-
公开(公告)号:US20220259012A1
公开(公告)日:2022-08-18
申请号:US17739513
申请日:2022-05-09
Applicant: Kone Corporation
Inventor: Anssi VENHO , Janne MIKKONEN , Markku HAAPANIEMI , Matti RASANEN , Otto LANZ , Janne LAINE
Abstract: The invention relates to an elevator arrangement, comprising a hoistway one or more vertically oriented guide rail lines in the hoistway for guiding vertical movement of one or more movable elevator units, and one or more movable elevator units mounted in the hoistway vertically movably along one or more guide rail lines, including at least an elevator car, preferably also a counterweight, and a hoisting roping; a movable support structure mounted in the hoistway for supporting said one or more movable elevator units below it via said hoisting roping, and a hoisting machine on the movable support structure for moving the hoisting roping, for thereby moving said one or more movable elevator units. Said movable support structure comprises a body portion, and a shelf structure projecting laterally from the body portion, and the hoisting machine is mounted on the shelf structure. The invention also relates to a method for constructing an elevator implementing the arrangement.
-
公开(公告)号:US20240417220A1
公开(公告)日:2024-12-19
申请号:US18817026
申请日:2024-08-27
Applicant: Kone Corporation
Inventor: Mika IJÄS , Matti RÄSÄNEN , Mikko KUKKOLA , Markku HAAPANIEMI , Janne LAINE , Otto LANZ
Abstract: An elevator construction arrangement comprises: a first hoistway in a building, a first elevator car, a first counterweight, car guide rails for guiding the first car, and counterweight guide rails for guiding the first counterweight, a first elevator hoisting machine and a first suspension roping arranged to suspend the first elevator car and the first counterweight during construction time use, a protection deck mounted within the first hoistway during a first elevator installation in a bottom section of the first hoistway, a hoist device for hoisting a working platform, the hoist device preferably comprises a man riding hoist attachable to the first car or to an installation platform, and a hoist rope attachable to the first car or the installation platform and movable with the hoist device, and a first hoisting point configured to support the working platform via the hoist device and the hoist rope. During a first elevator installation in the bottom section of the first hoistway the first hoisting point is configured to be mounted to the protection deck and the working platform guided on the car guide rails is configured to be used as an installation platform in the bottom section of the first hoistway, and after the first elevator installation, the first car is in construction time use configured to be moved in the bottom section of the first hoistway by the first elevator hoisting machine which is installed at a top of the bottom section of the first hoistway and supported by the car guide rail, the first elevator hoisting machine suspending the first car and the first counterweight together with the first suspension roping, while the first hoisting point and the hoist device are removed from the first hoistway. A method for installing an elevator during construction of a building.
-
公开(公告)号:US20220194744A1
公开(公告)日:2022-06-23
申请号:US17692549
申请日:2022-03-11
Applicant: Kone Corporation
Inventor: Otto LANZ , Matti RASANEN , Markku HAAPANIEMI , Jukka TURPEINEN , Anssi VENHO , Janne LAINE , Janne MIKKONEN , Aki HAIKONEN , Jari OSTERMAN , Jori HAGG , Jorma MUSTALAHTI , Petri KERE
Abstract: The arrangement comprises a self-climbing installation platform comprising two consecutive decks, a machine room deck suspended from the installation platform and an elevator car suspended from the machine room deck. Each deck, the machine room deck and the car are supported movably with guide means on guide rails and locked and unlocked with locking means to the guide rails and/or to guide rail fixing means. Lifting means powered by a power source move the two decks in relation to each other. The installation platform climbs stepwise along the guide rails by alternatingly locking and unlocking the lower deck and the upper deck to the guide rails and/or to the guide rail fixing means and thereafter raising the unlocked deck.
-
公开(公告)号:US20210245998A1
公开(公告)日:2021-08-12
申请号:US17147616
申请日:2021-01-13
Applicant: Kone Corporation
Inventor: Otto LANZ , Matti RASANEN , Anssi VENHO , Markku HAAPANIEMI , Janne MIKKONEN , Janne LAINE , Tarvo VIITA-AHO , Markku HAIVALA , Jukka LAITINEN , Hans VALTONEN , Aki HAIKONEN , Jorma MUSTALAHTI , Jori HAGG , Jari OSTERMAN , Petri KERE
Abstract: The invention relates to a method for constructing an elevator comprising constructing a movable machine room in the bottom end of a hoistway formed in a building under construction; and thereafter hoisting the movable machine room; and constructing an elevator car in the bottom end of the hoistway below the movable machine room; and providing a counterweight in the bottom end of the hoistway below the movable machine room; connecting the elevator car and the counterweight with a suspension roping; and thereafter hoisting the movable machine room to a first transport position; and thereafter mounting the movable machine room to the first transport position in the hoistway vertically supported on stationary structures; and thereafter using the elevator car for transporting passengers and/or goods below the movable machine room while the machine room is mounted in said first transport position and the elevator car and the counterweight hang suspended from the machine room by the hoisting roping; and thereafter hoisting the movable machine room upwards to a second transport position; wherein the second transport position is higher than said first transport position; and thereafter mounting the movable machine room to the second transport position in the hoistway vertically supported on stationary structures; and thereafter using the elevator car for transporting passengers and/or goods below the movable machine room while the movable machine room is mounted in said second position.
-
公开(公告)号:US20240294361A1
公开(公告)日:2024-09-05
申请号:US18663483
申请日:2024-05-14
Applicant: Kone Corporation
Inventor: Mikko KUKKOLA , Mika IJÄS , Matti RÄSÄNEN , Markku HAAPANIEMI , Otto LANZ , Janne LAINE
CPC classification number: B66B11/0045 , B66B7/02
Abstract: A construction arrangement of an elevator and a method for constructing an elevator. The construction arrangement of an elevator comprises a hoistway; at least one car guide rail and at least one counterweight guide rail mounted to the structure of the hoistway; an elevator car arranged movable on said at least one car guide rail; a counterweight arranged movable on said at least one counterweight guide rail; and a hoisting machine arranged above the counterweight; wherein the hoisting machine is mounted substantially between said at least one car guide rail and said at least one counterweight guide rail. The method for constructing an elevator comprising providing said construction arrangement, moving the hoisting machine from a first installation position to an upper second installation position in the hoistway, and mounting the hoisting machine substantially between said at least one car guide rail and said at least one counterweight guide rail.
-
公开(公告)号:US20240190682A1
公开(公告)日:2024-06-13
申请号:US18581193
申请日:2024-02-19
Applicant: Kone Corporation
Inventor: Matti RASANEN , Markku HAAPANIEMI , Aki HAIKONEN , Otto LANZ , Janne LAINE , Sakari KORVENRANTA , Jaakko KAHILA
CPC classification number: B66B7/024 , B66B19/002 , B66B19/005 , B66B19/04 , B66B19/06
Abstract: The invention relates to an elevator arrangement comprising an elevator shaft wall; and a guide rail line extending vertically at a distance from the shaft wall, the guide rail line being fixed to said wall with plurality of fixing brackets; and an elevator car vertically movable along at least said guide rail line; and a hoisting machine mounted at a first vertical level between the shaft wall and the guide rail line; and a hoisting roping movable with said hoisting machine, and connected to the elevator car; wherein the guide rail line extends in vertical direction past the hoisting machine the upper end of the guide rail line being higher than said hoisting machine, and said plurality of fixing brackets comprises one or more first fixing brackets higher than said hoisting machine, by which one or more first fixing brackets the portion of the guide rail line which portion is higher than said hoisting machine is fixed to the shaft wall; and wherein the hoisting machine comprising a motor and a rotatable drive wheel. The elevator arrangement comprises an elongated hoisting passage extending vertically between the shaft wall and the guide rail line inside which hoisting passage the hoisting machine fits to be hoisted, each said first fixing bracket being shaped to circumvent the hoisting passage. The invention also relates to a method of constructing an elevator.
-
公开(公告)号:US20240400350A1
公开(公告)日:2024-12-05
申请号:US18806894
申请日:2024-08-16
Applicant: Kone Corporation
Inventor: Mika IJÄS , Matti RÄSÄNEN , Mikko KUKKOLA , Markku HAAPANIEMI , Janne LAINE , Otto LANZ
Abstract: An elevator construction arrangement comprises: a hoistway having a bottom section, a top section and optionally at least one intermediate section between the bottom and top sections in a building, an elevator car, a counterweight, car guide rails for guiding the car, counterweight guide rails for guiding the counterweight, an elevator hoisting machine and a suspension roping arranged to suspend the car and the counterweight during construction time use of the elevator, at least one protection deck mounted within the hoistway during elevator installation in a section of the hoistway, an installation platform configured to be guided on car guide rails during installation of at least one hoistway section, a hoist device configured to hoist a working platform in the bottom section and configured to hoist the working platform in hoistway sections above the bottom section, the hoist device preferably comprises a man riding hoist attachable to the car or the installation platform, and a hoist rope attachable to the car or the installation platform and movable with the hoist device during the elevator installation, a hoisting point configured to support the working platform via the hoist device and the hoist rope. During the elevator installation in the bottom section the hoisting point is configured to be mounted to a first protection deck, and the working platform guided on the car guide rails is configured to be used as an installation platform, and after each section elevator installation, the car is during construction time use configured to be moved by the elevator hoisting machine suspending the car and the counterweight together with the suspension roping, and during construction time use of the car, the installation platform is configured to be used as installation platform for an above section installation. A method for installing an elevator during construction of a building.
-
公开(公告)号:US20230416055A1
公开(公告)日:2023-12-28
申请号:US18464534
申请日:2023-09-11
Applicant: Kone Corporation
Inventor: Matti RASANEN , Markku HAAPANIEMI , Otto LANZ , Janne LAINE , Aki HAIKONEN , Jorma MUSTALAHTI , Sakari KORVENRANTA
Abstract: The invention relates to a method of constructing an elevator comprising providing an elevator car in a hoistway, said elevator car comprising a cabin frame, and a temporary pulley beam detachably mounted on the cabin frame; mounting a hoisting machine in a first position which first position is at a first vertical level in the hoistway; suspending (first suspending) the elevator car with a hoisting roping from the hoisting machine via said temporary pulley beam; moving the elevator car in the hoistway with the hoisting machine while it is in said first position and suspended by the roping via said temporary pulley beam; mounting a hoisting machine in a second position which second position is at a second higher vertical level inside a machine room located above the hoistway; removing the temporary pulley beam from the elevator car, comprising detaching the temporary pulley beam from the cabin frame; suspending the car with a hoisting roping from the hoisting machine mounted in said second position via said cabin frame without said temporary pulley beam; moving the elevator car in the hoistway with the hoisting machine while it is in said second position and the car is suspended via said cabin frame without said temporary pulley beam. The invention also relates to an elevator arrangement for implementing the method.
-
公开(公告)号:US20230322522A1
公开(公告)日:2023-10-12
申请号:US18329983
申请日:2023-06-06
Applicant: Kone Corporation
Inventor: Markku HAAPANIEMI , Matti RASANEN , Jari RYHANEN , Jaakko KAHILA , Jorma MUSTALAHTI , Otto LANZ , Janne LAINE , Aki HAIKONEN , Anssi VENHO , Mikko KUKKOLA , Wen Sheng LUO , XueSong PAN , Kai GUO
IPC: B66B11/00
CPC classification number: B66B11/0045
Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway formed in a building, the hoistway comprising at least one hoistway opening leading in horizontal direction out from the hoistway, the opening being delimited by a lower edge structure and an upper edge structure; and a load in the hoistway lower than said opening; and a hoisting arrangement for hoisting said load, wherein said hoisting arrangement comprises a support structure mounted higher than said load; and a hoisting device; and at least one flexible tension member connected or at least connectable to said load; wherein the at least one flexible tension member is movable with said hoisting device in particular for thereby transmitting a hoisting force to said load to be hoisted. Said support structure comprises an anchoring beam structure comprising a lower end engaging the lower edge structure, and an upper end engaging the upper edge structure; and a support beam structure connected to the anchoring beam structure and protruding from the anchoring beam structure into the hoistway; and wherein said at least one flexible tension member hangs in the hoistway supported by the support beam structure. The invention also relates to a method implementing the construction arrangement.
-
公开(公告)号:US20220219945A1
公开(公告)日:2022-07-14
申请号:US17709949
申请日:2022-03-31
Applicant: Kone Corporation
Inventor: Otto LANZ , Matti RASANEN , Anssi VENHO , Janne MIKKONEN , Janne LAINE , Markku HAAPANIEMI , Jari KANTOLA , Aki HAIKONEN , Jari OSTERMAN , Petri KERE , Jori HAGG , Jorma MUSTALAHTI , Tarvo VIITA-AHO
Abstract: The self-climbing elevator machine room comprises two decks positioned upon each other. Each deck comprises guide means supporting the deck movably on guide rails and locking means locking and unlocking the deck to the guide rails and/or to guide rail fixing means. Lifting means move the two decks along the guide rails in relation to each other. At least one power source provides power to the lifting means. The elevator machine room climbs stepwise along the guide rails by alternatingly locking and unlocking the lower deck and the upper deck to the guide rails and/or to the guide rail fixing means and thereafter raising the unlocked deck.
-
-
-
-
-
-
-
-
-