电梯,放置使用的曳引机(4) 临时机房(6)与牵引滑轮(30)上的提升绳索(28)一起进入电梯井(1)的最终位置。

    ELEVATOR ARRANGEMENT AND METHOD
    10.
    发明申请
    ELEVATOR ARRANGEMENT AND METHOD 有权
    电梯布置和方法

    公开(公告)号:US20120217101A1

    公开(公告)日:2012-08-30

    申请号:US13444423

    申请日:2012-04-11

    Abstract: An elevator arrangement includes an elevator hoistway, an elevator car, and a movable supporting platform for supporting the elevator components in the elevator hoistway. The supporting platform includes a supporting frame. The supporting frame includes a plurality of beams that are rigidly fixed to each other. The plurality of beams are arranged such that towards each of all four lateral directions of the supporting platform points at least one beam end of the supporting frame, at which beam end is a movable support element belonging to a plurality of movable support elements movable between a position extended from the platform towards the side and a position retracted towards the platform.

    Abstract translation: 电梯装置包括电梯井道,电梯轿厢和用于支撑电梯井道中的电梯部件的可移动支撑平台。 支撑平台包括支撑框架。 支撑框架包括彼此刚性地固定的多个梁。 多个梁被布置成使得朝向支撑平台的所有四个横向方向中的每一个指向支撑框架的至少一个梁端,梁端处于属于多个可移动支撑元件的可移动支撑元件,该可移动支撑元件可在 位置从平台朝向侧面延伸,并且朝向平台缩回的位置。

Patent Agency Ranking