A processing train configured to run along a tunnel to lay a solidifiable fluid material on a wall of the tunnel and allow the solidifiable fluid material to solidify for construction of a lining of the tunnel, an advancement system for advancing the sliding form, a closing edge for closing a space between a front edge of the sliding form and the wall of the tunnel, and spouts for dispensing the solidifiable fluid material around a front segment of the sliding form. A method for constructing a lining of a tunnel with the solidifiable fluid material involves, defining an interspace between the front segment of the sliding form and the wall of the tunnel, introducing the solidifiable fluid material into the interspace and, after hardening time, advancing the sliding form to form a new interspace and successive lining sections.
摘要:
A roller bracket having a base, a raising and lowering mechanism, a platform, and horizontal and vertical rollers. The base is attached to the vertical face of a starter wall at a level to provide a desired height for a concrete ceiling. With the platform in the raised position, the bottom edge of a tunnel form is lowered between the vertical roller and the starter wall onto the horizontal rollers. A wedge is driven between the vertical roller and the tunnel form to seal the tunnel form against the starter wall. After concrete has been poured, retained by the seal, and cured to form the concrete walls and ceiling, the mechanism can lower the platform to strip the tunnel form from the tunnel. The tunnel form can then be rolled away on the horizontal rollers while being retained on the horizontal rollers by the vertical roller and the starter wall.
摘要:
Shield tunnelling method and assembling and disassembling apparatus for use in practicing the method. A shield having shield jacks is actuated for drilling a hole in the ground. Inner forms and outer forms are assembled into a plurality of tubular units coaxially jointed in the hole so that an annular concrete lining space is defined between the inner forms and the outer forms, the tubular units having a leading tubular unit.The shield jacks are applied against inner forms of the leading tubular units for thrusting the shield during actuating of the shield to further drill the hole. A concrete is injected into the annular concrete lining space to form a concrete lining. The concrete lining within a predetermined length of tubular units is set for providing adhesion to the inner forms, in contact with the concrete lining, against a reaction force of the jack thrust for the shield. Inner forms of the tubular units, located behind the predetermined length of the tubular units, are disassembled from the associated outer forms so that the predetermined length of the concrete lining is remained covered with inner forms. The inner forms disassembled are reused in the assembling of inner forms and outer forms for assembling a new tubular unit in the hole just behind the shield.
摘要:
This invention relates to a method for bracing an underground cavity, wherein the cavity is lined with a tensionable layer, an expansible arch is then inserted against said layer, the arch is then tensioned and clamped in position to exert pressure in accordance with a specified formula.
摘要:
A characteristic feature of the proposed shuttering is the fact that its adjacent sections are interconnected through means preventing them from being mutually inclined in a vertical plane; said means is interposed between said sections and is made as a bar and four links mounted in pairs on pivots at the bar ends, while ends of the links are connected, through ball-and-socket joints, to the respective sections; said bar being composed of at least two members swivelling with respect to each other about a common longitudinal axis.
摘要:
A collapsible concrete tunnel liner section formed from a number of arcuate segments each connected together by hinges to form a closed loop. In collapsed condition the segments are arranged in a compact stack having a cross section less in its maximum dimension than the internal diameter of the erected liner section. Typically the stack has the appearance of a figure 8, having upper and lower cavities. Air bags are located within these cavities and are expanded to expand the collapsed tunnel liner section into its erected condition. During the expansion the liner section passes through an oversized condition before assuming its final erected condition. This ensures stability for the erected liner section. After erection, grout or other filler material is inserted between the liner section and the wall of the tunnel.
摘要: