Over-rating control in wind turbines and wind power plants
    2.
    发明授权
    Over-rating control in wind turbines and wind power plants 有权
    风力发电机组和风力发电厂的过度评估控制

    公开(公告)号:US09018782B2

    公开(公告)日:2015-04-28

    申请号:US13876068

    申请日:2011-09-30

    Abstract: Wind turbines of a wind power plant may be selectively over-rated by measuring the difference between the nominal and actual power plant outputs and deriving an over-rating request signal based on that difference which is sent to each turbine. The same value may be sent to each turbine. Alternatively, each turbine may be given its own over-rating amount based on an optimization of the turbine. Over-rating may also be used when external economic factors such as energy costs are sufficiently high to out-weigh any potential harmful effect of over-rating. The fatigue lifetime of turbines and their critical components may also be taken into account when deciding whether and to what extent to implement an over-rating command.

    Abstract translation: 风力发电厂的风力涡轮机可以通过测量标称电力和实际发电厂输出之间的差异来选择性地过度评估,并且基于发送到每个涡轮机的差异导出过高额定值请求信号。 相同的值可以发送到每个涡轮机。 或者,基于涡轮机的优化,每个涡轮机可以被给予其自己的超额定量。 当外部经济因素如能源成本足够高以超出任何潜在的超额评估有害影响时,也可能会使用过高评级。 在决定是否以及在多大程度上实施过度评估命令时,也可以考虑涡轮机及其关键部件的疲劳寿命。

    OVER-RATING CONTROL IN WIND TURBINES AND WIND POWER PLANTS
    5.
    发明申请
    OVER-RATING CONTROL IN WIND TURBINES AND WIND POWER PLANTS 有权
    风力涡轮机和风力发电厂的超额定值控制

    公开(公告)号:US20130270827A1

    公开(公告)日:2013-10-17

    申请号:US13876068

    申请日:2011-09-30

    Abstract: Wind turbines of a wind power plant may be selectively over-rated by measuring the difference between the nominal and actual power plant outputs and deriving an over-rating request signal based on that difference which is sent to each turbine. The same value may be sent to each turbine. Alternatively, each turbine may be given its own over-rating amount based on an optimisation of the turbine. Over-rating may also be used when external economic factors such as energy costs are sufficiently high to out-weigh any potential harmful effect of over-rating. The fatigue lifetime of turbines and their critical components may also be taken into account when deciding whether and to what extent to implement an over-rating command.

    Abstract translation: 风力发电厂的风力涡轮机可以通过测量标称电力和实际发电厂输出之间的差异来选择性地过度评估,并且基于发送到每个涡轮机的差异导出过高额定值请求信号。 相同的值可以发送到每个涡轮机。 或者,基于涡轮机的优化,每个涡轮机可以被给予其自己的超额定量。 当外部经济因素如能源成本足够高以超出任何潜在的超额评估有害影响时,也可能会使用过高评级。 在决定是否以及在多大程度上实施过度评估命令时,也可以考虑涡轮机及其关键部件的疲劳寿命。