OPPORTUNISTIC 40 MHZ MODE OF TRANSMISSION IN WIRELESS TRANSMITTERS
    3.
    发明申请
    OPPORTUNISTIC 40 MHZ MODE OF TRANSMISSION IN WIRELESS TRANSMITTERS 审中-公开
    机载40MHZ无线发射机传输模式

    公开(公告)号:US20130242928A1

    公开(公告)日:2013-09-19

    申请号:US13891784

    申请日:2013-05-10

    CPC classification number: H04W72/04 H04W74/0808

    Abstract: A system including a physical layer module and a control module. The physical layer module is configured to generate a first clear channel assessment for a first sub-channel of a communication channel and generate a second clear channel assessment for a second sub-channel of the communication channel. The first clear channel assessment indicates whether the first sub-channel is free or busy. The second clear channel assessment indicates whether the second sub-channel is free or busy. The control module is configured to, in response to the second sub-channel being busy, extend a duration of the second clear channel assessment by a predetermined period of time, and transmit data via (i) only the first sub-channel or (ii) both the first sub-channel and the second sub-channel based on (a) the first clear channel assessment, (b) the second clear channel assessment, and (c) the extended duration of the first clear channel assessment.

    Abstract translation: 一种包括物理层模块和控制模块的系统。 物理层模块被配置为对通信信道的第一子信道生成第一清除信道评估,并且生成用于通信信道的第二子信道的第二清除信道评估。 第一个清除频道评估表明第一个子频道是空闲还是忙碌。 第二个清除频道评估表明第二个子频道是空闲还是忙碌。 控制模块被配置为响应于第二子信道忙,将第二清除信道评估的持续时间延长预定时间段,并且经由(i)仅传送第一子信道或(ii) )基于(a)第一清除信道评估,(b)第二清除信道评估和(c)第一清除信道评估的延长持续时间,第一子信道和第二子信道两者。

    Opportunistic 40 MHz mode of transmission in wireless transmitters
    4.
    发明授权
    Opportunistic 40 MHz mode of transmission in wireless transmitters 有权
    机会性40 MHz无线发射机的传输模式

    公开(公告)号:US09014207B2

    公开(公告)日:2015-04-21

    申请号:US13891784

    申请日:2013-05-10

    CPC classification number: H04W72/04 H04W74/0808

    Abstract: A system including a physical layer module and a control module. The physical layer module is configured to generate a first clear channel assessment for a first sub-channel of a communication channel and generate a second clear channel assessment for a second sub-channel of the communication channel. The first clear channel assessment indicates whether the first sub-channel is free or busy. The second clear channel assessment indicates whether the second sub-channel is free or busy. The control module is configured to, in response to the second sub-channel being busy, extend a duration of the second clear channel assessment by a predetermined period of time, and transmit data via (i) only the first sub-channel or (ii) both the first sub-channel and the second sub-channel based on (a) the first clear channel assessment, (b) the second clear channel assessment, and (c) the extended duration of the first clear channel assessment.

    Abstract translation: 一种包括物理层模块和控制模块的系统。 物理层模块被配置为对通信信道的第一子信道生成第一清除信道评估,并且生成用于通信信道的第二子信道的第二清除信道评估。 第一个清除频道评估表明第一个子频道是空闲还是忙碌。 第二个清除频道评估表明第二个子频道是空闲还是忙碌。 控制模块被配置为响应于第二子信道忙,将第二清除信道评估的持续时间延长预定时间段,并且经由(i)仅传送第一子信道或(ii) )基于(a)第一清除信道评估,(b)第二清除信道评估和(c)第一清除信道评估的延长持续时间,第一子信道和第二子信道两者。

Patent Agency Ranking