-
公开(公告)号:US11663547B2
公开(公告)日:2023-05-30
申请号:US17072396
申请日:2020-10-16
Applicant: BANK OF AMERICA CORPORATION
Inventor: Madhusudhanan Krishnamoorthy , Preethi Dhayalan , S. Ushma Kaleshwari , Rani Kuncham , Charulatha Krishnakumar
IPC: G06F9/44 , G06Q10/0639 , G06Q10/10 , G06Q30/018 , G06N10/00 , G06Q10/0637 , G06Q10/101 , G06Q10/0631
CPC classification number: G06Q10/06395 , G06N10/00 , G06Q10/0637 , G06Q10/06313 , G06Q10/101 , G06Q10/103 , G06Q30/018
Abstract: Evolutionary learning techniques are used to validate and prioritize open source software libraries for subsequently determining the best open source software library for a specified technical project. Data associated with the open source software candidates is collected into a cluster and, at an eligibility layer, a fitness score is determined for each of the open source software candidate. Candidates that are determined to meet a required fitness score threshold are passed to the crossover layer, at which, software and hardware standards rules are applied to the open source software metadata to validate the open source software. Invalid candidates are held in queue and subjected to rework analysis. A mutation layer executes the crossover layer iteratively until a predetermined volume of open source candidates results. A ranking layer provides a prioritized ranking list, based on the fitness score, of those open source software candidates that have validated. The list is displayed with a dashboard application to applicable software developers.
-
公开(公告)号:US20230142105A1
公开(公告)日:2023-05-11
申请号:US17521447
申请日:2021-11-08
Applicant: Procore Technologies, Inc.
Inventor: James Adam Pita , Catherine Knuff
CPC classification number: G06Q10/06313 , G06Q10/06312 , G06K9/6223 , G06K9/6256 , G06N20/20
Abstract: A computing platform is configured to: (i) at a first time, input data values for a first set of data variables associated with a given construction project into a first machine-learning model that functions to output a prediction of a first set of reference projects that are similar to the given construction project, (ii) based on historical data for the first set of reference projects, determine a predicted value for a parameter of the given construction project, (iii) at a second time, input data values for a second set of data variables associated with the given construction project into a second machine-learning model that functions to output a prediction of a second set of reference projects that are similar to the given construction project, and (iv) based on historical data for the second set of reference projects, determine an updated predicted value for the parameter of the given construction project.
-
公开(公告)号:US20190220790A1
公开(公告)日:2019-07-18
申请号:US16360885
申请日:2019-03-21
Applicant: Zest Labs, Inc.
Inventor: Peter A. Mehring , Thomas Reese
CPC classification number: G06Q10/06313 , G01K3/04 , G06K19/0717 , G06Q10/06395 , G06Q10/08 , G06Q10/0832 , G06Q10/0833 , G06Q10/087
Abstract: A computer-implemented method for managing a product delivery process, according to one embodiment, includes receiving an actual Intelligent Routing (IR) code for each good of a plurality of goods of the same type. A target IR code for each of at least two receivers is also received. The actual IR code for each of the goods is compared to the target IR codes for each of the at least two receivers. Based on the comparison of the actual IR codes for the plurality of goods to the target IR codes for each of the at least two receivers, a determination is made as to which receiver of the at least two receivers will receive which good of the plurality of goods. A result of the determination is output.
-
94.
公开(公告)号:US20190205804A1
公开(公告)日:2019-07-04
申请号:US16325353
申请日:2016-09-07
Applicant: MITSUBISHI ELECTRIC CORPORATION
Inventor: Kengo SHIRAKI , Haruyuki OTANI
IPC: G06Q10/06
CPC classification number: G06Q10/06313 , G06Q10/06 , G06Q10/06316 , Y02P90/02 , Y02P90/30
Abstract: A process division unit selects a worker that matches a selection condition from a plurality of workers. Further, the process division unit analyzes, with respect to a selected worker being the worker selected, a decreasing state of a working hour due to increase in the number of times of carrying out a working process, and determines whether to divide the working process or not.
-
公开(公告)号:US20190205484A1
公开(公告)日:2019-07-04
申请号:US15858502
申请日:2017-12-29
Applicant: ALICE Technologies, Inc.
Inventor: René Morkos , Hossein Shahbazi , Carl Chatfield , Melvin Low , Dimitrios Farmakis , Dustin Calim
CPC classification number: G06F17/5004 , G06F17/50 , G06Q10/06 , G06Q10/06313 , G06Q10/06315 , G06Q50/08
Abstract: Provided herein are systems and methods for construction planning. The systems and methods may utilize construction recipes and recipe relationships between the construction recipes. A construction recipe may comprise a formula for building a construction element, and comprise one or more construction operations logically related by one or more logical relationships. The same construction recipe may be assigned to construction elements of the same type. An operation can be defined by required resources drawn from a resource pool.
-
公开(公告)号:US20190080525A1
公开(公告)日:2019-03-14
申请号:US15701688
申请日:2017-09-12
Applicant: Deere & Company
Inventor: Lance R. Sherlock
CPC classification number: G07C5/008 , E02F5/02 , E02F9/2054 , G06Q10/06312 , G06Q10/06313
Abstract: A mobile machine includes a load carrying mechanism configured to carry a load of material during operation of the mobile machine at a worksite. The mobile machine includes a position detection system configured to determine a position of the mobile machine and generate a position output indicative of the position of the mobile machine. The mobile machine includes a measuring system configured to determine a measure of the load and generate a measure output indicative of the measure of the load. The mobile machine also includes a material movement tracking system configured to receive the position output from the position detection system and the measure output from the measuring system and, based on both the position and the measure output, generate a material tracking indicator indicative of movement of the load of material around the worksite.
-
公开(公告)号:US20180365611A1
公开(公告)日:2018-12-20
申请号:US16050034
申请日:2018-07-31
Applicant: Leidos, Inc.
Inventor: Eric James Fontaine , Lars Johan Brasz , Kristi Jo Kezar
IPC: G06Q10/06
CPC classification number: G06Q10/06313 , G06Q10/06312 , G06Q10/0635 , G06Q10/06393 , Y02P90/82
Abstract: A computer-implemented system and method are disclosed for performing engineering review of energy consumption by one or more equipment. One or more computers are connected to a specifications database. The computers are configured to receive end-user configurations corresponding to first equipment; retrieve one or more second equipment, as well as second equipment specifications from the specifications database; calculate an invoicing statement for the second equipment; and provide an engineering review report of the energy savings realized by implementing the second equipment. The first equipment may be an existing equipment, while the second equipment is one or more energy-efficient replacement alternatives to the first equipment. Each step is performed in real-time, using automated software modules and sub-modules. The engineering review report is applicable as an instant approval or pre-approval, qualifying the end-user for purchase incentives, which apply when the energy-efficient equipment alternatives are adopted by the end-user.
-
98.
公开(公告)号:US20180321663A1
公开(公告)日:2018-11-08
申请号:US15584879
申请日:2017-05-02
Applicant: The Boeing Company
Inventor: Oscar Kipersztok , Paul J. Schachter , Uri Nodelman , Michael L. Callaghan
IPC: G05B19/418 , G06Q10/06
CPC classification number: G05B19/41865 , G06Q10/063114 , G06Q10/063116 , G06Q10/06312 , G06Q10/06313 , G06Q10/06316
Abstract: According to an embodiment, a computer-implemented method of identifying delay causing product assembly jobs in a factory that produces multiple products includes acquiring delay times for each of a plurality of jobs performed for assembly of each of a plurality of products at the factory, ranking the jobs according to a number of products affected by delay times, whereby a ranked jobs list is produced, adjusting at least one of a delay threshold, a job rank threshold, or a number of products threshold until a plot of amount of products affected by a delay exceeding the delay threshold as a dependent variable, versus ranked jobs of the ranked jobs list as an independent variable, exceeds the number of products threshold at the job rank threshold, and outputting an initial segment of the ranked jobs list up to the job rank threshold.
-
公开(公告)号:US20180319083A1
公开(公告)日:2018-11-08
申请号:US15772066
申请日:2016-10-27
Applicant: Stratasys Ltd.
Inventor: Avraham TEKEN , Boris BELOCON
IPC: B29C64/343 , B29C64/393 , B29C64/112 , G06Q10/06 , G06Q50/04
CPC classification number: B29C64/343 , B29C64/112 , B29C64/393 , B33Y10/00 , B33Y30/00 , B33Y50/02 , G06Q10/06 , G06Q10/06313 , G06Q50/04 , Y02P90/30
Abstract: A method for carrying out additive manufacture while regulating material consumption, comprises making a digital representation of at least part of an object for printing, the representation comprising a plurality of voxels, and then identifying voxels which are flexible in respect of being able to consist of any one of at least two available materials. A balanced material consumption policy is then used to choose between the available materials so as to ensure that as far as possible, different materials are evenly used and wastage is minimized. Finally the object is printed with the selected materials.
-
公开(公告)号:US20180293551A1
公开(公告)日:2018-10-11
申请号:US15557824
申请日:2016-04-20
Applicant: Parker-Hannifin Corporation
Inventor: Peter Vincent BUCA
CPC classification number: G06Q10/20 , G06K7/10297 , G06K2007/10504 , G06Q10/06313 , G06Q10/0833 , G06Q10/087
Abstract: An integrated asset integrity management system includes a plurality of asset information identifiers associated with a corresponding plurality of assets, a mobile communication device comprising a reading device for reading the identifiers, and a server in electronic communication with the mobile communication device. The server includes a database structure having a tracking system database that includes tracking system data corresponding to the asset information identifiers, and a performance database that includes data relating to performance of the assets. The mobile communication device transmits read asset information to the server. An electronic processor identifies assets corresponding to the read asset information identifiers and determines asset integrity issues for any of the assets. An output device outputs an indicator associated with the determined integrity issue. A framing algorithm uses a drill down technique for honing in on integrity issues at a location that may include a plurality of assets.
-
-
-
-
-
-
-
-
-