-
公开(公告)号:US20170227939A1
公开(公告)日:2017-08-10
申请号:US15386513
申请日:2016-12-21
Inventor: MASAHIRO TANIGUCHI , MASAFUMI INOUE , SATOSHI FURUICHI , MASAHIRO KIHARA
IPC: G05B19/042 , G01M1/30
CPC classification number: G05B19/042 , G01M1/30 , G05B19/404 , G05B19/4083 , G05B2219/25068 , G05B2219/32192 , G05B2219/36043 , G05B2219/36069 , G05B2219/36195 , Y02P90/22
Abstract: In a component mounting system having an inspection device performing a mounting inspection after component mounting, a correction value for correcting a mounting program is calculated based on board inspection information including fed-back component position deviation information, a component is mounted on a board in accordance with the mounting program corrected based on the calculated correction value, and a “present value” based on most recent board inspection information and a “pre-correction evaluation value” are displayed together on an evaluation value display screen as evaluation values representing accuracy at a time of the mounting based on the board inspection information during this component mounting work, the “pre-correction evaluation value” being calculated based on a temporary position deviation amount pertaining to a case where it is assumed that no correction based on the calculated correction value has been performed.
-
公开(公告)号:US20180192522A1
公开(公告)日:2018-07-05
申请号:US15848034
申请日:2017-12-20
Inventor: MASAHIRO TANIGUCHI , SATOSHI FURUICHI , MASAHIRO KIHARA , TOSHIHIKO NAGAYA
IPC: H05K3/30
CPC classification number: H05K3/30 , H05K13/0417 , H05K13/083
Abstract: A component mounting system includes a plurality of component supply devices (tape feeders) each of which supplies components from a component supply position and a component mounter that sucks the components from the component supply position of each of the plurality of component supply devices with a plurality of nozzles (suction nozzles) to install the components onto a board. A suction position correction value for correcting a suction position shift from a regular suction position when each of the nozzles sucks the components from the component supply position is calculated. The suction position is corrected based on the suction position correction value to suck the components. A suction position shift amount from the regular suction position is calculated. A feeder evaluation value, which is a sum of the suction position correction value and the suction position shift amount, is calculated for each of the plurality of component supply devices.
-
公开(公告)号:US20200225637A1
公开(公告)日:2020-07-16
申请号:US16833721
申请日:2020-03-30
Inventor: SATOSHI FURUICHI , MASAHIRO KIHARA , TOSHIHIKO NAGAYA , MASAHIRO TANIGUCHI
IPC: G05B19/402 , G05B19/4063
Abstract: A mounting board manufacturing system includes: a component placer including a placing head and a placing head mover that moves the placing head to a target position for placing the component on the board; an inspector that inspects a placement position of the component by imaging the board; a correction value calculator that calculates a correction value for correcting the target position; a target position calculator that calculates the target position using the correction value; and a correction value changer that changes a latest correction value used immediately before stopping an operation of the component placer to a correction value different from the latest correction value when the operation is resumed.
-
公开(公告)号:US20190064765A1
公开(公告)日:2019-02-28
申请号:US16057848
申请日:2018-08-08
Inventor: SATOSHI FURUICHI , MASAHIRO KIHARA , TOSHIHIKO NAGAYA , MASAHIRO TANIGUCHI
IPC: G05B19/402 , G05B19/4063
Abstract: There is provided a mounting board manufacturing system including: a component placer including a placing head having a holding tool that holds a component and places the component on a board, and a placing head mover that moves the placing head to a target position for placing the component held by the holding tool at a component placement position of the board; an inspector that inspects a placement position of the component placed on the board by imaging the board on which the component is placed by the component placer; a correction value calculator that calculates a correction value for correcting the target position using an inspection result, and updates the correction value using a new inspection result when the new inspection result is obtained; a target position calculator that calculates the target position using the correction value; and a correction value changer that changes a latest correction value used immediately before stopping an operation of the component placer to a correction value different from the latest correction value when the operation is resumed after the component placer stops the operation and the component is to be placed by the component placer.
-
-
-