Abstract:
A management computer manages first XaaS including a first node configuration and second XaaS including a second node configuration that is dependent on resources provided by the first XaaS. When a required resource amount which is required for the first XaaS in order to change the second node configuration is larger than a resource amount which can be provided by the first XaaS, the management computer determines a changed first node configuration which is capable of providing a resource amount equal to or larger than the required resource amount and, after changing the first XaaS to the determined changed first node configuration, changes the second node configuration of the second XaaS.
Abstract:
A management system, which manages at least a computer system including a copy destination VOL, receives first performance related information including information related to a resource related to an operation with which a copy source VOL is associated as an I/O destination, and stores the received first performance related information. When an operation migrates from a first site to a second site (for example, when the first site is affected by a disaster), the management system reallocates a resource of the second site based on both the first performance related information and second performance related information including information related to a resource related to an operation originally executed at the second site among a resource group of the second site.
Abstract:
A management system manages a plurality of management target devices. A storage device stores one or more rules, plan information, and plan history information. A control device specifies a first cause event that is a candidate of a cause of the event that has occurred in any one of the management target devices based on the one or more rules, specifies a plurality of first plans that can be executed in the case in which the first cause event is a cause based on the plan information, calculates an index value indicating a possibility of succeeding in a failure recovery in the case in which the plan is executed for each of the plurality of first plans based on the plan history information, and displays data indicating any one or more plans of the plurality of first plans according to a display mode decided based on the index value.
Abstract:
In a system, such as a cloud, which allows resource allocation to be flexibly changed in a multi-tenant environment, it is necessary to interchange resources between the tenants. Efficient resource coordination for resource allocation cannot be attained by merely adjusting resource allocation amounts or resource usage amounts. In order to address this problem, the present invention selects an optimum allocation method from among a plurality of resource allocation methods including CPU capping, taking into account each period for which resources must be allocated and the manner in which each tenant uses resources, and then coordinates allocation of resources across the entire system using the selected allocation method. This makes it possible to improve the efficiency of resource coordination even in a multi-tenant environment.
Abstract:
A management computer has a processor configured to: select a service performance name pairing with a received first apparatus performance name; select a performance value of the received first apparatus performance name and a performance value of the selected service performance name; select a threshold of the first apparatus performance name and a threshold of the selected service performance name; determine whether the performance value of the first apparatus performance name exceeds the threshold of the first apparatus performance name within a predetermined period; determine whether the performance value of the service performance name exceeds the threshold of the service performance name within the predetermined period; and when a determination result of the performance value of the first apparatus performance name and a determination result of the performance value of the service performance name are the same result simultaneously, increase evaluation of the threshold of the first apparatus name.
Abstract:
A system management method for a management computer coupled to a computer system, the computer system including a plurality of computers, an operations system being built thereon the computer system, the operations system including a plurality of task nodes each having allocated thereto computer resources, the system management method including: a step of analyzing a configuration of the computer system for specifying a important node, which is an important task node in the operations system; a step of changing an allocation amount of the computer resources allocated to the important node for measuring a load of the operations system; a step of calculating a first weighting representing a strength of associations among the plurality of task nodes based on a measurement result of the load; and a step of specifying a range impacted by a change in the load of the important node based on the calculated first weighting.
Abstract:
A management computer for managing allocation of an application and an application probe in a computer system including a plurality of computers, the management computer comprising a probe management part configured to determine a computer for allocating a new application and a new application probe, the probe management part being configured to: retrieve a computer satisfying a configuration condition and a monitoring interval condition; compute a value of a monitoring spike, in a case where the new application and the new application probe are allocated to the retrieved computer, determine the retrieved computer as a candidate computer to which the application and the application probe are to be allocated, in a case where it is determined that the computed value of the monitoring spike is smaller than a predetermined threshold.