公开(公告)号:US20240102388A1
公开(公告)日:2024-03-28
申请号:US18494907
申请日:2023-10-26
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
IPC: F01C20/28 , F01D17/06 , F01D17/14 , F01D17/26 , F01D21/02 , F01K13/00 , F01K13/02 , F02C7/232 , F02C9/26 , F02C9/28 , F02C9/52 , F02C9/54 , F16K37/00 , G01P21/02 , G01R31/28 , H02J3/38 , H02J3/40
CPC classification number: F01C20/28 , F01D17/06 , F01D17/145 , F01D17/26 , F01D21/02 , F01K13/003 , F01K13/02 , F02C7/232 , F02C9/263 , F02C9/28 , F02C9/52 , F02C9/54 , F16K37/0041 , F16K37/0083 , G01P21/02 , G01R31/2829 , H02J3/381 , H02J3/40 , F05D2220/31 , F05D2260/80 , F05D2270/02 , F05D2270/021 , F05D2270/80
Abstract: A system for controlling a turbine valve is provided. The system includes a hydraulic pilot valve section being moveable in a first direction and a second direction; a main hydraulic valve section being moveable in a first direction to close the turbine valve and a second direction to open the turbine valve; a position demand indicating a desired position of the turbine valve; a first feedback indicating an actual position of the hydraulic pilot valve section; and aa second feedback indicating an actual position of the main hydraulic valve section. The system also includes a pilot valve error; a main valve error; a turbine valve error; and a pilot valve adjustment moving the hydraulic pilot valve section in response to the turbine valve error. The turbine valve error is repeatedly determined and the pilot valve adjustment repeatedly moves the hydraulic pilot valve section to minimize the turbine valve error.
-
公开(公告)号:US11814964B2
公开(公告)日:2023-11-14
申请号:US17092477
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
IPC: F01C20/28 , G01P21/02 , G01R31/28 , F01D17/06 , F02C9/28 , F01D21/02 , H02J3/38 , H02J3/40 , F01K13/00 , F01K13/02 , F16K37/00 , F02C7/232 , F02C9/26 , F02C9/52 , F02C9/54 , F01D17/14 , F01D17/26
CPC classification number: F01C20/28 , F01D17/06 , F01D17/145 , F01D17/26 , F01D21/02 , F01K13/003 , F01K13/02 , F02C7/232 , F02C9/263 , F02C9/28 , F02C9/52 , F02C9/54 , F16K37/0041 , F16K37/0083 , G01P21/02 , G01R31/2829 , H02J3/381 , H02J3/40 , F05D2220/31 , F05D2260/80 , F05D2270/02 , F05D2270/021 , F05D2270/80
Abstract: A control system is provided for a turbine valve. The turbine valve has a first coil and a second coil to control or sense movement of a mechanical valve positioner. Two valve positioners are provided with each valve positioner having two drive circuits to drive the first and second coils. Switches are provided such that only one drive circuit is connected to each coil at a time. The control system may also include a hydraulic pilot valve section and a main hydraulic valve section. Feedbacks are used to determine a pilot valve error and a main valve error which are combined to determine a turbine valve error. The turbine valve error is repeatedly determined to minimize the error.
-
公开(公告)号:US20210054789A1
公开(公告)日:2021-02-25
申请号:US17092525
申请日:2020-11-09
Applicant: ABB Schweiz Ag
Inventor: Camilo Lopez , Mark Foltz , Steve Miller
Abstract: A turbine control system is provided for decreasing the response time between readings of the speed of the turbine and changing a valve position in response thereto. The speed control system includes a speed probe that detects the speed of the turbine and a turbine valve that controls the flow of fluid or gas from or to the turbine. A controller receives a speed signal from the speed probe and sends valve position commands to the turbine valve. The controller also sends support functions to the turbine valve. The controller sends the valve position commands at a faster rate than the support functions.
-
公开(公告)号:US11773721B2
公开(公告)日:2023-10-03
申请号:US17092447
申请日:2020-11-09
Applicant: ABB Schweiz Ag
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
IPC: F01C20/28 , G01P21/02 , G01R31/28 , F01D17/06 , F02C9/28 , F01D21/02 , H02J3/38 , H02J3/40 , F01K13/00 , F01K13/02 , F16K37/00
CPC classification number: F01C20/28 , F01D17/06 , F01D21/02 , F01K13/003 , F01K13/02 , F02C9/28 , F16K37/0041 , F16K37/0083 , G01P21/02 , G01R31/2829 , H02J3/381 , H02J3/40 , F05D2220/31 , F05D2260/80 , F05D2270/02 , F05D2270/021 , F05D2270/80
Abstract: A turbine speed probe diagnostic system is provided. The turbine includes a speed probe and a speed reading circuit. A speed lead connects the speed probe and speed reading circuit together to transmit speed signals from the speed probe to the speed reading circuit. A speed probe diagnostic circuit is also provided for connection to the speed lead. An isolation switch is provided to isolate the speed probe diagnostic circuit during normal operation when the speed reading circuit is receiving speed signals from the speed probe. When no speed signals are being received, the isolation switch closes and the speed probe diagnostic circuit performs a test on the speed probe or speed lead.
-
公开(公告)号:US11486251B2
公开(公告)日:2022-11-01
申请号:US17092570
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors , Xudong Yang
IPC: F01C20/28 , G01P21/02 , G01R31/28 , F01D17/06 , F02C9/28 , F01D21/02 , H02J3/38 , H02J3/40 , F01K13/00 , F01K13/02 , F16K37/00
Abstract: A speed control system and a power load balance detector for a turbine is provided. The speed control system includes a speed wheel with a plurality of teeth. A timer stores a time stamp when each of the teeth passes by a speed probe. A first speed estimate is determined for overspeed protection, and a second speed estimate is determined for operational speed control. The power load balance detector trips or shuts down the turbine when an unbalance is above a first threshold and the speed of the turbine is above a second threshold.
-
公开(公告)号:US11898449B2
公开(公告)日:2024-02-13
申请号:US17092525
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller
IPC: F01C20/28 , G01P21/02 , G01R31/28 , F01D17/06 , F02C9/28 , F01D21/02 , H02J3/38 , H02J3/40 , F01K13/00 , F01K13/02 , F16K37/00 , F02C7/232 , F02C9/26 , F02C9/52 , F02C9/54 , F01D17/14 , F01D17/26
CPC classification number: F01C20/28 , F01D17/06 , F01D17/145 , F01D17/26 , F01D21/02 , F01K13/003 , F01K13/02 , F02C7/232 , F02C9/263 , F02C9/28 , F02C9/52 , F02C9/54 , F16K37/0041 , F16K37/0083 , G01P21/02 , G01R31/2829 , H02J3/381 , H02J3/40 , F05D2220/31 , F05D2260/80 , F05D2270/02 , F05D2270/021 , F05D2270/80
Abstract: A turbine control system is provided for decreasing the response time between readings of the speed of the turbine and changing a valve position in response thereto. The speed control system includes a speed probe that detects the speed of the turbine and a turbine valve that controls the flow of fluid or gas from or to the turbine. A controller receives a speed signal from the speed probe and sends valve position commands to the turbine valve. The controller also sends support functions to the turbine valve. The controller sends the valve position commands at a faster rate than the support functions.
-
公开(公告)号:US12140033B2
公开(公告)日:2024-11-12
申请号:US18494907
申请日:2023-10-26
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
IPC: F01C20/28 , F01D17/06 , F01D17/14 , F01D17/26 , F01D21/02 , F01K13/00 , F01K13/02 , F02C7/232 , F02C9/26 , F02C9/28 , F02C9/52 , F02C9/54 , F16K37/00 , G01P21/02 , G01R31/28 , H02J3/38 , H02J3/40
Abstract: A system for controlling a turbine valve is provided. The system includes a hydraulic pilot valve section being moveable in a first direction and a second direction; a main hydraulic valve section being moveable in a first direction to close the turbine valve and a second direction to open the turbine valve; a position demand indicating a desired position of the turbine valve; a first feedback indicating an actual position of the hydraulic pilot valve section; and aa second feedback indicating an actual position of the main hydraulic valve section. The system also includes a pilot valve error; a main valve error; a turbine valve error; and a pilot valve adjustment moving the hydraulic pilot valve section in response to the turbine valve error. The turbine valve error is repeatedly determined and the pilot valve adjustment repeatedly moves the hydraulic pilot valve section to minimize the turbine valve error.
-
公开(公告)号:US11225867B2
公开(公告)日:2022-01-18
申请号:US17092554
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
Abstract: A breaker between two electrical circuits is provided that is closed when electrical properties in both of the electrical circuits are matching. Two check circuits are provided for comparing electrical properties of the two electrical circuits. Each of the check circuits sets a corresponding authorization to close the breaker. The breaker is only closed if both check circuits set an authorization to close the circuit.
-
公开(公告)号:US20210054790A1
公开(公告)日:2021-02-25
申请号:US17092570
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Weland , Alan Majors , Xudong Yang
Abstract: A speed control system and a power load balance detector for a turbine is provided. The speed control system includes a speed wheel with a plurality of teeth. A timer stores a time stamp when each of the teeth passes by a speed probe. A first speed estimate is determined for overspeed protection, and a second speed estimate is determined for operational speed control. The power load balance detector trips or shuts down the turbine when an unbalance is above a first threshold and the speed of the turbine is above a second threshold.
-
公开(公告)号:US20220154602A9
公开(公告)日:2022-05-19
申请号:US17092477
申请日:2020-11-09
Applicant: ABB Schweiz AG
Inventor: Camilo Lopez , Mark Foltz , Steve Miller , Kevin Dowdell , Mark Wieland , Alan Majors
Abstract: A control system is provided for a turbine valve. The turbine valve has a first coil and a second coil to control or sense movement of a mechanical valve positioner. Two valve positioners are provided with each valve positioner having two drive circuits to drive the first and second coils. Switches are provided such that only one drive circuit is connected to each coil at a time. The control system may also include a hydraulic pilot valve section and a main hydraulic valve section. Feedbacks are used to determine a pilot valve error and a main valve error which are combined to determine a turbine valve error. The turbine valve error is repeatedly determined to minimize the error.
-
-
-
-
-
-
-
-
-