Method and apparatus for cell-based workforce scheduling

    公开(公告)号:US11210614B1

    公开(公告)日:2021-12-28

    申请号:US13965983

    申请日:2013-08-13

    Inventor: Edward Hamilton

    Abstract: A method for workforce scheduling by a computer system is provided. The method includes receiving a first workforce schedule describing initial assignments of a plurality of workers to a plurality of shifts, each shift comprising one or more work activities, each work activity comprising an activity and a time interval, and storing the first workforce schedule in a memory. The method also includes receiving a cell size associated with each activity, and determining a quantity of workers in each work activity associated with each activity in the first workforce schedule. The method further includes determining cell size violations by dividing the quantity of workers assigned to each work activity by the cell size for the activity associated with the work activity. The method also includes modifying the first workforce schedule to minimize cell size violations, resulting in a second workforce schedule, and storing the second workforce schedule in the memory.

    System and method of work assignment management

    公开(公告)号:US11010695B2

    公开(公告)日:2021-05-18

    申请号:US16601084

    申请日:2019-10-14

    Abstract: Methods of intelligent routing of work assignment includes indexing plurality of pending tasks and indexing a plurality of available employees. A first employee is retrieved from an index of available employees. A next available task assignable to the first employee is determined. A work item for the next available task is assigned to the first employee from the available employee list. The assigned work item is removed from pending task list. The first employee is removed from the available employee list. The next employee is retrieved from the index of available employees.

    Method and apparatus for cell-based workforce scheduling

    公开(公告)号:US11775893B2

    公开(公告)日:2023-10-03

    申请号:US17560568

    申请日:2021-12-23

    Inventor: Edward Hamilton

    Abstract: A method for workforce scheduling by a computer system is provided. The method includes receiving a first workforce schedule describing initial assignments of a plurality of workers to a plurality of shifts, each shift comprising one or more work activities, each work activity comprising an activity and a time interval, and storing the first workforce schedule in a memory. The method also includes receiving a cell size associated with each activity, and determining a quantity of workers in each work activity associated with each activity in the first workforce schedule. The method further includes determining cell size violations by dividing the quantity of workers assigned to each work activity by the cell size for the activity associated with the work activity. The method also includes modifying the first workforce schedule to minimize cell size violations, resulting in a second workforce schedule, and storing the second workforce schedule in the memory.

    Systems and methods for automatic scheduling of a workforce

    公开(公告)号:US11367026B2

    公开(公告)日:2022-06-21

    申请号:US16173132

    申请日:2018-10-29

    Abstract: Systems and methods are disclosed for scheduling a workforce. In one embodiment, the method comprises receiving a shift activity template; receiving an association between the shift activity template and at least one worker; and scheduling a plurality of schedulable objects. The scheduling is performed in accordance with a workload forecast and schedule constraints. Each of the schedulable objects is based on the shift activity template. The shift activity template describes a worker activity performed during a shift. The template has range of start times and a variable length for the activity. The activity is associated with a queue.

    System and method of scheduling work within a workflow with defined process goals

    公开(公告)号:US10769567B1

    公开(公告)日:2020-09-08

    申请号:US15379271

    申请日:2016-12-14

    Abstract: A system and method schedule work within a workflow with defined process goals. A plurality of work queues are defined that comprise work items. The plurality of work queues are associated with one or more links between a parent work queue and at least one child work queue to form at least one work process. At least one work process goal is defined for each work process. A work schedule to achieve the work process goals is generated.

    SYSTEM AND METHOD OF WORK ASSIGNMENT MANAGEMENT

    公开(公告)号:US20200097865A1

    公开(公告)日:2020-03-26

    申请号:US16601084

    申请日:2019-10-14

    Abstract: Methods of intelligent routing of work assignment includes indexing plurality of pending tasks and indexing a plurality of available employees. A first employee is retrieved from an index of available employees. A next available task assignable to the first employee is determined. A work item for the next available task is assigned to the first employee from the available employee list. The assigned work item is removed from pending task list. The first employee is removed from the available employee list. The next employee is retrieved from the index of available employees.

    System and Method of Scheduling Work within a Workflow with Defined Process Goals

    公开(公告)号:US20180308068A1

    公开(公告)日:2018-10-25

    申请号:US16024134

    申请日:2018-06-29

    CPC classification number: G06Q10/1097

    Abstract: A system and method schedule work within a workflow with defined process goals. A plurality of work queues are defined that comprise work items. The plurality of work queues are associated with one or more links between a parent work queue and at least one child work queue to form at least one work process. At least one work process goal is defined for each work process. A work schedule to achieve the work process goals is generated.

    SYSTEMS AND METHODS FOR AUTOMATIC SCHEDULING OF A WORKFORCE

    公开(公告)号:US20210398040A9

    公开(公告)日:2021-12-23

    申请号:US16173132

    申请日:2018-10-29

    Abstract: Systems and methods are disclosed for scheduling a workforce. In one embodiment, the method comprises receiving a shift activity template; receiving an association between the shift activity template and at least one worker; and scheduling a plurality of schedulable objects. The scheduling is performed in accordance with a workload forecast and schedule constraints. Each of the schedulable objects is based on the shift activity template. The shift activity template describes a worker activity performed during a shift. The template has range of start times and a variable length for the activity. The activity is associated with a queue.

Patent Agency Ranking