公开(公告)号:US20200224435A1
公开(公告)日:2020-07-16
申请号:US16741442
申请日:2020-01-13
申请人: Paul Kristen, Inc.
IPC分类号: E04G5/06 , E04C3/00 , E04G3/22 , E04G5/16 , E04G1/15 , E01D22/00 , E04C3/04 , E04C3/08 , E04G3/00 , E04G11/38 , E04G11/50
摘要: An erected platform which contains parallel lines of trusses connected end-to-end and method of erecting thereof, as illustrated in FIGS. 20 to 23. Each truss has two sides for chords respectively, with apertures or eyelets at the ends. First and second other trusses for a pair of parallel lines respectively are connected by positioning a first other truss adjacent the decking laid on an existing platform portion. Apertures on first respective sides of the first other truss and one of the existing trusses are connected by a first pin and the first other truss swung into an end-to-end position with the one existing truss and a second pin inserted in apertures on second respective sides of the first other truss and the one existing truss. The first pin is removed and the first other truss swung out of the way so that the second other truss may be attached. The second other truss is positioned adjacent the existing decking and similarly connected end-to-end with the other existing truss. The first other truss is then swung back into position for end-to-end attachment to the one existing truss and the second pin re-inserted.
-
公开(公告)号:US10662594B1
公开(公告)日:2020-05-26
申请号:US15717348
申请日:2017-09-27
申请人: Brian J. Lafoy
发明人: Brian J. Lafoy
摘要: A bridge support system includes a telescoping arm extending from a first end to a second end, the telescoping arm having a first arm section; a second arm section, the second arm section is configured to slidingly engage with the first arm section; a locking pin to secure the second arm section in a fixed position; a lower bearing assembly pivotally attached to the first end of the telescoping arm, the lower bearing assembly having a bearing plate pivotally attached to the first end of the telescoping arm via a pivot pin, the bearing plate is configured to engage with a ground surface; an upper bearing assembly pivotally attached to a jacking beam support, the upper bearing assembly having a plurality of holes for selective adjustment of the upper bearing assembly relative to the jacking beam support; and a jacking beam secured to the jacking beam support and secured to a bridge member.
-
公开(公告)号:US10533328B2
公开(公告)日:2020-01-14
申请号:US15845903
申请日:2017-12-18
申请人: Paul Kristen, Inc.
IPC分类号: E04G5/06 , E04C3/00 , E04G3/22 , E04G5/16 , E04G1/15 , E01D22/00 , E04C3/04 , E04C3/08 , E04G3/00 , E04G11/38 , E04G11/50 , E01D19/10 , E04G1/34 , E04G3/30
摘要: A foldable quad-chord truss which can be connected end-to-end with like trusses. Each pair of chords are rigidly attached, and connector members intermediate the ends are swivelly attached to the chord pairs to effect the folding into a compact shape for transport and storage. The connector members are adapted for attachment to connector members of beams which may extend perpendicular to a parallel pair of the trusses and attached thereto. The laid trusses and beams is overlaid with sheets of corrugated sheet metal which overlap each other along their adjacent edges. While standing on a sheet of laid sheet metal adjacent ends of an already laid pair of trusses, another truss can be held adjacent the edge of the sheet metal for attaching an end of the other truss along only one side so that it can then be swung outwardly into a position wherein the other end of the other truss can also be attached to rigidly connect the trusses end-to-end.
-
公开(公告)号:US10472787B1
公开(公告)日:2019-11-12
申请号:US15984190
申请日:2018-05-18
摘要: In certain embodiments, a cap repair assembly includes first and second pile brackets for rigid mounting onto first and second piles of a pier; a cap beam for rigid mounting onto super-structure of the pier; first and second cap beam plates for rigid mounting onto the cap beam at different ends of the cap beam; first and second compression arms rotatably connected (i) at first ends to the first and second pile brackets and (ii) at second ends to the first and second cap beam plates. The cap repair assembly restores the load capacity of damaged or degraded piers. The cap repair assembly can further include one or more steel banding straps.
-
公开(公告)号:US10465396B2
公开(公告)日:2019-11-05
申请号:US15871692
申请日:2018-01-15
申请人: Paul Kristen, Inc.
IPC分类号: E04C3/08 , E04G5/06 , E01D22/00 , E04G11/50 , E01D19/10 , E04G1/15 , E04G3/22 , E04G5/16 , E04G7/26 , E04G7/30 , E04G7/34 , E04G5/14 , E04B5/10 , E04B5/14 , E04C3/04 , E04G3/30
摘要: A platform and a kit therefor. The platform and the kit comprises quad-chord trusses attachable end-to-end and having connector members intermediate thereof, and further comprising beams attachable at their ends to the connector members so that a beam attaches two parallel trusses. A truss comprises first and second pairs of chords which are foldable for storage and transport and unfoldable to use for erection of the platform. A track lies between the upper chords to allow movement of bolts along the track into position to attach for insertion into decking apertures for attachment of the decking. The kit also includes a sturdy and reliable and easy to use tie-up mechanism and railing along the platform perimeter which is quickly and easily attachable and reliable.
-
公开(公告)号:US20190301105A1
公开(公告)日:2019-10-03
申请号:US16442320
申请日:2019-06-14
申请人: William B. Coe
发明人: William B. Coe
IPC分类号: E01C11/00 , E01C23/14 , E01C19/48 , E04B1/66 , C09J119/00 , C09D119/00 , E01D22/00 , E01D19/08 , E01C7/26 , E01C7/18 , E01C23/06 , E01C23/03 , C08L95/00 , E01C7/35 , C09J195/00 , E01C19/15 , E02D31/06 , B32B5/02 , B32B7/12 , B32B18/00
摘要: A pavement repair system is provided utilizing solid phase auto regenerative cohesion and homogenization by liquid asphalt oligopolymerization technologies. The system is suitable for use in repairing asphalt pavement, including pavement exhibiting a high degree of deterioration (as manifested in the presence of potholes, cracks, ruts, or the like) as well as pavement that has been subject to previous repair and may comprise a substantial amount of dirt and other debris (e.g., chipped road paint or other damaged or disturbed surfacing materials). A system utilizing homogenization by liquid asphalt oligopolymerization is suitable for rejuvenating or repairing aged asphalt, thereby improving properties of the paving material.
-
17.
公开(公告)号:US10378208B2
公开(公告)日:2019-08-13
申请号:US15769771
申请日:2017-03-30
申请人: SOUTHEAST UNIVERSITY
发明人: Zeyang Sun , Gang Wu
IPC分类号: E04C3/36 , E01D19/02 , E01D22/00 , E04G23/02 , E04C3/34 , E04B1/30 , E04C5/04 , E04C5/06 , E04C5/01 , E04H9/02
摘要: A steel-fiber reinforced polymer (FRP) composite material reinforced concrete column comprises an inner steel pipe arranged in the center, wherein the inner steel pipe is internally provided with an unbonded steel strand; the outside of the inner steel pipe is provided with an outer steel pipe, concrete is poured between the inner steel pipe and the outer steel pipe, a plurality of additional small steel pipes are evenly arranged outside the outer steel pipe, and each of the additional small steel pipes is internally provided with an additional unbonded steel strand. A composite bar cage coaxial with the outer steel pipe and arranged on the outside thereof is also provided, wherein both the outer steel pipe and the composite bar cage are covered by high-ductility concrete, and at a core area, the outside of the high-ductility concrete is wrapped with an anti-spalling layer.
-
18.
公开(公告)号:US20190161925A1
公开(公告)日:2019-05-30
申请号:US16096240
申请日:2016-05-10
摘要: A reinforcement apparatus for reinforcing a structure comprising at least one pier bearing on foundations, a cross-beam bearing on said pier and at least one structure element located above the cross-beam, the reinforcement apparatus comprising at least one column (20) destined to surround the pier at least partly, to be mechanically coupled to the pier and to bear on said foundations, and at least one transverse beam (22) fixed relative to the column and destined to be mechanically coupled to the cross-beam, and at least one load transfer element (36) arranged on an upper face of said at least one transverse beam (22) to take up at least part of the load of the structure element.
-
公开(公告)号:US10227786B2
公开(公告)日:2019-03-12
申请号:US15291903
申请日:2016-10-12
摘要: An elongate member reinforcement system and associated methods are disclosed. The system can include an elongate member, a collar secured about an end portion of the elongate member, a support layer surrounding the end portion of the elongate member, and a structural filler disposed between the support layer and the end portion of the elongate member. The collar can be disposed in the structural filler and can include a structural filler interface feature that mechanically couples the collar to the structural filler to facilitate transferring loads between the elongate member and the structural filler.
-
20.
公开(公告)号:US10030146B2
公开(公告)日:2018-07-24
申请号:US14780340
申请日:2014-05-23
发明人: Dongwei Cao , Yanjun Zhang , Shifeng Wang
IPC分类号: C08L95/00 , C08L63/00 , C08L75/00 , C08L75/04 , C08K3/26 , C08K3/34 , C08K5/101 , C08K5/20 , C08K5/315 , C08K5/3445 , C08K5/3492 , C08L67/00 , E01C7/30 , E01C23/00 , E01D22/00 , C08G59/50
摘要: A thermoset modified additive for asphalt mixture includes the following raw materials: resin, curing agent, promoter, flow agent, filler and additive, wherein the weight part proportions of the raw materials are: resin 35-70, curing agent 1-35, promoter 0-2.5, flow agent 0-6, filler 20-40 and additive 0-2. The asphalt mixture includes thermoset modified additive for asphalt mixture, matrix asphalt or modified asphalt and mineral aggregate, wherein the weight part proportions of the raw materials are: thermoset modified additive for asphalt mixture 1-5, matrix asphalt 2-8 and mineral aggregate 87-97. The thermoset modified additive for asphalt mixture is prepared by dry process modification technology; the prepared modified additive is powdery, has small particle size, and is easy to disperse in asphalt mixture; and the asphalt mixture prepared from the modified additive has simple operation process and low cost, and can be subjected to continuous production.
-
-
-
-
-
-
-
-
-