Abstract:
A method for retrofitting a pulverized coal boiler in an air combustion boiler system is disclosed, which has a plurality of burners over a plurality of stages along the vertical direction on a wall surface of a furnace of the pulverized coal boiler and an after-air port for introducing air for two-stage combustion located above the burners to retrofit into a two-stage combustion pulverized coal boiler in an oxyfuel combustion boiler system.
Abstract:
A gas concentration estimation device of a coal-burning boiler adapted to estimate the concentration of the gas component included in an exhaust gas emitted from a coal-burning boiler using a neural network, including: a process database section adapted to store process data of a coal-burning boiler; a filtering processing section adapted to perform filtering processing for extracting data suitable for learning of a neural network from the process data stored in the process database section; a neural-network learning processing section adapted to perform learning processing of the neural network based on the data extracted by the filtering processing section and suitable for learning of the neural network; and a neural-network estimation processing section adapted to perform estimation processing of the CO concentration or the NOx concentration in the exhaust gas emitted from the coal-burning boiler based on the learning processing of the neural-network learning processing section.
Abstract:
A plant control apparatus has a measurement signal DB, an operation signal DB, a numerical value analysis executing unit, a numerical value analysis result DB, a model for estimating a value of a measurement signal for an operation signal, learning unit using the model, a learning information DB, a control logic DB for information used by an operation signal generating unit, a knowledge DB for plant running characteristics, and an analyzing unit processing information in the numerical value analysis result DB by information in the knowledge DB, learning information DB, operation signal DB, and measurement signal DB, wherein the analyzing unit includes at least one of a learning base analyzing unit checking adequacy of an operation method, a signal analyzing unit for evaluating an effect of the operation signal upon the plant and presence/absence of an abnormal signal, and a knowledge DB updating unit correcting information in the knowledge DB.
Abstract:
Assembly of a controller-integrated rotating electric machine is facilitated. In a controller-integrated rotating electric machine provided with a rotating electric machine unit having a rotor (2), a stator (3), and brackets (4, 5); a plurality of stator current switching circuit units (13) that are attached on an insulator cover (14) mounted on the brackets (4, 5); and a controller unit having a control circuit board (102), the stator current switching circuit unit (13) is provided with a plurality of switching elements (13a) and a plurality of switching elements (13b); a pair of heat sinks (13g, 13h) with which the drain terminals of the switching elements (13a, 13b) are connected; and a pair of electric connection members (17, 18) that pull out the terminals of the switching elements (13a, 13b) and that hold and integrate the pair of heat sinks (13g, 13h). Additionally, the plurality of stator current switching circuit units (13) is fixed to a relaying connection member (16), and electric connections between the stator current switching circuit units (13) and outside members are performed by the intermediary of the relaying connection member (16).
Abstract:
An oxyfuel combustion boiler plant comprising: an air separation unit for manufacturing oxygen by separating nitrogen from air, a boiler having a burner for burning the oxygen supplied from the air separation unit and pulverized coal, and a primary system pipe for supplying the pulverized coal to the burner, an exhaust gas recirculation system pipe for supplying combustion exhaust gas discharged from the boiler to the primary system pipe, and a carbon dioxide capture unit for capturing carbon dioxide in the exhaust gas discharged from the boiler, the oxyfuel combustion boiler plant is further comprising: an oxygen supply pipe for supplying the oxygen manufactured by the air separation unit to the primary system pipe in the burner, and a pipe for supplying the combustion exhaust gas discharged from the boiler to the oxygen supply pipe, wherein an injection port of the oxygen supply pipe is disposed on an upstream side of an injection portion of the burner.
Abstract:
An oxyfuel boiler structured so as to mix oxygen separated from air with a part of exhaust gas branched from exhaust gas discharged from the boiler for generating vapor and supplying to a vapor demand facility by burning coal fuel, and supply the mixed gas to the boiler as an oxidizing gas for burning the coal, wherein an air separation unit for separating air and manufacturing oxygen from air, an oxygen supply system for leading the oxygen manufactured by the air separation unit to the oxyfuel boiler, a recirculation system for leading a part of exhaust gas branched from the exhaust gas discharged from the oxyfuel boiler to the oxyfuel boiler, and a recirculation fan for supplying the exhaust gas to the recirculation system are installed, respectively.
Abstract:
A thiazolidine derivative represented by the formula (I) wherein each symbol is as defined in the specification, and a pharmaceutically acceptable salt thereof exhibit a potent DPP-IV inhibitory activity, and can be provided as an agent for the prophylaxis or treatment of diabetes, an agent for the prophylaxis or treatment of obesity and the like.
Abstract:
The present invention provides a pharmaceutical agent for the treatment and/or prophylaxis of abnormal blood glucose and lipid metabolism associated with eating, for which a sufficient treatment method or a therapeutic drug has not been found.
Abstract:
A gas turbine washing-date determination apparatus of the present invention is equipped with a sum cost calculation means for calculating a sum of loss cost due to not washing a compressor from a compressor efficiency calculated, and determines a gas turbine washing-date with using the sum of the loss cost. Meanwhile, in the gas turbine washing-date determination apparatus the compressor efficiency is calculated from process data of a gas turbine plant, and a compressor washing-date is determined, based on the compressor efficiency.
Abstract:
Documents used for process control can be managed and maintained from a document server and a terminal. In order to update the documents quickly so that an operated process is always kept in the most preferable state of operation, the document server stores and manages production documents used for actually controlling and monitoring a control system plant, whereas the terminal system is used to refer and edit plant documents. The terminal can synchronize contents of the plant documents in the document server with those in the control system before storing the synchronized plant documents in the terminal.