Machine-Learning-Based Prediction of Construction Project Parameters

    公开(公告)号:US20230142105A1

    公开(公告)日:2023-05-11

    申请号:US17521447

    申请日:2021-11-08

    Abstract: A computing platform is configured to: (i) at a first time, input data values for a first set of data variables associated with a given construction project into a first machine-learning model that functions to output a prediction of a first set of reference projects that are similar to the given construction project, (ii) based on historical data for the first set of reference projects, determine a predicted value for a parameter of the given construction project, (iii) at a second time, input data values for a second set of data variables associated with the given construction project into a second machine-learning model that functions to output a prediction of a second set of reference projects that are similar to the given construction project, and (iv) based on historical data for the second set of reference projects, determine an updated predicted value for the parameter of the given construction project.

    INTELLIGENT ROUTING CODE FOR IMPROVED PRODUCT DISTRIBUTION

    公开(公告)号:US20190220790A1

    公开(公告)日:2019-07-18

    申请号:US16360885

    申请日:2019-03-21

    Abstract: A computer-implemented method for managing a product delivery process, according to one embodiment, includes receiving an actual Intelligent Routing (IR) code for each good of a plurality of goods of the same type. A target IR code for each of at least two receivers is also received. The actual IR code for each of the goods is compared to the target IR codes for each of the at least two receivers. Based on the comparison of the actual IR codes for the plurality of goods to the target IR codes for each of the at least two receivers, a determination is made as to which receiver of the at least two receivers will receive which good of the plurality of goods. A result of the determination is output.

    UTILIZING ON-BOARD MEASUREMENTS AND LOCATION AS INPUTS INTO LOAD TRACKING

    公开(公告)号:US20190080525A1

    公开(公告)日:2019-03-14

    申请号:US15701688

    申请日:2017-09-12

    Abstract: A mobile machine includes a load carrying mechanism configured to carry a load of material during operation of the mobile machine at a worksite. The mobile machine includes a position detection system configured to determine a position of the mobile machine and generate a position output indicative of the position of the mobile machine. The mobile machine includes a measuring system configured to determine a measure of the load and generate a measure output indicative of the measure of the load. The mobile machine also includes a material movement tracking system configured to receive the position output from the position detection system and the measure output from the measuring system and, based on both the position and the measure output, generate a material tracking indicator indicative of movement of the load of material around the worksite.

    Computer-Implemented Engineering Review of Energy Consumption By Equipment

    公开(公告)号:US20180365611A1

    公开(公告)日:2018-12-20

    申请号:US16050034

    申请日:2018-07-31

    Applicant: Leidos, Inc.

    Abstract: A computer-implemented system and method are disclosed for performing engineering review of energy consumption by one or more equipment. One or more computers are connected to a specifications database. The computers are configured to receive end-user configurations corresponding to first equipment; retrieve one or more second equipment, as well as second equipment specifications from the specifications database; calculate an invoicing statement for the second equipment; and provide an engineering review report of the energy savings realized by implementing the second equipment. The first equipment may be an existing equipment, while the second equipment is one or more energy-efficient replacement alternatives to the first equipment. Each step is performed in real-time, using automated software modules and sub-modules. The engineering review report is applicable as an instant approval or pre-approval, qualifying the end-user for purchase incentives, which apply when the energy-efficient equipment alternatives are adopted by the end-user.

    INTEGRATED ASSET INTEGRITY MANAGEMENT SYSTEM
    100.
    发明申请

    公开(公告)号:US20180293551A1

    公开(公告)日:2018-10-11

    申请号:US15557824

    申请日:2016-04-20

    Abstract: An integrated asset integrity management system includes a plurality of asset information identifiers associated with a corresponding plurality of assets, a mobile communication device comprising a reading device for reading the identifiers, and a server in electronic communication with the mobile communication device. The server includes a database structure having a tracking system database that includes tracking system data corresponding to the asset information identifiers, and a performance database that includes data relating to performance of the assets. The mobile communication device transmits read asset information to the server. An electronic processor identifies assets corresponding to the read asset information identifiers and determines asset integrity issues for any of the assets. An output device outputs an indicator associated with the determined integrity issue. A framing algorithm uses a drill down technique for honing in on integrity issues at a location that may include a plurality of assets.

Patent Agency Ranking