Managing Corrosion And Scale Buildup In A Wellbore

    公开(公告)号:US20210095563A1

    公开(公告)日:2021-04-01

    申请号:US16588861

    申请日:2019-09-30

    IPC分类号: E21B49/08

    摘要: A method of determining a risk of corrosion and scale formation of tubing in a wellbore includes receiving, from a plurality of first sensors positioned at a downhole location of a wellbore, first production stream information and receiving, from a plurality of second sensors positioned at an uphole location, second production stream information. The method also includes performing a material balance to determine a first value representing a difference between a first production steam flow rate at the downhole location and a second production stream flow rate at the uphole location. The method also includes determining a second value representing a critical metal ion concentration of the production stream and, based on a result of comparing the first value with a threshold and based on the second value, determining a third value representing a risk of corrosion and scale formation at the tubing disposed within the wellbore.

    Managing corrosion and scale buildup in a wellbore

    公开(公告)号:US11118427B2

    公开(公告)日:2021-09-14

    申请号:US16588861

    申请日:2019-09-30

    摘要: A method of determining a risk of corrosion and scale formation of tubing in a wellbore includes receiving, from a plurality of first sensors positioned at a downhole location of a wellbore, first production stream information and receiving, from a plurality of second sensors positioned at an uphole location, second production stream information. The method also includes performing a material balance to determine a first value representing a difference between a first production steam flow rate at the downhole location and a second production stream flow rate at the uphole location. The method also includes determining a second value representing a critical metal ion concentration of the production stream and, based on a result of comparing the first value with a threshold and based on the second value, determining a third value representing a risk of corrosion and scale formation at the tubing disposed within the wellbore.