Abstract:
A method for optimizing a fleet of generating assets in which groupings include remotely located power blocks that operate so to collectively generate a fleet output level. The method may include: receiving real-time and historical measured values of operating parameters; for each of the generating assets, deriving a relational expression between the measured values of the process inputs and the measured values of the process outputs; defining a selected operating period; selecting competing operating modes for the fleet; based on the relational expressions and a generating configuration of the competing operating modes, calculating a result set for the operation of the fleet proposed during the selected operating period; defining a cost function; and evaluating each of the result sets pursuant to the cost function and, based thereupon, designating one of the competing operating modes as an optimized operating mode. The optimized operating mode may include a power sharing recommendation between the power blocks of the fleet.
Abstract:
Systems and methods provided herein. In one embodiment, a system includes an advisory system including a loss computation engine configured to derive a total system loss for an industrial plant based on a first sensor positioned in a first industrial plant component and on a first physical model of the first industrial plant component. The advisory system further includes a cost model configured to use a cost function to derive a cost based on the total system loss, and a control strategy system configured to derive an advisory report, a control correction factor, or a combination thereof, based on the cost, wherein a control system is configured to apply the control correction factor to control a process in the industrial plant.
Abstract:
A method for controlling and enhancing a startup operation for a combined cycle power block (block) having at least one gas turbine and at least one steam turbine, wherein operating parameters define performance and operational characteristics for the startup operation, the method comprising: receiving measured operating parameters from a plurality of reference blocks and, for each of the plurality of reference blocks, a plurality of types of the startup operations; given the measured operating parameters, developing one or more reference transfer functions between two of the measured operating parameters; receiving measured operating parameters from the startup operation of a target block; given the measured operating parameters from the target block, developing one or more transfer functions for the target block between two of the operating parameters; selecting one of the reference transfer functions; and normalizing the transfer function of the target block per the selected reference transfer function.
Abstract:
A combined cycle power plant system that includes: a gas turbine operably connected to a heat recovery steam generator; a first controller for optimizing a shutdown operation defined between an initiating shutdown command and a terminating event, wherein the first is controller configured to execute the steps of: receiving the shutdown initiating command; receiving operating parameters measured by sensors for each of a first component and a second component of the combined cycle power plant, and, based thereupon, determining a current state for each of the first and the second component; based on the current state, deriving an optimized shutdown operating mode for transitioning the first component and the second component from the current state to a shutdown state. A second controller may be configured to: transform the optimized shutdown operating mode into commands configured to actuate mechanical control devices of the first component and the second component so that the shutdown operation proceeds according to the optimized shutdown operating mode.
Abstract:
A combined cycle power plant system that includes: a gas turbine operably connected to a heat recovery steam generator; a first controller for optimizing a shutdown operation defined between an initiating shutdown command and a terminating event, wherein the first is controller configured to execute the steps of: receiving the shutdown initiating command; receiving operating parameters measured by sensors for each of a first component and a second component of the combined cycle power plant, and, based thereupon, determining a current state for each of the first and the second component; based on the current state, deriving an optimized shutdown operating mode for transitioning the first component and the second component from the current state to a shutdown state. A second controller may be configured to: transform the optimized shutdown operating mode into commands configured to actuate mechanical control devices of the first component and the second component so that the shutdown operation proceeds according to the optimized shutdown operating mode.
Abstract:
Systems and methods provided herein. In one embodiment, a system includes an advisory system including a loss computation engine configured to derive a total system loss for an industrial plant based on a first sensor positioned in a first industrial plant component and on a first physical model of the first industrial plant component. The advisory system further includes a cost model configured to use a cost function to derive a cost based on the total system loss, and a control strategy system configured to derive an advisory report, a control correction factor, or a combination thereof, based on the cost, wherein a control system is configured to apply the control correction factor to control a process in the industrial plant.
Abstract:
A method for determining an operating set point for a combined cycle power plant, the method includes: simulating the operation of the power plant; correcting the simulation of the operation of the power plant; optimizing the simulation of the operation by simulating the operation at different operating settings and selecting at least one of the operating settings as being optimal, and generating the operating set point based on the optimized simulation of the power plant.
Abstract:
A method for determining an operating set point for a combined cycle power plant, the method includes: simulating the operation of the power plant; correcting the simulation of the operation of the power plant; optimizing the simulation of the operation by simulating the operation at different operating settings and selecting at least one of the operating settings as being optimal, and generating the operating set point based on the optimized simulation of the power plant.
Abstract:
A method for optimizing a generation of an output level over a selected operating period by a power block, wherein the power block comprises multiple gas turbines for collectively generating the output level. The control method may include: receiving current state data regarding measured operating parameters for each of the gas turbines of the power block; based on the current state data, defining competing operating modes for the power block; based on each of the competing operating modes, deriving a predicted value for a performance parameter regarding the operation of the power block over the selected operating period; determining a cost function and, pursuant thereto, evaluating the operation of the power block based on the predicted value of the performance parameter so to determine a projected cost; and comparing the projected costs from each of the optimized operating modes so to select therefrom an optimized operating mode.
Abstract:
A method for controlling and enhancing a startup operation for a combined cycle power block (block) having at least one gas turbine and at least one steam turbine, wherein operating parameters define performance and operational characteristics for the startup operation, the method comprising: receiving measured operating parameters from a plurality of reference blocks and, for each of the plurality of reference blocks, a plurality of types of the startup operations; given the measured operating parameters, developing one or more reference transfer functions between two of the measured operating parameters; receiving measured operating parameters from the startup operation of a target block; given the measured operating parameters from the target block, developing one or more transfer functions for the target block between two of the operating parameters; selecting one of the reference transfer functions; and normalizing the transfer function of the target block per the selected reference transfer function.