-
公开(公告)号:US20240193003A1
公开(公告)日:2024-06-13
申请号:US18287892
申请日:2022-04-07
Applicant: Mazda Motor Corporation
Inventor: Masashi OKAMURA , Seiichi ITO , Takashi MAEDA , Tomohiko ADACHI , Masahiro YOSHIOKA , Masato ISHIBASHI , Daisuke HAMANO
IPC: G06F9/50
CPC classification number: G06F9/5072 , G06F9/5027
Abstract: In prediction processing, the controller predicts a temporal change in a calculation capability available in grid computing processing of each of a plurality of arithmetic devices. In selection processing, the controller allows a user to select a job for which the calculation capability of the arithmetic device owned by the user is desired to be provided from jobs introduced by a job list. In the matching processing, on the basis of a result of the prediction processing and a result of the selection processing, the controller allocates an arithmetic device that is available in the grid computing processing and is owned by the user to job data corresponding to the job selected by the user in the selection processing among the plurality of jobs.
-
公开(公告)号:US20240345889A1
公开(公告)日:2024-10-17
申请号:US18684848
申请日:2022-08-23
Applicant: MAZDA MOTOR CORPORATION
Inventor: Seiichi ITO , Masashi OKAMURA , Takashi MAEDA , Yuji FURUKAWA
IPC: G06F9/50
CPC classification number: G06F9/5038
Abstract: A management device used in a grid computing system is configured to execute compensation calculation processing of calculating a first compensation and a second compensation with respect to execution of a computational job by a computing device of a user, and stores evaluation values each set for a respective one of a plurality of computational jobs, wherein the compensation calculation processing includes: a first processing of calculating a first compensation value of the first compensation according to a computational amount of computational processing; and second processing of calculating and storing a second compensation value of the second compensation according to a relevant one of the evaluation values, wherein management device is configured to, in the first processing, calculate the first compensation value to have a larger value, as a cumulative value of the second compensation values which have been previously stored has a larger value.
-
公开(公告)号:US20240202045A1
公开(公告)日:2024-06-20
申请号:US18287906
申请日:2022-04-05
Applicant: Mazda Motor Corporation
Inventor: Masashi OKAMURA , Seiichi ITO , Takashi MAEDA , Tomohiko ADACHI , Masahiro YOSHIOKA , Masato ISHIBASHI , Daisuke HAMANO
CPC classification number: G06F9/5072 , G06F9/5044 , G08G1/20
Abstract: A calculation capability of grid computing using a calculation resource mounted on a moving body is promptly provided to a client. A management server configures a candidate of a moving body group forming a grid for executing grid computing as a grid candidate with reference to resource information and moving body information stored in a memory. The calculation resource information including a temporal change in a calculation capability is estimated for the configured grid candidate with reference to the resource information and the moving body information, and the estimated calculation resource information is stored in the memory together with data specifying a moving body configuring the grid candidate.
-
公开(公告)号:US20240193004A1
公开(公告)日:2024-06-13
申请号:US18287914
申请日:2022-04-07
Applicant: Mazda Motor Corporation
Inventor: Masashi OKAMURA , Seiichi ITO , Takashi MAEDA , Tomohiko ADACHI , Masahiro YOSHIOKA , Masato ISHIBASHI , Daisuke HAMANO
IPC: G06F9/50
CPC classification number: G06F9/5072 , G06F9/5027
Abstract: In job acceptance processing, a controller accepts job data requested for calculation by a client. In prediction processing, the controller predicts a temporal change in a calculation capability available in grid computing processing of each of a plurality of arithmetic devices. In matching processing, the controller allocates an arithmetic device that is available to the job data accepted in the job acceptance processing on the basis of a result of the prediction processing.
-
公开(公告)号:US20240354165A1
公开(公告)日:2024-10-24
申请号:US18684857
申请日:2022-08-02
Applicant: MAZDA MOTOR CORPORATION
Inventor: Seiichi ITO , Masashi OKAMURA , Takashi MAEDA , Yuji FURUKAWA
IPC: G06F9/50
CPC classification number: G06F9/505
Abstract: Grid computing processing is managed considering rate of amount of renewable energy-derived electric power in amount of electric power used for computation by computing device of vehicles, thereby contributing to utilization of renewable energy. Management server manages grid computing processing of causing computing devices mounted on a plurality of vehicles to process job data provided from client server. Controller of the management server acquires overall renewable energy rate information indicative of the rate of the amount of renewable energy-derived electric power in the amount of electric power consumption used for computation of the job data by all computing devices assigned to the job data, based on the amount of computations for a part of the job data to be processed by each of the computing devices and renewable energy rate information of each of the computing devices, and transmits the overall renewable energy rate information to the client server.
-
公开(公告)号:US20220097724A1
公开(公告)日:2022-03-31
申请号:US17478967
申请日:2021-09-20
Applicant: Mazda Motor Corporation
Inventor: Seiichi ITO , Masashi OKAMURA , Takashi MAEDA
Abstract: An information processing apparatus for, in an environment including a plurality of vehicles of a plurality of users and a plurality of portable terminals of the plurality of users, associating the plurality of users based on position signals received from the plurality of vehicles and the plurality of portable terminals. In a first mode of operation the information processing apparatus allows for greetings to be exchanged between users when the vehicles are in a driving state. In another mode of operation, a list of users is exchanged between users when the vehicles are in a non-driving state.
-
公开(公告)号:US20240354167A1
公开(公告)日:2024-10-24
申请号:US18684853
申请日:2022-08-23
Applicant: MAZDA MOTOR CORPORATION
Inventor: Seiichi ITO , Masashi OKAMURA , Takashi MAEDA
CPC classification number: G06F9/5072 , G06F9/5027 , G06Q20/065 , H04W4/44 , G06F2209/508
Abstract: A management device is used in a grid computing system, wherein a computational job constitutes a part of a project to be implemented by a client. The management device is configured to: store the content of the project, and a compensation rate set for the computational job of the project; acquire a computational amount of computational processing executed for the computational job by a computing device; calculate a first compensation value of a first compensation to be given to the user, according to the computational amount by the computing device; and acquire the degree of progress of the project, and when it is determined, based on the acquired degree of progress, that the project has been completed, calculate a second compensation value of a second compensation to be given to the user, according to the compensation rate.
-
公开(公告)号:US20220099451A1
公开(公告)日:2022-03-31
申请号:US17478970
申请日:2021-09-20
Applicant: Mazda Motor Corporation
Inventor: Seiichi ITO , Masashi OKAMURA , Takashi MAEDA , Yuji FURUKAWA
Abstract: A management apparatus as a traveling route setting apparatus acquires, during moving in a vehicle, position information about the vehicle, driver's driving state information, and feeling state related information relating to a feeling state of the driver or a passenger; sets an α evaluation value obtained by evaluating each of a spot and a section in map data from the viewpoint of an influence of a factor other than human interaction on an experience, and a β evaluation value obtained by evaluating each of the spot and the section from the viewpoint of an influence of human interaction on an experience, based on the position information, the driving state information, and the feeling state related information which are acquired from a plurality of the vehicles 1; and sets a proposed traveling route based on the α and β evaluation values set for at least the spot and section.
-
公开(公告)号:US20240241765A1
公开(公告)日:2024-07-18
申请号:US18288187
申请日:2022-04-07
Applicant: Mazda Motor Corporation
Inventor: Masashi OKAMURA , Seiichi ITO , Takashi MAEDA , Tomohiko ADACHI , Masahiro YOSHIOKA , Masato ISHIBASHI , Daisuke HAMANO
IPC: G06F9/50
CPC classification number: G06F9/5072 , G06F9/5027
Abstract: In prediction processing, the controller predicts a temporal change in a calculation capability available in grid computing processing of each of a plurality of arithmetic devices. In the request processing, in a case where the calculation capability of the arithmetic device predicted to be available in the grid computing processing on the basis of a result of the prediction processing is insufficient, the controller presents, to a user who owns another arithmetic device except for the arithmetic device predicted to be available in the grid computing processing among the plurality of arithmetic devices, request information for prompting provision of the calculation capability of the another arithmetic device to the grid computing processing.
-
公开(公告)号:US20240211317A1
公开(公告)日:2024-06-27
申请号:US18288186
申请日:2022-04-11
Applicant: Mazda Motor Corporation
Inventor: Masashi OKAMURA , Seiichi ITO , Takashi MAEDA , Tomohiko ADACHI , Masahiro YOSHIOKA , Masato ISHIBASHI , Daisuke HAMANO
IPC: G06F9/50
CPC classification number: G06F9/5072 , G06F2209/5019
Abstract: A management system includes a controller, and a memory unit that stores resource information related to a calculation resource mounted on each moving body and operation history information of each moving body. A controller performs extraction processing of referring to the resource information and the operation history information and extracting a target moving body for reinforcement of a calculation resource, guidance processing of transmitting guidance on the reinforcement of the calculation resource to an owner of the target moving body, and update processing of updating the resource information on the basis of update information when the update information is acquired.
-
-
-
-
-
-
-
-
-