公开(公告)号:US20240410280A1
公开(公告)日:2024-12-12
申请号:US18401727
申请日:2024-01-02
Inventor: Gang LEI , Fucai HUA , Zhihui YANG , Jianye ZHU , Chao LI
Abstract: A method for selecting parameters for tunnel support based on engineering-oriented behavior discrimination of surrounding rock includes: obtaining basic geological data of a running tunnel, establishing a model of a relative location relationship between the running tunnel and a stratum, and determining a chamber environment classification of a surrounding rock of the running tunnel; determining rock integrity of the surrounding rock of the running tunnel based on the basic geological data; determining a groundwater development level of the surrounding rock of the running tunnel based on the basic geological data; determining, based on the basic geological data, whether there is a slip surface on the surrounding rock of the running tunnel; and selecting support parameters for a corresponding support measure based on behavior of the surrounding rock including the chamber environment classification, the rock integrity, the groundwater development level, and whether the slip surface exists.
-
2.
公开(公告)号:US20240076848A1
公开(公告)日:2024-03-07
申请号:US18357174
申请日:2023-07-24
Applicant: Fucai HUA , Gang LEI , Zhihui YANG , Jianye ZHU , Beijing Urban Construction Design&Development Group Co., Limited
Inventor: Fucai HUA , Gang LEI , Zhihui YANG , Jianye ZHU , Liang ZHANG , Ning LI , Yanan DONG , Ningning LI
Abstract: A method for constructing a large-span station by two-wing open type semi-covered excavation and semi-reverse construction, is divided into three stages of excavation. First, excavate a first-stage inner small foundation pit, then excavate a second-stage annular foundation pit within the first-stage retaining piles and outside the range of the first-stage inner small foundation pit, and finally excavate a third-stage semi-covered excavation foundation pit below the first-stage inner small foundation pit and the second-stage annular foundation pit. By setting graded retaining piles, middle upright post piles, middle top plates, local waist beams and local concrete supports in the soil-rock combination strata, so that the force transfer between the foundation pit enclosure and the station main body structures and the underlying rock layer is clear and reliable, and a stable frame structure is achieved.
-
3.
公开(公告)号:US20240003254A1
公开(公告)日:2024-01-04
申请号:US18346285
申请日:2023-07-03
Applicant: Fucai HUA , Gang LEI , Zhihui YANG , Zhiyong ZHU , Beijing Urban Construction Design&Development Group Co., Limited
Inventor: Fucai HUA , Gang LEI , Zhihui YANG , Zhiyong ZHU , Guangliang ZHENG , Jianye ZHU , Chunxin HU , Endi CHI , Chanhong WANG , Li WANG , Ning LI
Abstract: Combination of an open and a hidden excavation for constructing a vertical orthogonal top exhausting air duct structure of a deeply-buried subway station is provided. Four horizontal air ducts: left and right piston air ducts, an exhaust air duct, and a fresh air duct are thrown out of the underground, respectively, leading to left and right piston air shafts, an exhaust air shaft, a fresh air shaft, and an entrance/exit of fire-fighting. The fourth underground floor is communicated with the hall floor of the station main body, and the fifth underground floor is communicated with the running tunnel and the platform floor of the station main body. During operation, the train will enter and exit the station through the fifth underground floor of the air duct, and the piston air and heat will enter the four transverse air ducts through the air duct main body.
-
4.
公开(公告)号:US20240352701A1
公开(公告)日:2024-10-24
申请号:US18403752
申请日:2024-01-04
Inventor: Gang LEI , Fucai HUA , Zhihui YANG , Kaijian WANG , Jianye ZHU , Chao LI , Liang ZHANG
IPC: E02D29/045
CPC classification number: E02D29/045
Abstract: A delaminated subway station structure in a sea-land connection region includes an openly-excavated station hall, a platform floor, a first air shaft duct, a second air shaft, up and down entrances and exits, a barrier-free entrance and exit, and an under-rail street passage, where the platform floor is formed by expanding an existing running tunnel, such that a double-vault structure of the platform floor is formed; two groups of up and down entrances and exits are disposed, and located in waiting regions on two sides respectively to connect expanded ear chambers on two sides and the openly-excavated station hall; two groups of barrier-free entrances and exits are disposed, and located in the waiting regions on the two sides respectively; and the under-rail street passage is closely attached to a bottom plate of the existing running tunnel to form an underpass and connects to the expanded ear chambers.
-
5.
公开(公告)号:US12123157B1
公开(公告)日:2024-10-22
申请号:US18403752
申请日:2024-01-04
Inventor: Gang Lei , Fucai Hua , Zhihui Yang , Kaijian Wang , Jianye Zhu , Chao Li , Liang Zhang
IPC: E02D29/045
CPC classification number: E02D29/045
Abstract: A delaminated subway station structure in a sea-land connection region includes an openly-excavated station hall, a platform floor, a first air shaft duct, a second air shaft, up and down entrances and exits, a barrier-free entrance and exit, and an under-rail street passage, where the platform floor is formed by expanding an existing running tunnel, such that a double-vault structure of the platform floor is formed; two groups of up and down entrances and exits are disposed, and located in waiting regions on two sides respectively to connect expanded ear chambers on two sides and the openly-excavated station hall; two groups of barrier-free entrances and exits are disposed, and located in the waiting regions on the two sides respectively; and the under-rail street passage is closely attached to a bottom plate of the existing running tunnel to form an underpass and connects to the expanded ear chambers.
-
6.
公开(公告)号:US12084971B1
公开(公告)日:2024-09-10
申请号:US18673287
申请日:2024-05-23
Inventor: Gang Lei , Zhihui Yang , Fucai Hua , Chao Xie , Jianye Zhu , Chao Li , Ningning Li , Tingting Zhou
CPC classification number: E21D11/107 , B61B1/00
Abstract: A section of a node of the station is a section with an arch roof and a straight wall of three underground floors, a first underground floor is a station hall floor 1, and a second underground floor is a platform floor 2 of a subway line A and a third underground floor is a platform floor 3 of a subway line B; and directions of the subway line A and the subway line B are orthogonal. Second lining structures of the first and second underground floors are firstly constructed, and after a shield tunneling machine is pushed through the station, the structure of the third underground floor is constructed by a reverse construction method. Thus, the present disclosure is conducive to improving the efficiency of overall construction, guaranteeing timely tunnel construction completion of two lines and hence timely track construction completion and electricity wiring completion.
-
公开(公告)号:US20240042489A1
公开(公告)日:2024-02-08
申请号:US18219708
申请日:2023-07-10
Applicant: Beijing Urban Construction Design & Development Group Co., Limited , Heptagon 5A Design (Beijing) Co.,Ltd
Inventor: Jinyan SHAO , Yuan LU , Yingjie LI , Hewu LU
Abstract: An automatic baggage-packing device for urban terminals based on artificial intelligence is provided. The automatic baggage-packing device includes a baggage transfer rack, baggage transfer rack forms a baggage transfer channel through a transfer stick, baggage transfer rack is equipped with several selectors located above the baggage transfer channel, the selectors are arranged in turn in the extension direction of the baggage transfer channel. The automatic baggage-packing device also includes an automatic loading device set outside of the baggage transfer rack to cooperate with the selectors to load the selected baggage. The invention has the effect of making baggage freight more convenient and quicker in use.
-
公开(公告)号:US11890650B1
公开(公告)日:2024-02-06
申请号:US18219708
申请日:2023-07-10
Applicant: Beijing Urban Construction Design & Development Group Co., Limited , Heptagon 5A Design (Beijing) Co., Ltd
Inventor: Jinyan Shao , Yuan Lu , Yingjie Li , Hewu Lu
Abstract: An automatic baggage-packing device for urban terminals based on artificial intelligence is provided. The automatic baggage-packing device includes a baggage transfer rack, baggage transfer rack forms a baggage transfer channel through a transfer stick, baggage transfer rack is equipped with several selectors located above the baggage transfer channel, the selectors are arranged in turn in the extension direction of the baggage transfer channel. The automatic baggage-packing device also includes an automatic loading device set outside of the baggage transfer rack to cooperate with the selectors to load the selected baggage. The invention has the effect of making baggage freight more convenient and quicker in use.
-
公开(公告)号:US12025008B2
公开(公告)日:2024-07-02
申请号:US18346285
申请日:2023-07-03
Applicant: Beijing Urban Construction Design&Development Group Co., Limited , Fucai Hua , Gang Lei , Zhihui Yang , Zhiyong Zhu
Inventor: Fucai Hua , Gang Lei , Zhihui Yang , Zhiyong Zhu , Guangliang Zheng , Jianye Zhu , Chunxin Hu , Endi Chi , Chanhong Wang , Li Wang , Ning Li
Abstract: Combination of an open and a hidden excavation for constructing a vertical orthogonal top exhausting air duct structure of a deeply-buried subway station is provided. Four horizontal air ducts: left and right piston air ducts, an exhaust air duct, and a fresh air duct are thrown out of the underground, respectively, leading to left and right piston air shafts, an exhaust air shaft, a fresh air shaft, and an entrance/exit of fire-fighting. The fourth underground floor is communicated with the hall floor of the station main body, and the fifth underground floor is communicated with the running tunnel and the platform floor of the station main body. During operation, the train will enter and exit the station through the fifth underground floor of the air duct, and the piston air and heat will enter the four transverse air ducts through the air duct main body.
-
10.
公开(公告)号:US11821316B1
公开(公告)日:2023-11-21
申请号:US18309336
申请日:2023-04-28
Inventor: Yonggang Jia , Yue He , Wen Cheng , Sicheng Jia , Weidong Lu , Fan Wu
CPC classification number: E21D11/107
Abstract: Provided are a system and construction method of a single-layer lining tunnel structure based on a mine-tunnelling method. With the single-layer lining tunnel structure, a structural rigidity and durability of the tunnel are improved. A construction process of sprayed concrete is improved, specifically, compactness agent and durability enhancing fiber are added to concrete to improve the compactness of concrete, and a special spraying process is adopted to reduce a bound rate of the concrete, and thus to improve the impermeability of sprayed concrete to reach a impermeability level of waterproof concrete. Steel fiber, cellulose fiber, synthetic fiber and other materials are added into the concrete can improve the tensile strength, crack resistance and durability of the concrete.
-
-
-
-
-
-
-
-
-