-
1.
公开(公告)号:US20190285525A1
公开(公告)日:2019-09-19
申请号:US16314607
申请日:2017-09-13
申请人: SHANDONG UNIVERSITY
发明人: Shucai LI , Liping LI , Shaoshuai SHI , Zongqing ZHOU , Hongliang LIU , Jie HU , Shangqu SUN , Jing WANG , Wenfeng TU , Zhijie WEN
摘要: A test device and a test method of fractured rock mass collapse and blockfall and fracture water inrush includes a fractured rock mass preparation device, a water source loading device, a surrounding rock pressurization device and a slide rail, wherein the fractured rock mass preparation device is fixed at one end of the slide rail, and the water source loading device is fixed on the other side of the slide rail. An opening is formed in the rock mass water storage structure, and the size of the opening is adapted to the size of the fractured rock mass; the surrounding rock pressurization device includes one bracket and a pressurization structure arranged below the bracket, and a space for accommodating the fractured rock mass is reserved below the pressurization structure; and the bottom support and the bracket are both movably installed on the slide rail.
-
2.
公开(公告)号:US20220284152A1
公开(公告)日:2022-09-08
申请号:US17630422
申请日:2020-10-22
申请人: SHANDONG UNIVERSITY
发明人: Shucai LI , Liping LI , Zongqing ZHOU , Chenglu GAO , Shaoshuai SHI , Shuai CHENG , Zhuohui LI , Daosheng ZHANG , Wenfeng TU , Meixia WANG
IPC分类号: G06F30/20
摘要: A peridynamics method and system for tunnel rock mass failure water inrush catastrophe simulation. A calculation model is discretized into material points, and a virtual boundary layers is set on an outer side of a boundary of the calculation model as an object to which boundary conditions are applied; a size of a horizon of the material points is selected to form a neighborhood matrix; a crustal stress is made equivalent to a stress boundary condition of the calculation model, a karst cave water pressure is made equivalent to a normal pressure, and a displacement constraint and tunnel support are converted into a displacement boundary condition; a speed and a displacement of the material point are solved, and local damage situations are recorded; and a tunnel construction process is simulated by material point dormancy after initial balance calculation is stable.
-