Abstract:
A load control system may include one or more wireless control devices that may be associated via a programming device. An identifier for a first wireless control device may be determined in response to an actuation of a button on the first wireless control device. An association between the first wireless control device and a second wireless control device may be defined at the programming device. The identifier for the first wireless control device may be transmitted to the second wireless control device, which may cause the first wireless control device to enter a sleep mode. The first wireless control device may enter the sleep mode after an actuation of a button on the first wireless control device. The identifier may be determined in response to the actuation of the button on the first wireless control device and/or prior to the first wireless control device entering the sleep mode.
Abstract:
A wireless load control system for controlling one or more electrical loads comprises a wireless control device (e.g., a gateway device) able to obtain a present time from a server via a network (e.g., the Internet), control the electrical loads according to a timeclock schedule, and disable the timeclock schedule if the present time is not able to be obtained from the server via the network. The wireless control device may also be able to obtain the present time from a digital message received from an external device (e.g., a smart phone or a tablet device) via the network. The wireless control device may be configured to receive a control signal indicating a power outage (e.g., from a battery backup device), and to operate in a low-power mode in response to receiving the control signal indicating the power outage.
Abstract:
One or more load control devices and/or user interfaces that are part of a first network operating via a first protocol may communicate and/or control one or more load control devices and/or user interfaces that are part of a second network operating via a second protocol. For example, a wireless bridge may be provided. The wireless bridge may include a gateway. The gateway may be used to bridge the two networks that communicate using the different protocols such that the devices of the different networks may communicate with each other.
Abstract:
A load control system may include one or more wireless control devices that may be associated via a programming device. An identifier for a first wireless control device may be determined in response to an actuation of a button on the first wireless control device. An association between the first wireless control device and a second wireless control device may be defined at the programming device. The identifier for the first wireless control device may be transmitted to the second wireless control device, which may cause the first wireless control device to enter a sleep mode. The first wireless control device may enter the sleep mode after an actuation of a button on the first wireless control device. The identifier may be determined in response to the actuation of the button on the first wireless control device and/or prior to the first wireless control device entering the sleep mode.
Abstract:
A load control system may include one or more wireless control devices that may be associated via a programming device. An identifier for a first wireless control device may be determined in response to an actuation of a button on the first wireless control device. An association between the first wireless control device and a second wireless control device may be defined at the programming device. The identifier for the first wireless control device may be transmitted to the second wireless control device, which may cause the first wireless control device to enter a sleep mode. The first wireless control device may enter the sleep mode after an actuation of a button on the first wireless control device. The identifier may be determined in response to the actuation of the button on the first wireless control device and/or prior to the first wireless control device entering the sleep mode.
Abstract:
A load control system may include one or more wireless control devices that may be associated via a programming device. An identifier for a first wireless control device may be determined in response to an actuation of a button on the first wireless control device. An association between the first wireless control device and a second wireless control device may be defined at the programming device. The identifier for the first wireless control device may be transmitted to the second wireless control device, which may cause the first wireless control device to enter a sleep mode. The first wireless control device may enter the sleep mode after an actuation of a button on the first wireless control device. The identifier may be determined in response to the actuation of the button on the first wireless control device and/or prior to the first wireless control device entering the sleep mode.
Abstract:
A wireless load control system for controlling one or more electrical loads comprises a wireless control device (e.g., a gateway device) able to obtain a present time from a server via a network (e.g., the Internet), control the electrical loads according to a timeclock schedule, and disable the timeclock schedule if the present time is not able to be obtained from the server via the network. The wireless control device may also be able to obtain the present time from a digital message received from an external device (e.g., a smart phone or a tablet device) via the network. The wireless control device may be configured to receive a control signal indicating a power outage (e.g., from a battery backup device), and to operate in a low-power mode in response to receiving the control signal indicating the power outage.
Abstract:
A load control system may control an electrical load in a space of a building occupied by an occupant. The load control system may include a controller configured to determine the location of the occupant, and a load control device configured to automatically control the electrical load in response to the location of the occupant. The load control system may also include a mobile device adapted to be located on or immediately adjacent the occupant and configured to transmit and receive wireless signals. The load control device may be configured to automatically control the electrical load when the mobile device is located in the space. The load control system may further comprise an occupancy sensor and the load control device may automatically control the electrical load when the occupancy sensor indicates that the space is occupied and the mobile device is located in the space.