-
公开(公告)号:US20190112772A1
公开(公告)日:2019-04-18
申请号:US16161095
申请日:2018-10-16
CPC分类号: E02B3/106 , E02B7/22 , E06B2009/007
摘要: A wall element for holding back water is formed in one piece and has a planar, rectangular main portion having a first side, a second side parallel to the first side, a third side perpendicular to the first side, and a fourth side parallel to the third side. A first planar bearing portion is connected to the main portion over the first side and perpendicular to the main portion. A second planar bearing portion is connected to the main portion over the second side and perpendicular to the main portion. The second bearing portion is opposite the first bearing portion. The wall element has a planar connecting portion connected to the main portion over the third side and inclined to the main portion. The connecting portion has connecting holes in the longitudinal direction, and the main portion has connecting holes along the longitudinal extent of the fourth side.
-
公开(公告)号:US6132140A
公开(公告)日:2000-10-17
申请号:US11277
申请日:1998-02-10
申请人: Sten Kullberg
发明人: Sten Kullberg
摘要: A water dam includes a number of loading pallets arranged side-by-side and inclined outward from the water supported by supports. Membranes are placed on loading pallets and extend a distance in front of the pallets under the water. The membranes may be held down in the front edge by stones, sand bags, etc. initially to hold the membrane in place. The supports are triangular and made of U-shaped sheet metal beams. The one on which the pallets rest grips over the adjoining legs of two loading pallets to hold these together. To the rear the support is extended sufficient to secure that it cannot be tilted by the water. To achieve this and achieve a good grip on the ground the inclination is preferably 45.degree., resulting in great vertical forces on the ground, a good grip on the ground.
摘要翻译: PCT No.PCT / SE96 / 01002 Sec。 371日期1998年2月10日 102(e)1998年2月10日PCT PCT 1996年8月9日PCT公布。 公开号WO97 / 07290 日期1997年2月27日水坝包括并排排列的多个装载托盘,并从由支撑件支撑的水向外倾斜。 将膜放置在装载托盘上,并在水面下的托盘前延伸一段距离。 最初可以通过石头,沙袋等将膜压在前边缘,以将膜保持在适当的位置。 支撑是三角形的,由U形金属板制成。 托盘搁置在两个装载托盘的相邻腿部上的夹子夹在一起。 在后部,支撑件被延伸到足以确保其不能被水倾斜。 为了达到这个目的,在地面上实现良好的抓地力,倾角最好为45°,导致地面上的垂直力很大,抓地力好。
-
公开(公告)号:US4582451A
公开(公告)日:1986-04-15
申请号:US600499
申请日:1984-04-16
摘要: A floodgate structure is disclosed for closing of an hydraulic flow channel at selected times, as during flooding conditions. A gate panel is normally loosely and slideably received in a recess below grade level. To render the gate operational, it is lifted into a channel-blocking position. Pneumatically inflatable peripheral sealing elements extend from the water side of the panel into sealing contact with a fixed support structure. The opposite side of the panel supports a flexible but noninflatable sealing skirt element, which is pressed into sealing contact with the supporting structure by expansion of the inflatable elements. When thus positioned, the sealing skirt becomes hydrostatically loaded by the pressure of the water and functions as an effective seal in the event of subsequent failure of the pneumatically expandable elements.
摘要翻译: 公开了一种在选择的时间关闭液压流道的闸门结构,如在淹水条件期间。 门板通常松动且可滑动地接收在低于等级的凹槽中。 为了使门可操作,它被提升到通道阻止位置。 气动充气外围密封元件从面板的水侧延伸到与固定支撑结构密封接触。 面板的相对侧支撑柔性但不可充气的密封裙部元件,其通过膨胀可膨胀元件而被挤压成与支撑结构密封接触。 当这样定位时,密封裙部通过水的压力进行流体静力负载,并且在气动可膨胀元件随后发生故障的情况下起到有效密封的作用。
-
公开(公告)号:US20170350082A1
公开(公告)日:2017-12-07
申请号:US15614406
申请日:2017-06-05
申请人: Eigai Hamada
发明人: Eigai Hamada
CPC分类号: E02B3/06 , E02B3/062 , E02B3/104 , E02B3/106 , E02B7/22 , E02B7/40 , E02B7/50 , E06B2009/007 , Y02A10/13
摘要: A movable tsunami buffer dam has a unit configured such that a plurality of separate units, each of which having a shape in which a frame made of a light material is sandwiched by a pair of plates made of a light material, is stacked with said plates disposed in a pile; and a locking member for locking said unit to a ground surface such that said unit can rise up from said ground surface and collapse onto said ground surface. The separate units has a structure in which water from a tsunami can advance into a space formed between said plates by said frame.A required thickness is ensured due to said unit being configured such that said separate units are stacked, and the manufacturing cost is reduced to a greater extent than in the case of a dam configured from a single separate unit of said required thickness, because the big size lumber for obtaining the units is very expensive. The unit is installed in a state of being collapsed on said ground surface at normal times, and when a tsunami arrives, said unit rising up due to the force of the tsunami and the buoyancy of the seawater, resisting the passage of the tsunami and reducing the power of the tsunami.
-
公开(公告)号:US20150292534A1
公开(公告)日:2015-10-15
申请号:US14748436
申请日:2015-06-24
申请人: Tung-Lin Wu
发明人: Tung-Lin Wu
摘要: A packing set includes a stop block and a packing. The stop block is penetrated by and installed with an abutment device and the packing includes a main body and a packing kit. Both ends of the main body extend downward with a protruding part. Each protruding part has a transverse rib stretching outward from the side thereof and the other end of the transverse rib has a vertical rib extending perpendicularly. The main body has a screw for placing the packing kit. The packing kit includes a stud that penetrates the screw. The stud has an operating rod installed in one end and an abutment board installed in the other end. The stop block can be installed in both sides of any water retaining column and is used as a clamp incorporated with the packing for performing the packing action on the gate boards.
摘要翻译: 包装集包括止动块和包装。 止动块穿过并安装有支撑装置,并且包装包括主体和包装工具。 主体两端以突出部分向下延伸。 每个突出部分具有从其侧面向外延伸的横向肋,并且横向肋的另一端具有垂直延伸的垂直肋。 主体有一个用于放置包装工具的螺钉。 包装套件包括穿过螺钉的螺栓。 螺柱具有安装在一端的操作杆和安装在另一端的抵接板。 止动块可以安装在任何保水柱的两侧,并用作与包装件结合的夹具,用于在闸板上进行包装。
-
公开(公告)号:US20140369760A1
公开(公告)日:2014-12-18
申请号:US14305066
申请日:2014-06-16
发明人: Hugh Venton
摘要: A flood barrier includes glass panels (5) held within a metal frame that includes hollow vertical posts (1) having caps (3) designed for removal so that spigots (20) can be fitted in the posts (1) to allow upward extensions (19) to be connected to the metal frame.
摘要翻译: 防洪屏障包括保持在金属框架内的玻璃面板(5),其包括具有设计用于移除的盖子(3)的中空立柱(1),使得插头(20)能够安装在支柱(1)中以允许向上延伸 19)连接到金属框架。
-
公开(公告)号:US08876431B1
公开(公告)日:2014-11-04
申请号:US13780937
申请日:2013-02-28
摘要: A bulkhead system and a method of implementing such a bulkhead system in relation to a dam are disclosed herein. In one example embodiment, such a method includes providing a plurality of bulkhead sections assembled together as a bulkhead assembly, and coupling first and second side assemblies to first and second ends of the bulkhead assembly. Further, the method includes causing a first of the bulkhead sections to receive a respective amount of ballast within an internal cavity therewithin, receiving water pressure at an upstream surface of the bulkhead assembly such that the bulkhead system is forced against the dam and substantially sealed in relation thereto, and operating to counteract the water pressure and thereby prevent or limit the flow of water past the dam, where the operating is performed at least in part by one or more brace members of the side assemblies.
摘要翻译: 本文公开了一种隔壁系统和相对于坝体实施这种隔板系统的方法。 在一个示例性实施例中,这种方法包括提供组装在一起作为隔板组件的多个隔板部分,以及将第一和第二侧组件联接到隔板组件的第一和第二端。 此外,该方法包括使第一隔板部分在其内部的内部空腔内容纳相应数量的压载物,在舱壁组件的上游表面处接收水压,使得隔板系统被迫抵靠水坝并基本上密封在 并且操作以抵消水压,从而防止或限制水流过坝,其中至少部分地由侧组件的一个或多个支撑构件进行操作。
-
公开(公告)号:US20070245653A1
公开(公告)日:2007-10-25
申请号:US11692174
申请日:2007-03-27
IPC分类号: E04B1/00
CPC分类号: E02B3/00 , E02B7/22 , E02B15/08 , E02B15/085
摘要: A concrete beam and a mounting mechanism, which is a part thereof, is a system with which reinforced concrete beams made into the form of a log structure are quickly, flexibly, and tightly mounted together, generating waterproof structures to be used, among others, in dam structures, bulkheads, piers, jetties, bridges. The beams (17) and (18) are fastened onto each other with a joint device (7).
摘要翻译: 作为其一部分的混凝土梁和安装机构是将木材结构形式的钢筋混凝土梁快速,灵活,紧密地安装在一起的系统,产生要使用的防水结构, 在大坝结构,舱壁,码头,码头,桥梁。 梁(17)和(18)用联接装置(7)彼此固定。
-
公开(公告)号:US20170218586A1
公开(公告)日:2017-08-03
申请号:US15485994
申请日:2017-04-12
申请人: Neptune Systems, LLC
摘要: A flood barrier system includes vertical elements and panels extending between such vertical elements, the foregoing components having various features for inhibiting passage of flood water therethrough. One or more vertical elements may have a multi-layer base plate which forms a watertight seal with vertical gaskets disposed on the vertical elements. One of the vertical elements of the system may comprise a stanchion post which may be formed of extruded aluminum. Another vertical element which may find potential use in certain applications may be secured to a store front mullion. The panels in such system may include specially adapted gaskets to reduce instances of leakage. The vertical elements and panels allow the present flood barrier system to be flexible and readily deployable as a barrier to flood or flood risk.
-
公开(公告)号:US20160244929A1
公开(公告)日:2016-08-25
申请号:US15146450
申请日:2016-05-04
申请人: Neptune Systems, LLC
摘要: A flood barrier system includes vertical elements and panels extending between such vertical elements, the foregoing components having various features for inhibiting passage of flood water therethrough. One or more vertical elements may have a multi-layer base plate which forms a watertight seal with vertical gaskets disposed on the vertical elements. One of the vertical elements of the system may comprise a stanchion post which may be formed of extruded aluminum. Another vertical element which may find potential use in certain applications may be secured to a store front mullion. The panels in such system may include specially adapted gaskets to reduce instances of leakage. The vertical elements and panels allow the present flood barrier system to be flexible and readily deployable as a barrier to flood or flood risk.
-
-
-
-
-
-
-
-
-