A hydrometallurgical plant for nickel laterite ore extraction having a plurality of treatment facility lines wherein the plant is capable of minimizing a decrease in throughput when line failure occurs and efficiently restoring normal operation status Each line of the treatment facility includes a pretreatment step, a leaching step, a solid-liquid separation step, a neutralization step, a zinc removal step, a sulfurization step and a detoxification step. The lines are coupled by pipelines, each having a valve, installed after the solid-liquid separation step for sending a liquid from the solid-liquid separation step to the neutralization step in each line and/or after the sulfurization step for sending a liquid from the sulfurization step to the detoxification step in each line.
摘要:
The hydrometallurgical process for a nickel oxide ore comprising a step (1) for obtaining an aqueous solution of crude nickel sulfate by High Pressure Acid Leach of a nickel oxide ore; a step (2) for obtaining a zinc free final solution formed; a step (3) for obtaining a waste solution; and a step (4) for scrubbing a hydrogen sulfide gas in exhaust gas, wherein utilization efficiency of hydrogen sulfide gas is enhanced while maintaining nickel recovery rate.It is characterized in that at least one kind of the following operations (a) to (d) is adopted. (a) to adjust total volume (m3) of the sulfurization reactor (B) in the above step (3), at a ratio of 0.2 to 0.9, relative to input mass (kg/h) of nickel to be introduced; (b) to evaporate, under negative pressure, slurry in the above step (3), and to add hydrogen sulfide gas recovered to the above step (3); (c) to reuse exhaust gas from the sulfurization reactor in the above step (3), and add it to the step (2); and (d) to subject the waste solution in the above step (3) and exhaust gas in the above step (4) to countercurrent contact, then to introduce the exhaust gas to the scrubber again and to charge waste solution from the scrubber into the sulfurization reactor in the step (3).
摘要:
Provided is a method for producing ferronickel from a nickel sulfide or a mixed sulfide containing nickel and cobalt, obtained by hydrometallurgy of nickel oxide ore or obtained from scraps or products in process. The method for producing a ferronickel raw material is to form the ferronickel raw material from a nickel sulfide or a mixed sulfide containing nickel sulfide and cobalt sulfide, wherein treatments are performed through the following steps: (1) redissolution step, (2) deferrization step, (3) solvent extraction step, (4) hydroxylation step, (5) roasting step, and (6) washing and calcining step.
摘要:
A hydrometallurgical process for a nickel oxide ore comprising obtaining an aqueous solution of crude nickel sulfate by high pressure acid leaching of a nickel oxide ore; obtaining a zinc free final solution by sulfurization of the solution; obtaining a waste solution; and scrubbing hydrogen sulfide gas from an exhaust gas. The process is characterized by at least one of the following operations: Adjusting the total volume (m3) of a sulfurization reactor to a ratio of 0.2-0.9 (m3/kg/h) relative to the input mass (kg/h) of the nickel to be introduced to the reactor; and/or subjecting the waste solution and the exhaust gas to countercurrent contact, then introducing the exhaust gas back to the scrubber and charging the waste solution from the scrubber into the sulfurization reactor.
摘要:
Provided is a method for producing ferronickel from a nickel sulfide or a mixed sulfide containing nickel and cobalt, obtained by hydrometallurgy of nickel oxide ore or obtained from scraps or products in process. The method for producing a ferronickel raw material is to form the ferronickel raw material from a nickel sulfide or a mixed sulfide containing nickel sulfide and cobalt sulfide, wherein treatments are performed through the following steps: (1) redissolution step, (2) deferrization step, (3) solvent extraction step, (4) hydroxylation step, (5) roasting step, and (6) washing and calcining step.
摘要:
The separation method for zinc sulfide, in the hydrometallurgical process by a High Pressure Acid Leach for nickel oxide ore comprising leaching and solid/liquid separation step, neutralization step, zinc removal step, and nickel recovery step, which can inhibit clogging of a filter cloth and reduce a frequency of washing operation and replacement operation of a filter cloth by improving filtration performance of zinc sulfide, and inhibit decrease of nickel recovery ratio, in the zinc removal step in which zinc sulfide is formed by adding a sulfurizing agent to the neutralization final liquid containing zinc as well as nickel and cobalt and zinc sulfide is separated to obtain a mother liquid for nickel recovery containing nickel and cobalt.The separation method for zinc sulfide of the present invention is characterized in that in the above-described neutralization step, the leach residue is added to the leach liquor, and pH of the neutralization final liquid is adjusted so as to fall to the range from 3.0 to 3.5, and in the zinc removal step, the suspended solid comprising the neutralized precipitate and the leaching reside are kept remained in said neutralization final liquid so that turbidity thereof falls in the range from 100 to 400 NTU.
摘要:
The hydrometallurgical Process for a nickel oxide ore, which is capable of preventing inevitable operation shutdown of a leaching step and maintaining high operation efficiency as a whole process, in a trouble of the steps other than the leaching step, in a hydrometallurgical Process for a nickel oxide ore using a High Pressure Acid Leach.It is characterized in that, the hydrometallurgical Process for a nickel oxide ore using a High Pressure Acid Leach equipment equipped with the following means (a) to (c), in a trouble of the steps other than the above leaching step, the leached slurry discharged from the means (c), which is used in the above High Pressure Acid Leach equipment, is subjected to self-circulation inside the High Pressure Acid Leach equipment, by transferring to the means (a), which is used in the above High Pressure Acid Leach equipment, as well as by shutdown of receiving the ore slurry and the addition of sulfuric acid, in the above leaching step: means (a) to preliminarily increase temperature and pressure of the ore slurry; means (b) to form the leached slurry, by the addition of sulfuric acid to the ore slurry with preliminarily increased temperature and pressure, and leaching under blow of high-pressure steam and high-pressure air; means (c) to eliminate a pressurized state of the leached slurry formed.
摘要:
In a hydrometallurgical plant of a nickel laterite ore having a plurality of lines of treatment facilities, the hydrometallurgical plant of the nickel laterite ore which is, even when a serious trouble will occur in said treatment facilities, capable of minimizing decrease in throughput caused by this, and restoring a normal operation state early, after eliminating the serious trouble, and an operation method thereof.A hydrometallurgical plant of a nickel laterite ore having a plurality of lines, as treatment facilities including a pretreatment step, a leaching step, a solid-liquid separation step, a neutralization step, a zinc removal step, a sulfurization step and a detoxification step as one line, wherein a coupling pipeline having a valve is installed between a liquid sending pipeline from the solid-liquid separation step to the neutralization step in each line and/or between a liquid sending pipeline from the sulfurization step to the detoxification step in each line.
摘要:
The separation method for zinc sulfide, in the hydrometallurgical process by a High Pressure Acid Leach for nickel oxide ore comprising leaching and solid/liquid separation step, neutralization step, zinc removal step, and nickel recovery step, which can inhibit clogging of a filter cloth and reduce a frequency of washing operation and replacement operation of a filter cloth by improving filtration performance of zinc sulfide, and inhibit decrease of nickel recovery ratio, in the zinc removal step in which zinc sulfide is formed by adding a sulfurizing agent to the neutralization final liquid containing zinc as well as nickel and cobalt and zinc sulfide is separated to obtain a mother liquid for nickel recovery containing nickel and cobalt.The separation method for zinc sulfide of the present invention is characterized in that in the above-described neutralization step, the leach residue is added to the leach liquor, and pH of the neutralization final liquid is adjusted so as to fall to the range from 3.0 to 3.5, and in the zinc removal step, the suspended solid comprising the neutralized precipitate and the leaching reside are kept remained in said neutralization final liquid so that turbidity thereof falls in the range from 100 to 400 NTU.
摘要:
A method of solvent extraction of a nickel sulfate solution uses a multi-stage, counter-current, organic solvent extraction system composed of at least two extractors connected in series, and includes a first extraction step of feeding a crude nickel sulfate solution that contains sodium and ammonium impurities into a second-stage extractor, wherein it is treated in countercurrent flow and at a pH of 6.5 to 7.0 with an organic extractant fed into the second-stage extractor from the first-stage extractor, to thereby extract some of nickel in the crude nickel sulfate solution into the organic extractant; and a second extraction step of transferring the nickel-containing, organic phase to an organic phase-scrubbing step to remove sodium and ammonium, while transferring the nickel sulfate solution, from the first extraction step and from which some of nickel has been removed, to the first-stage extractor, wherein it is treated in countercurrent flow and at a pH of 5.5 to 6.5 with a fresh organic extractant, to thereby extend the remaining nickel in the nickel sulfate solution into the organic extractant. The nickel-containing organic phase from the second extraction step is divided into two portions, one portion being fed into the second-stage extractor while the other portion is transferred to a by-pass, organic phase-scrubbing step it to remove sodium and ammonium.