-
公开(公告)号:US20250052125A1
公开(公告)日:2025-02-13
申请号:US18928370
申请日:2024-10-28
Applicant: Innovex International, Inc.
Inventor: Andrew B. Mitchell
IPC: E21B33/043 , E21B33/04
Abstract: A seal assembly is provided. The seal includes an upper body; a lower body having a seal for sealing between a first wellhead system component and a second wellhead system component; and a space-out mechanism disposed between the upper body and the lower body, the space-out mechanism comprising a ramp ring having at least one tapered surface. The upper body has at least one tapered surface configured to interface with the at least one tapered surface of the ramp ring, the ramp ring is configured to rotate relative to the upper body and the lower body, and the at least one tapered surface of the ramp ring and the at least one tapered surface of the upper body are configured to bear against each other to rigidize the system.
-
公开(公告)号:US12221839B1
公开(公告)日:2025-02-11
申请号:US18420001
申请日:2024-01-23
Applicant: Osman Yusuf
Inventor: Osman Yusuf
IPC: E21B19/16 , E21B17/08 , E21B23/14 , E21B33/043 , E21B41/04 , E21B47/001 , E21B47/02
Abstract: An offshore platform slot recovery tool system having a housing, wherein the housing can include a plate extending below the housing, and wherein the plate comprises an elongated channel disposed within the plate. In addition, the system can include a first bracket secured to a lower end of the plate, and a first mount coupled to the plate and the first bracket, wherein the first mount is at least partially disposed within the elongated channel of the plate. Further, the elongated channel can be at an acute angle relative to one side of the plate.
-
公开(公告)号:US12168908B2
公开(公告)日:2024-12-17
申请号:US18328134
申请日:2023-06-02
Applicant: FMC Technologies, Inc.
Inventor: Paul L. Riley , Ramu Valliappan Manickam , Wei Soung Tan , May-Ling Rachel Ho , Guoxiang Calvin Wu
IPC: E21B33/035 , E21B33/043 , E21B33/064 , E21B33/076 , E21B34/02 , E21B34/04 , E21B43/013
Abstract: A flow control module includes an inlet hub, a flow meter, a choke, and an outlet hub. The inlet hub is coupled to a first flow passage having a first flow bore. The flow meter is associated with the first flow bore and positioned for top-down fluid flow. The choke is disposed in a second flow passage having a second flow bore. The second flow passage is coupled to a distal end of the first flow passage. The outlet hub is coupled to a distal end of the second flow passage and faces in a different direction from the inlet hub.
-
公开(公告)号:US20240209710A1
公开(公告)日:2024-06-27
申请号:US18597246
申请日:2024-03-06
Applicant: Dril-Quip, Inc.
Inventor: Blake T. DeBerry , Morris B. Wade , Flavio Santos , Gregory Norwood , Robert Buxton , Justin Rye , Todd L. Scaggs
IPC: E21B33/04 , E21B33/03 , E21B33/043
CPC classification number: E21B33/04 , E21B33/03 , E21B33/0407 , E21B33/043
Abstract: Systems and methods for landing a tubing hanger in a wellhead and then orienting a tree (or spool, or flowline connection body) relative to the tubing hanger while landing the tree on the wellhead are provided. This alignment is accomplished without the use of either a tubing spool or a BOP stack with an orientation pin. The tubing hanger alignment devices may be used to orientate the tree as the tree is landed so that the couplings and stabs between the tree and the tubing hanger line up with each other just at the moment of landing.
-
公开(公告)号:US20230399913A1
公开(公告)日:2023-12-14
申请号:US18246614
申请日:2021-10-18
Applicant: CCB Subsea AS
Inventor: Helge Løken
IPC: E21B33/035 , E21B33/043
CPC classification number: E21B33/035 , E21B33/043
Abstract: A method for operating an apparatus for installing a tubing hanger in a subsea wellhead or X-mas tree without hydraulic cables from the surface and without valves for controlling hydraulic functions. The method includes: providing an apparatus for installing the tubing hanger; preparing the apparatus for installation; actuating the tubing hanger's locking function via pressurized completion fluid that causes direct actuation of ring pistons that are arranged to operate the locking sleeve and the locking segments of the tubing hanger; verifying the tubing hanger is locked; and releasing the apparatus mechanically or hydraulically from the installed tubing hanger.
-
公开(公告)号:US20230340871A1
公开(公告)日:2023-10-26
申请号:US17791215
申请日:2021-01-08
Applicant: AKER SOLUTIONS AS
Inventor: JOAKIM MARTENS , GEIR IVAR HOLBERG , MARTIN PEDERSEN
IPC: E21B47/117 , E21B33/043
CPC classification number: E21B47/117 , E21B33/043
Abstract: An assembly includes two tubular elements, a primary and a secondary seal arranged between the two tubular elements, a seal cavity formed between the two tubular elements and the primary and the secondary seal, and a seal monitoring apparatus having a housing and a position sensor. The housing has a chamber enclosing a separator which divides the chamber into a first and a second sub-chamber. The first sub-chamber is fluidly connected to the seal cavity and is filled with a hydraulic fluid. The separator is movable in a first direction relative to the housing to increase a volume of the first sub-chamber and decrease a volume of the second sub-chamber, and in a second direction to decrease the volume of the first sub-chamber and increase the volume of the second sub-chamber. The position sensor generates an electrical signal which represents a position of the separator relative to the housing.
-
公开(公告)号:US11761291B2
公开(公告)日:2023-09-19
申请号:US16604184
申请日:2018-04-12
Applicant: AKER SOLUTIONS AS
Inventor: Geir Ivar Holberg , Joakim Martens , Kristian Guttulsrud , Jan Herland , Jan Troensdal
IPC: E21B33/124 , E21B33/043 , E21B34/04 , E21B33/035
CPC classification number: E21B33/124 , E21B33/035 , E21B33/043 , E21B34/04
Abstract: A wellhead arrangement includes a valve tree arranged on a wellhead and a seal carrier with at least one seal. The valve tree includes an isolation sleeve. The seal carrier is arranged between the wellhead and the isolation sleeve.
-
公开(公告)号:US11686171B2
公开(公告)日:2023-06-27
申请号:US17874196
申请日:2022-07-26
Applicant: Dril-Quip, Inc.
Inventor: Blake T. DeBerry , Morris B. Wade , Flavio Santos , Gregory Norwood , Robert Buxton , Justin Rye , Todd L. Scaggs
IPC: E21B33/04 , E21B33/043
CPC classification number: E21B33/04 , E21B33/043 , E21B33/0407
Abstract: Systems and methods for landing a tubing hanger in a wellhead and then orienting a tree (or spool, or flowline connection body) relative to the tubing hanger while landing the tree on the wellhead are provided. This alignment is accomplished without the use of either a tubing spool or a BOP stack with an orientation pin. The tubing hanger alignment devices may be used to orientate the tree as the tree is landed so that the couplings and stabs between the tree and the tubing hanger line up with each other just at the moment of landing.
-
公开(公告)号:US20230151710A1
公开(公告)日:2023-05-18
申请号:US18093996
申请日:2023-01-06
Applicant: Baker Hughes Oilfield Operations LLC
Inventor: Noel Monjure , David L. Ford , Stephen Peters , Philip Potter , James Sonnier
IPC: E21B33/043 , E21B33/04
CPC classification number: E21B33/043 , E21B33/0415
Abstract: A downhole tool for transmitting rotation to a casing string includes a tool body having a bore extending from a first end to a second end. The downhole tool also includes a cam positioned within the tool body, the cam being axially translatable along an axis of the bore. The downhole tool further includes a recess, formed in an outer diameter of the cam. The downhole tool includes a locking mechanism, positioned at least partially within the tool body. The locking mechanism includes a tool key. The locking mechanism also includes a biasing member, the biasing member driving the tool key toward the retracted position.
-
公开(公告)号:US20230151709A1
公开(公告)日:2023-05-18
申请号:US18056401
申请日:2022-11-17
Applicant: CONOCOPHILLIPS COMPANY
Inventor: Eivind C. Eike HALVORSEN , Leif KVARME , Rune WOIE
IPC: E21B33/043
CPC classification number: E21B33/043
Abstract: The invention relates to the alignment of a tubing hanger (14) when installed in a subsea wellhead (11). Sensors (39a,b; 40a,b) detect when the orientation is correct and send a signal to the surface to provide positive confirmation of correct orientation, before a XMT (15) is installed on the wellhead (11) and the HP riser (31) removed, etc.
-
-
-
-
-
-
-
-
-