摘要:
A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.
摘要:
In an apparatus for generating and managing production processing structure in a production management system of a factory, the structure of factory made up of the names or other identifiers of process points obtained by subdividing the factory production line is hierarchically registered in the storage device of the management computer (server; S200), the terminal computers and devices used in production are registered as terminal devices (S202), and tasks (from among tasks generated in advance and stored in the disk of the management computer) for achieving the operation or processing to be implemented at the process points are selected for each process point and registered in the order of execution (S204), while linking the terminal devices with definition information that correlates them, once the terminal computers are activated, the registered tasks are executed by the management computer (server) based on the definition information thus registered, so that the production record information is accumulated, production instructions are distributed to the devices based on the accumulated production record information, such that the product is produced. With this, the number of man-hours and the costs of developing the production management system in building a factory can be significantly reduced, and the turnaround time can be shortened.
摘要翻译:在工厂的生产管理系统中生产和管理生产处理结构的装置中,通过将工厂生产线进行细分而获得的工艺点的名称或其他标识符构成的工厂结构被分级地登记在工厂生产线的存储装置中 管理计算机(服务器; S 200),生产中使用的终端计算机和设备被注册为终端设备(S 202),以及用于实现操作的任务(从事先生成并存储在管理计算机的盘中的任务中) 或者按照执行顺序选择要在处理点执行的处理,并按照执行顺序进行注册(S 204),一旦终端计算机被激活,终端设备与定义信息相关联,注册的任务是 由管理计算机(服务器)根据这样注册的定义信息执行,使得生产r 积累电子信息,根据积累的生产记录信息将生产指示分发给设备,使产品生产。 这样可以大幅度减少工时数量和开发生产管理系统的成本,缩短周转时间。
摘要:
A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.
摘要:
Here is disclosed a system and a method for production management. In response to a job order created by a job order creating system, which indicates option to be applied to parts and processes associated with a standard specification product, a structure information creating processor creates, with reference to a structure modification master recording option applicable to the parts, a second structure master by applying the parts of an option specification product to a first structure master while a process information creating processor creates, with reference to a process modification master recording the option applicable to the process, a second process evolution master by applying processes for the option specification product to a first process evolution master. Then a capacity production seat reservation processor applies the parts of the option specification product and processes for the option specification product to a production planning for the standard specification product in order to create a production planning for the option specification product and stores the production planning for the option specification product created in this manner.
摘要:
A dispatch system and a dispatch method for manufacturing mold are provided. The dispatch system includes a control unit, a mold material storage unit, a processing cutter storage unit, an object pick-and-place and transfer unit, a mold processing unit and a mold product storage unit. The mold material storage unit includes many unprocessed mold materials. The processing cutter storage unit includes many processing cutters. The object pick-and-place and transfer unit is electrically connected to the control unit and disposed between the mold material storage unit and the processing cutter storage unit. One of the unprocessed mold materials and one of the processing cutters are transferred to the mold processing unit by the object pick-and-place and transfer unit, the unprocessed mold material is processed to form a mold product by the mold processing unit, and the mold product is transferred to the mold product storage unit.
摘要:
The production of semiconductor devices manufactured through a plurality of manufacturing sites is unitarily managed and an appropriate production plan is instructed. A computer projects a production plan of an entire company based on various information. The production plan is provided to each manufacturing site as a production instruction and provided to each business person or customer as a storing reply or an order accepting period reply. If the projected production plan (possible production volume) does not coincide with a production plan (necessary production volume), parameters obtained by correcting production allocation, production capability, lead time, yield and the like are re-input from a parameter input terminal. Based on the corrected parameters, the computer re-projects the production plan and projects an optimum production plan.
摘要:
An industrial control system uses a number of autonomous control units, each associated with one piece of equipment in an industrial process. The autonomous control units negotiate by bidding among themselves to determine a common set of input and output values for the interconnected machines with which they are associated. Each autonomous control unit determines whether input values are acceptable by using a model of its associated equipment. The model provides anticipated output values which may be compared against a predetermined range of outputs of associated machines, outputs compatible with downstream machines, or the constraints of the overall industrial process according to a designated job to be accomplished. Optimization of the input and output values is provided by allowing preliminary bids to be the subject of optimizing counter-bids if the original bid value could have been accepted.
摘要:
The invention comprises in various embodiments controllers and apparatus for testing flexible manufacturing systems and methods of operating same. The controller includes a computer, a program, output lines from the computer, and devices connected to the output lines. The program uses matrix logic equations to determine when to start and stop jobs. The devices start and stop individual resources in response to logic signals from the computer. In one embodiment, the controller obtains sensor feedback on the distribution of work pieces and available resources in the manufacturing system. The invention also includes an apparatus and methods for testing a flexible manufacturing system. In response to the input of initial data, the apparatus for testing a flexible manufacturing system solves matrix equations and determines the activity and/or production of the manufacturing system. The apparatus for testing a flexible manufacturing system sends logical signals to a recording device which, in one embodiment, produce a cumulative display of the time dependent production or activity of the system.
摘要:
In a material cutting optimization method, a material cutting plate and a shape to be cut out are received. Then, a point cloud is generated according to the shape, and a maximal surrounding box of the material cutting plate is calculated. After that, a triangular mesh surface of the point cloud is constructed and a total area of triangles in the triangular mesh surface is computed. A maximum number of the shapes that can be contained in the material cutting plate is calculated and the shapes are arranged in the material cutting plate according to the total area of the triangles, using an iteration function.
摘要:
A system and method thereof for experiment management. A storage device stores an experiment plan record, a merge constraint and an integration rule. A processing unit configured to acquire a first experiment plan from the experiment plan record, and a second experiment plan. The processing unit generates an integrated experiment plan by merging the first experiment plan and the second experiment plan according to the merge constraint and the integration rule, and stores the integrated experiment plan to the storage device.