Slip formed concrete wind turbine tower
    1.
    发明授权
    Slip formed concrete wind turbine tower 失效
    滑模式混凝土风力发电机塔

    公开(公告)号:US08281546B2

    公开(公告)日:2012-10-09

    申请号:US12752479

    申请日:2010-04-01

    IPC分类号: E04H12/34 F03D11/04

    摘要: A wind turbine is formed of a concrete tower which is erected by slip forming. A primary lifting device is erected onto the tower by being lifted together with the slip form and being subsequently transferred onto the tower from the slip form after the tower has been formed. The nacelle, generator, and rotor of the turbine are then lifted onto the tower using the primary lifting device. A secondary lifting device supported on the tower is used to lower the primary lifting device to the ground after the nacelle, generator and rotor are assembled. The height of the tower is therefore not limited by the availability of suitable cranes so that a greater height of tower can be erected to take advantage of winds at greater elevation.

    摘要翻译: 风力涡轮机由通过滑移成形竖立的混凝土塔形成。 一个主提升装置通过与滑动形式一起提升到塔架上,随后在塔架形成之后从滑动形式转移到塔架上。 然后使用主提升装置将涡轮的机舱,发电机和转子提升到塔架上。 在机舱,发电机和转子组装后,用于支撑在塔架上的辅助提升装置用于将主提升装置降低到地面。 因此,塔的高度不受适当的起重机的可用性的限制,使得可以竖立更大的塔架高度以利用较高高度的风。

    Slip Formed Concrete Wind Turbine Tower
    2.
    发明申请
    Slip Formed Concrete Wind Turbine Tower 失效
    滑模混凝土风力发电塔

    公开(公告)号:US20100281819A1

    公开(公告)日:2010-11-11

    申请号:US12752479

    申请日:2010-04-01

    IPC分类号: E04H12/00

    摘要: A wind turbine is formed of a concrete tower which is erected by slip forming. A primary lifting device is erected onto the tower by being lifted together with the slip form and being subsequently transferred onto the tower from the slip form after the tower has been formed. The nacelle, generator, and rotor of the turbine are then lifted onto the tower using the primary lifting device. A secondary lifting device supported on the tower is used to lower the primary lifting device to the ground after the nacelle, generator and rotor are assembled. The height of the tower is therefore not limited by the availability of suitable cranes so that a greater height of tower can be erected to take advantage of winds at greater elevation.

    摘要翻译: 风力涡轮机由通过滑移成形竖立的混凝土塔形成。 一个主提升装置通过与滑动形式一起提升到塔架上,随后在塔架形成之后从滑动形式转移到塔架上。 然后使用主提升装置将涡轮的机舱,发电机和转子提升到塔架上。 在机舱,发电机和转子组装后,用于支撑在塔架上的辅助提升装置用于将主提升装置降低到地面。 因此,塔的高度不受适当的起重机的可用性的限制,使得可以竖立更大的塔架高度以利用较高高度的风。