JOINING DEVICE OF A CONTINUOUS CONDUIT FOR CHANGES IN SLOPE OF SEABEDS, CONTINUOUS CONDUIT COMPRISING A DEVICE AND METHOD FOR JOINING A CONTINUOUS CONDUIT

    公开(公告)号:US20180216752A1

    公开(公告)日:2018-08-02

    申请号:US15746353

    申请日:2016-07-14

    申请人: SAIPEM S.P.A.

    IPC分类号: F16L1/12 F16L1/19 F16L1/26

    摘要: A joining device of a continuous conduit is for changes in slope of seabeds. The continuous conduit defines a longitudinal direction substantially coinciding with the longitudinal direction of structural development of the continuous conduit. The continuous conduit has a longitudinal structural continuity and a fluidic continuity. The joining device includes a joint that includes at least one first joining branch, at least one second joining branch and at least one third joining branch. The first joining branch extends along the longitudinal direction and provides longitudinal structural and fluidic continuity of the continuous conduit and connects with a piece of the continuous conduit. The second joining branch provides longitudinal structural continuity of the continuous conduit. The third joining branch provides fluidic continuity of the continuous conduit. The second joining branch is exclusively suitable for providing the longitudinal structural continuity of the continuous conduit, and is unsuitable for providing the fluidic continuity.

    Marine pipeline installation system and method

    公开(公告)号:US09835268B2

    公开(公告)日:2017-12-05

    申请号:US14990240

    申请日:2016-01-07

    申请人: ITREC B.V.

    摘要: A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser includes a pipeline launch tower, a pipeline guide provided at an elevated position for guiding said pipeline to the pipeline launch trajectory along said tower, one or more tensioners, an abandonment and recovery (A&R) system including at least one A&R cable and associated A&R winch and a sheave arrangement with one or more sheaves supported by the pipeline launch tower at an upper position thereof. An auxiliary trolley is provided which is adapted to support the weight of the launched pipeline and which is movable along a rail in the pipeline launch trajectory when the one or more tensioner frames are in the retracted non-operable position, from a position above the uppermost tensioner to a position below the lowermost tensioner, the rail being supported by the pipeline launch tower.

    OFFSHORE HORIZONTAL PRODUCT LAY ARRANGEMENT

    公开(公告)号:US20170284564A1

    公开(公告)日:2017-10-05

    申请号:US15625333

    申请日:2017-06-16

    发明人: David Lee GUYMON

    IPC分类号: F16L1/20 F16L1/19

    CPC分类号: F16L1/205 F16L1/19

    摘要: An arrangement that brings all of the separate elements of equipment used to lay product offshore such as pipe, umbilicals, and power cables and assembles them into a single device that can be installed on a vessel of opportunity, and includes functional improvements of each. A base is used for mounting, integration, and installation of the separate elements onto a vessel. The base receives a movable lay chute, means for moving and stabilizing the lay chute, a movable hang off clamp and work table, a movable access platform, a product support arm and wheel, and a fixed chute.

    Repairing a wet buckle in a pipeline
    8.
    发明授权
    Repairing a wet buckle in a pipeline 有权
    修理管道中的湿扣

    公开(公告)号:US09562625B2

    公开(公告)日:2017-02-07

    申请号:US14641664

    申请日:2015-03-09

    发明人: Peter Fretwell

    摘要: A method of repairing a length of pipeline which has experienced a wet buckle during deployment is disclosed. The method includes: severing the pipeline at locations which are spaced apart on opposite sides of a buckle and removing the buckled section to leave spaced severed ends; locating a pipeline pig in a pig deployment device; releasably coupling a pig insertion member of the pig deployment device to the pig; releasably coupling the pig deployment device to one of the severed ends; operating the pig deployment device to cause the pig insertion member to translate the pig out of the deployment device and into the pipeline through said severed end; releasing the pig insertion member from the pig and retracting the pig insertion member, leaving the pig in place within the pipeline; releasing the pig deployment device from said severed end; and welding the severed ends together.

    摘要翻译: 公开了在部署期间经历了湿扣的管道长度的修复方法。 该方法包括:在带扣的相对侧上间隔开的位置处切断管道,并移除带扣部分以留下间隔开的端部; 将管道猪定位在猪部署装置中; 将猪展开装置的猪插入件可释放地连接到猪上; 将猪展开装置可释放地连接到切断的端部之一; 操作所述猪部署装置,以使所述猪插入部件通过所述切断端将所述排放出所述展开装置并进入所述管道; 从猪释放猪插入构件并收回猪插入构件,使猪在管道内就位; 从所述切断端释放猪部署装置; 并将切断的端部焊接在一起。

    Method of forming a collar on a tubular component through depositing of weld metal and machining this deposit into a collar
    9.
    发明授权
    Method of forming a collar on a tubular component through depositing of weld metal and machining this deposit into a collar 有权
    通过沉积焊接金属并将该沉积物加工成套环在管状部件上形成套环的方法

    公开(公告)号:US09512938B2

    公开(公告)日:2016-12-06

    申请号:US14519372

    申请日:2014-10-21

    发明人: Graham Hutt

    IPC分类号: F16L1/19 B23K9/04 F16L1/20

    CPC分类号: F16L1/19 B23K9/048 F16L1/207

    摘要: A method of laying a pipeline comprising a plurality of tubular components is disclosed. The method includes depositing a weld material onto a surface of a first tubular component of the plurality of tubular components and machining a profile into the weld material. The profile includes a support shoulder into the weld material. The method further includes suspending the first tubular component in a vertical or near vertical position and supporting the first tubular component by the support shoulder. A further tubular component of the plurality of tubular components is connected to a free end of the first tubular component. The support shoulder is formed at a point spaced from the free end of the first tubular component thereby facilitating connection of the first tubular component to the second tubular component.