Abstract:
In one aspect, a method for assessing the performance impact of wind turbine upgrades may generally include determining a baseline power curve for a wind turbine prior to the wind turbine being upgraded and determining a baseline wind speed transfer function for the wind turbine prior to the wind turbine being upgraded. The method may also include determining an upgraded wind speed transfer function for the wind turbine after the wind turbine is upgraded. In addition, the method may include determining a corrected local wind speed for the wind turbine based on the baseline and upgraded wind speed transfer functions and determining an upgraded power curve for the wind turbine based on the corrected local wind speed.
Abstract:
The present disclosure is directed to a system and method for protecting a rotary machine in a high noise environment. In one embodiment, the method includes a step of measuring a vibration signal during operation of the rotary machine. Another step includes modulating the vibration signal at a desired frequency to generate a modulated signal having a direct current (DC) value. The desired frequency varies as a function of an operational parameter of the rotary machine. The method also includes a step of filtering the modulated signal via one or more low-pass filters. Another step includes comparing an amplitude of the filtered signal to a threshold amplitude for one or more components of the rotary machine. The threshold amplitude is indicative of an imbalance within one or more components of the rotary machine. The rotary machine is then operated based on the comparison so as to protect the rotary machine from damage caused by the imbalance within the one or more components of the rotary machine.
Abstract:
A method for scheduling software updates for industrial assets may generally include receiving, with a computing device, an indication that a software update is available for an industrial asset, accessing, with the computing device, forecasted operating data for the industrial asset, determining, with the computing device, a suggested time for installing the software update based on the forecasted operating data and providing, with the computing device, a notification indicating the availability of the software update and the suggested time for installing the software update.
Abstract:
A method for starting-up a wind turbine having a rotor with at least one rotor blade is provided. The method includes rotating the at least one rotor blade towards a main operating position using a pitch drive system including a pitch bearing supporting the at least one rotor blade, and a pitch-driving pinion meshing with the pitch bearing; and activating a pump to feed a lubricant to a lubrication pinion meshing with one of the pitch bearing and the pitch-driving pinion before the at least one rotor blade reaches the main operating position so that the lubricant is mainly transferred to a load portion of the pitch bearing and/or a load portion of the pitch-driving pinion. Further, a control assembly for use with the wind turbine is provided.
Abstract:
In one aspect, a method for assessing the performance impact of wind turbine upgrades may generally include determining a baseline power curve for a wind turbine prior to the wind turbine being upgraded and determining a baseline wind speed transfer function for the wind turbine prior to the wind turbine being upgraded. The method may also include determining an upgraded wind speed transfer function for the wind turbine after the wind turbine is upgraded. In addition, the method may include determining a corrected local wind speed for the wind turbine based on the baseline and upgraded wind speed transfer functions and determining an upgraded power curve for the wind turbine based on the corrected local wind speed.
Abstract:
The present disclosure is directed to a system and method for protecting a rotary machine in a high noise environment. In one embodiment, the method includes a step of measuring a vibration signal during operation of the rotary machine. Another step includes modulating the vibration signal at a desired frequency to generate a modulated signal having a direct current (DC) value. The desired frequency varies as a function of an operational parameter of the rotary machine. The method also includes a step of filtering the modulated signal via one or more low-pass filters. Another step includes comparing an amplitude of the filtered signal to a threshold amplitude for one or more components of the rotary machine. The threshold amplitude is indicative of an imbalance within one or more components of the rotary machine. The rotary machine is then operated based on the comparison so as to protect the rotary machine from damage caused by the imbalance within the one or more components of the rotary machine.
Abstract:
A method for starting-up a wind turbine having a rotor with at least one rotor blade is provided. The method includes rotating the at least one rotor blade towards a main operating position using a pitch drive system including a pitch bearing supporting the at least one rotor blade, and a pitch-driving pinion meshing with the pitch bearing; and activating a pump to feed a lubricant to a lubrication pinion meshing with one of the pitch bearing and the pitch-driving pinion before the at least one rotor blade reaches the main operating position so that the lubricant is mainly transferred to a load portion of the pitch bearing and/or a load portion of the pitch-driving pinion. Further, a control assembly for use with the wind turbine is provided.