Bridge deck panel support system and method
    21.
    发明授权
    Bridge deck panel support system and method 失效
    桥面板支撑系统及方法

    公开(公告)号:US5025522A

    公开(公告)日:1991-06-25

    申请号:US470872

    申请日:1990-01-25

    IPC分类号: E01D19/12

    CPC分类号: E01D19/125 E01D2101/268

    摘要: A bridge deck panel support system and method for supporting precast bridge deck panels on a bridge girder. The bridge deck panel support system (10) comprises at least one grade bar support member (24) which is anchored to the bridge girder (14) with a grade bar support anchor (16) so as to extend upwardly from the bridge girder (14). At least one grade bar (28) for supporting one or more deck panels (12) is secured to the upper portion (26) of the grade bar support member (24), the grade bar (28) being selectively spaced from the girder (14) such that a grout receiving space (32) is defined between the grade bar (28) and the girder (14). The grout receiving space (32) is filed with non-shrink grout (34) such that the load of the deck panels (12) is transferred from the grade bar (28) to the grout (34). The method of the present invention includes the steps of securing the grade bar support member (24) to the girder (14), securing the grade bar (28) to the grade bar support member (24), and substantially filling the grout receiving space (32) with non-shrink grout (34).

    摘要翻译: 在桥梁上支撑预制桥面板的桥面板支撑系统和方法。 桥面板支撑系统(10)包括至少一个坡度条支撑构件(24),该等级杆支撑构件(24)用等级杆支撑锚固件(16)锚固到桥梁(14),以便从桥梁(14)向上延伸 )。 用于支撑一个或多个甲板板(12)的至少一个钢筋(28)固定到钢筋支撑构件(24)的上部(26)上,等级钢筋(28)与梁( 14),使得在坡度条(28)和梁(14)之间限定了浆料接收空间(32)。 灌浆接收空间(32)与非收缩灌浆(34)一起提供,使得甲板板(12)的载荷从等级棒(28)转移到灌浆(34)。 本发明的方法包括以下步骤:将分级棒支撑构件(24)固定到梁(14)上,将分级杆(28)固定到分级杆支撑构件(24)上,并基本上填充灌浆接收空间 (32)与非收缩灌浆(34)。

    Method of replacing a roadway
    22.
    发明授权
    Method of replacing a roadway 失效
    更换道路的方法

    公开(公告)号:US4145153A

    公开(公告)日:1979-03-20

    申请号:US888959

    申请日:1978-03-22

    IPC分类号: E01D19/12 E01D22/00 E01C21/00

    摘要: A method of replacing an existing roadway on structure in which at least one of the lanes of the roadway is cut into rectilinear sections during a first nonpeak traffic period. The sections are left in place, and temporary traffic bearing members are positioned over the cuts to permit the flow of traffic over all of the lanes of the roadway during an ensuing peak traffic period. Orthotropic roadway modules are preformed and paved at a factory or other remote location, and each of these modules has a width equal to that of the one lane. During a second nonpeak traffic period one or more of the modules is transported to the site, the traffic bearing members and the rectilinear sections are removed and the module is connected in place. The foregoing steps are repeated during successive traffic periods until the entire roadway has been replaced.

    摘要翻译: 在第一非峰值交通周期期间,将道路中至少一条道路的现有道路替换为直线段的方法。 这些部分留在原地,临时交通工具成员位于切割之上,以便在随后的高峰时段期间允许在道路的所有车道上流动。 正交各向异性巷道模块在工厂或其他远程位置进行预制和铺设,并且这些模块中的每一个都具有与一个通道相同的宽度。 在第二个非峰值运行期间,一个或多个模块被运送到现场,交通轴承部件和直线部分被移除,并且模块连接到位。 在连续的交通周期期间重复上述步骤,直到整个道路已被更换。

    Nonwelded metal grating
    23.
    发明授权
    Nonwelded metal grating 失效
    非焊接金属光栅

    公开(公告)号:US4102102A

    公开(公告)日:1978-07-25

    申请号:US816027

    申请日:1977-07-15

    IPC分类号: E01D19/12 E04B5/18

    CPC分类号: E01D19/125 E01D2101/268

    摘要: Each one of a plurality of parallel horizontal beams has longitudinally spaced vertical slots extending transversely through it, with the lower wall of each slot formed by the top of the free end portion of a tongue struck out of the beam. Resting on these tongues are parallel cross bars that extend through the slots and have notches extending downwardly from the tops of the bars receiving the portions of the beams above the slots, with those portions substantially engaging the bottoms of the notches. The height of the tongues is great enough to permit the bars during assembly to be inserted in the slots while the tongues are bent laterally out of the beams, whereupon the bars can be raised in the slots and the tongues bent back beneath the bars to support them.

    摘要翻译: 多个平行水平梁中的每一个具有横向延伸穿过其的纵向间隔的垂直狭槽,每个槽的下壁由舌头的自由端部的顶部形成为从梁的外侧突出。 这些舌片上的平行横杆延伸穿过狭槽,并且具有从容纳在槽上方的梁的部分的杆的顶部向下延伸的凹口,这些部分基本上接合凹口的底部。 舌片的高度足够大,以允许组装期间的杆被插入槽中,同时舌片横向地从梁中弯出,由此杆可以在槽中升高,并且舌片在杆之下弯曲以支撑 他们。

    Concrete structural member
    24.
    发明授权
    Concrete structural member 失效
    混凝土结构会员

    公开(公告)号:US3808085A

    公开(公告)日:1974-04-30

    申请号:US19781671

    申请日:1971-11-11

    发明人: GIVENS B

    摘要: A load-bearing reinforced-concrete structural member, such as a beam or bridge-deck slab, composed of concrete and including both upper and lower stress-reinforcing means with its lower stressreinforcing means being reinforcing metal bars embedded in concrete and its upper stress-reinforcing means being the uppermost 20 to 45 percent of the member and of a fibrousconcrete material consisting essentially of closely spaced short wires uniformly distributed randomly in concrete at an average spacing therebetween of less than 0.3 inch.

    摘要翻译: 由混凝土构成的承重钢筋混凝土结构构件,例如梁或桥面板,包括上部和下部应力增强装置,其下部应力增强装置是嵌入在混凝土中的加强金属杆及其上部 应力增强装置是构件的最上面的20%至45%,以及基本上由紧密间隔的短丝构成的纤维混凝土材料,其均匀分布在混凝土中,平均间隔小于0.3英寸。

    COMPOSITE DECK STRUCTURE FOR BRIDGE AND BRIDGE STRUCTURE AND CONSTRUCTION METHOD THEREOF

    公开(公告)号:US20230287640A1

    公开(公告)日:2023-09-14

    申请号:US18319713

    申请日:2023-05-18

    申请人: HUNAN UNIVERSITY

    摘要: Disclosed are a composite deck structure for a bridge, and a bridge structure and a construction method thereof. The composite deck structure includes a top plate (1), longitudinal ribs (2), and transverse ribs (3), where the longitudinal ribs (2) are fixedly connected to the transverse ribs (3), and are connected to the diaphragms (4) by means of the transverse ribs (3), and the transverse ribs (3) are not provided with cutouts for accommodating the longitudinal ribs (2). According to the composite deck structure, no cutout is provided on the diaphragms (4), and stress generated by the cutouts is reduced; hot-rolled section steel is used for longitudinal ribs (2) and transverse ribs (3) instead of welded steel plates, such that welding seams are reduced and fatigue resistance of the composite deck structure is improved.

    Deck
    30.
    发明申请
    Deck 审中-公开
    甲板

    公开(公告)号:US20150292168A1

    公开(公告)日:2015-10-15

    申请号:US14679336

    申请日:2015-04-06

    申请人: Guido FURLANETTO

    发明人: Guido FURLANETTO

    IPC分类号: E01D6/00 E01D19/00 E01D2/00

    摘要: Provided is a deck, configured for supporting a carriageable surface, including first structural girders defining a support surface for the carriageable surface; at least one second structural girder configured to position itself on the opposite side to said carriageable surface in relation to the first structural girders; diagonal girders integrally connecting the first and said second structural girders to each other, defining, for the deck, a truss; said first and said second structural girders include a core in concrete material: and an external reinforcement partially cladding the core and made of metallic material.

    摘要翻译: 提供一种甲板,其构造成用于支撑可运送的表面,包括限定用于可运送表面的支撑表面的第一结构梁; 至少一个第二结构梁被构造成相对于第一结构梁将其自身定位在与所述可移动表面相对的一侧上; 对角梁将第一和第二结构梁彼此一体地连接,为甲板限定桁架; 所述第一和所述第二结构梁包括混凝土材料芯体和外部加强件,部分地包覆所述芯部并由金属材料制成。