CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD

    公开(公告)号:US20230322522A1

    公开(公告)日:2023-10-12

    申请号:US18329983

    申请日:2023-06-06

    CPC classification number: B66B11/0045

    Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway formed in a building, the hoistway comprising at least one hoistway opening leading in horizontal direction out from the hoistway, the opening being delimited by a lower edge structure and an upper edge structure; and a load in the hoistway lower than said opening; and a hoisting arrangement for hoisting said load, wherein said hoisting arrangement comprises a support structure mounted higher than said load; and a hoisting device; and at least one flexible tension member connected or at least connectable to said load; wherein the at least one flexible tension member is movable with said hoisting device in particular for thereby transmitting a hoisting force to said load to be hoisted. Said support structure comprises an anchoring beam structure comprising a lower end engaging the lower edge structure, and an upper end engaging the upper edge structure; and a support beam structure connected to the anchoring beam structure and protruding from the anchoring beam structure into the hoistway; and wherein said at least one flexible tension member hangs in the hoistway supported by the support beam structure. The invention also relates to a method implementing the construction arrangement.

    METHOD FOR CONSTRUCTING AN ELEVATOR, GUIDE RAIL INSTALLATION APPARATUS, GUIDE RAIL INSTALLATION ARRANGEMENT AND METHOD FOR INSTALLING A GUIDE RAIL OF AN ELEVATOR

    公开(公告)号:US20230242379A1

    公开(公告)日:2023-08-03

    申请号:US18299383

    申请日:2023-04-12

    CPC classification number: B66B19/04 B66B19/002 B66B19/005 B66B19/02

    Abstract: The invention relates to a method for constructing an elevator comprising installing comprising installing an elevator car, a counterweight, one or more vertically oriented guide rail lines, a hoisting machine in a first position, and a first hoisting roping for being moved by the hoisting machine, said installing further comprising connecting the first hoisting roping to the elevator car and counterweight; and thereafter transporting passengers and/or goods with the elevator car vertically in the hoistway while the hoisting machine is in said first position; and thereafter stopping said transporting; and thereafter removing said hoisting machine from said first position and the first roping from the hoistway, said removing comprising disconnecting the first hoisting roping from the elevator car and counterweight; wherein the method further comprises installing a hoisting machine in a second position which is higher than the first position, and a second roping for being moved by the hoisting machine, said installing comprising, connecting the second hoisting roping to the elevator car and counterweight; and thereafter transporting passengers and/or goods with the elevator car vertically in the hoistway while the hoisting machine is in said second position, said transporting comprising moving the elevator car with the hoisting machine and the second hoisting roping.