Indoor device, home system, control method, and program

    公开(公告)号:US09928729B2

    公开(公告)日:2018-03-27

    申请号:US14908574

    申请日:2014-08-05

    Abstract: A remote operation receiver (111) is configured to communicate with a communication terminal and receive a remote operation from outside a home. A remote operation monitor (112) is configured to monitor a state of communication with the communication terminal at the remote operation receiver (111) during an operation based on the remote operation. A notifier (114) is configured to provide in the home guidance to urge a user to conduct a manual operation on a manual operation receiver (121) when the remote operation monitor (112) detects that the communication with the communication terminal is discontinued. Then, an indoor device (10) is configured to make a shift to normal operation upon reception of the manual operation within a reference time period. An abnormal remote operation processor (124) is configured to set an extended time period corresponding to an operation state and then make a transition of the indoor device (10) to a safe operation when no manual operation is received even if the reference time period has elapsed.

    Control device, control system, control method and program

    公开(公告)号:US10311666B2

    公开(公告)日:2019-06-04

    申请号:US15548809

    申请日:2015-02-09

    Abstract: A prediction value calculator calculates a prediction value of an electricity fee based on the amount of electric power supplied from a commercial electric power source to electric equipment within an electricity fee calculation period. A selector selects, as a first-stage control, either one control of an electric power saving control for the electric equipment and a charge-discharge control in which the electric power supplied from the commercial electric power source is stored in a storage battery in a first time slot and the electric power stored in the storage battery is supplied to the electric equipment in a second time slot in which the unit cost of the electric power supplied from the commercial electric power source is greater than that in the first time slot. A controller executes the first-stage control selected by the selector when the prediction value calculated by the prediction value calculator is greater than a targeted value of the electricity fee.

Patent Agency Ranking