-
公开(公告)号:US10234510B2
公开(公告)日:2019-03-19
申请号:US15538205
申请日:2015-12-22
发明人: Geon Ho An , In Sun Choi , Dong Jun Won , Jin Young Choi , Sang Ji Lee
摘要: The present invention relates to a state of charge (SOC) management system of an energy storage device, the system comprising at least one energy storage device, wherein the SOC management system of the energy storage device manages SOC of the energy storage device by performing P-f (active power-frequency) droop control on the basis of a droop coefficient, a reference frequency, and a dead band, which determine the output of each energy storage device.
-
公开(公告)号:US11322950B2
公开(公告)日:2022-05-03
申请号:US16467079
申请日:2017-12-06
发明人: Sang Hui Park , Geon Ho An
摘要: A method of operating an ESS with optimal efficiency includes: collecting charge/discharge efficiency data of a PCS; collecting charge/discharge efficiency data of a battery depending on current state of charge of the battery; creating charge/discharge efficiency data of a unit BESS including the PCS and the battery by using the collected data; determining optimal charge/discharge levels of at least two unit-BESSs included in the ESS by using charge/discharge efficiency data of the at least two unit-BESSs to satisfy commanded input/output power values of the whole ESS at a current point of time; and charging or discharging the at least two unit-BESSs depending on the determined optimal charge/discharge power values.
-
公开(公告)号:US10411470B2
公开(公告)日:2019-09-10
申请号:US15738568
申请日:2016-06-23
发明人: Geon Ho An , In Sun Choi , Myong Hoe Kim , Dong Jun Won , Jin Young Choi , Jin Sun Yang
摘要: A large capacity battery system for managing a large capacity battery used for power system frequency regulation and a large capacity battery operation method are provided. The method may include the steps of: calculating an estimated frequency regulation signal for the next day using history information of past frequency regulation signals; calculating a bidding capacity and a basic value for the large capacity battery, matched to the estimated frequency regulation signal; and determining an operation plan using the calculated bidding capacity and basic value; bidding the bidding capacity and basic value for the large capacity battery according to the operation plan on the day-ahead frequency regulation market.
-
4.
公开(公告)号:US10199988B2
公开(公告)日:2019-02-05
申请号:US15538642
申请日:2015-12-22
发明人: Geon Ho An , In Sun Choi , Dong Jun Won , Jin Young Choi , Jin Sun Yang
摘要: The present invention relates to a power management system (PMS) for multiple energy storage systems (ESS) that is for integrated management of the system having multiple ESS for controlling a frequency and having a hierarchical control structure. The PMS for ESS comprises: a plurality of ESS; a local management system (LMS) for managing one or more ESS of the plurality of ESS for each local unit; an ESS Controller (ESSC) for general management of the LMS, judging a state of the LMS and determining an output value of one or more ESS in the LMS, and transmitting the determined output value to the respective ESS; and a PMS for general management of the entire system comprising the plurality of ESS, the LMS and the ESSC, judging the state of the entire system and participating in a power grid frequency control market through a grid operator contract, controlling the output of the LMS, and adjusting a control parameter for output control.
-
-
-