-
公开(公告)号:US10893641B2
公开(公告)日:2021-01-12
申请号:US15866703
申请日:2018-01-10
Inventor: Takuya Yamazaki , Atsushi Nakazono , Hiroshi Ando , Kazuyoshi Harada
IPC: H05K13/08 , G06Q50/04 , B23K101/42
Abstract: A group determination method includes a step of calculating an external set-up work time for an external set-up work by which a component supplier used in a group that is a next production target of a group under production in a component mounting line, including a plurality of the component mounters capable of attaching and detaching a component supply carriage which can arrange a plurality of the component suppliers (tape feeders), is removed from the component mounting line and arranged in the component supply carriage; and a step of calculating a production completion time at which the production of all the mounting boards that are the production targets is completed in consideration of the external set-up work time. A plurality of groups which are common in an arrangement of component suppliers for the mounting boards that are the production targets are determined so that production completion time is shortened.
-
公开(公告)号:US11181885B2
公开(公告)日:2021-11-23
申请号:US15986198
申请日:2018-05-22
Inventor: Takuya Nakayama , Tetsushi Oohori , Kenichiro Ishimoto , Atsushi Nakazono
IPC: G05B19/4063
Abstract: A manufacturing device monitoring system includes a plurality of manufacturing devices and a remote monitoring device. The manufacturing device includes a work unit, an equipment notifier, an error detector, and an error notifier. The error notifier determines whether or not an error detected by the error detector may be corrected by an operation from the remote monitoring device, notifies the remote monitoring device of the occurrence of the error in a case where the error can be corrected, and operates the equipment notifier to notify a first notification pattern in a case where the error cannot be corrected.
-
公开(公告)号:US10345792B2
公开(公告)日:2019-07-09
申请号:US15865526
申请日:2018-01-09
Inventor: Takuya Yamazaki , Atsushi Nakazono , Hiroshi Ando , Kazuyoshi Harada
IPC: G05B19/418
Abstract: In two component mounting lines or more each including the plurality of the component mounters, a set-up changing work time, necessary for executing set-up changing work in the two component mounting lines or more based on the number of workers assigned for production in the two component mounting lines or more in each time zone, and the number of workers necessary for the set-up changing work necessary when the mounting board is changed in the two component mounting lines or more, is calculated; and a production completion time, which includes a set-up changing work time and at which the production of all the mounting boards that are the production targets is completed, is calculated; and a group is determined so that the production completion time is shortened within a predetermined time period in the two component mounting lines or more.
-
公开(公告)号:US11774952B2
公开(公告)日:2023-10-03
申请号:US18050117
申请日:2022-10-27
Inventor: Atsushi Nakazono , Hisashi Maezono , Kazunori Tomotake , Hideo Matsuoka
IPC: G05B19/418
CPC classification number: G05B19/41865 , G05B2219/31376 , G05B2219/45031 , G05B2219/50386 , Y02P90/02
Abstract: A management apparatus manages works to supply components to component mounting devices in a component mounting line. The management apparatus includes a component remaining number information acquisition portion that acquires, from each of the component mounting devices, a remaining number of components stored in the component mounting device, a worker information storage portion that stores worker information including a working range of each of workers in the component mounting line, a work sequence decision portion that generates work sequence information indicating a work sequence of component supply works for each of the workers based on the worker information and component remaining number information about a plurality of components within a predetermined period of time, and an information transmission portion that transmits the work sequence information to the workers who should perform the works.
-
公开(公告)号:US10512201B2
公开(公告)日:2019-12-17
申请号:US15909134
申请日:2018-03-01
Inventor: Atsushi Nakazono
IPC: H05K13/08 , G05B19/4065 , H05K13/04
Abstract: A member preparation method includes a request rank determining step of determining a request member rank of a member fitted to production of a mounting board based on board information and component information including a mounting position of a component mounted on the mounting board. Furthermore, the member preparation method includes a fitting member extracting step of extracting a fitting member fitted to the request member rank in a plurality of members based on a production plan of the mounting board and retained member information in which a member rank is associated with each of the plurality of the members. Furthermore, the member preparation method includes a use member selecting step of selecting a use member in the fitting member, and a member preparation instructing step of generating an instruction to prepare the use member.
-
公开(公告)号:US11029670B2
公开(公告)日:2021-06-08
申请号:US16806313
申请日:2020-03-02
Inventor: Atsushi Nakazono , Hisashi Maezono , Kazunori Tomotake , Hideo Matsuoka
IPC: G05B19/418
Abstract: A management apparatus manages works to supply components to component mounting devices in a component mounting line. The management apparatus includes a component remaining number information acquisition portion that acquires, from each of the component mounting devices, a remaining number of components stored in the component mounting device, a worker information storage portion that stores worker information including a working range of each of workers in the component mounting line, a work sequence decision portion that generates work sequence information indicating a work sequence of component supply works for each of the workers based on the worker information and component remaining number information about a plurality of components within a predetermined period of time, and an information transmission portion that transmits the work sequence information to the workers who should perform the works.
-
公开(公告)号:US10824137B2
公开(公告)日:2020-11-03
申请号:US15992259
申请日:2018-05-30
Inventor: Inlin Tan , Takuya Yamazaki , Takaaki Yokoi , Narumi Atsuta , Atsushi Nakazono
IPC: G05B19/418
Abstract: A mounting board manufacturing system includes a component placing device; a library; an operation information counter; and a corrector. The component data includes a control parameter for executing the component placing work by the component placing device, and information regarding the component. The operation information counter counts a score of the component placing work for each component data based on operation information including a result executed by the component placing device. The corrector selects correction component data that is a target to be corrected from a plurality of the component data based on the score and corrects the control parameter of the correction component data.
-
公开(公告)号:US10210039B2
公开(公告)日:2019-02-19
申请号:US15401487
申请日:2017-01-09
Inventor: Tetsushi Oohori , Kenichiro Ishimoto , Atsushi Nakazono
Abstract: A component mounting system includes a component mounting line in which a plurality of processing devices are connected to constitute the component mounting line and a management device (management computer) connected to the component mounting line by a network, and each of the plurality of processing devices can be remotely operated via the network by an input unit of the management device. In this component mounting system, it is determined whether or not an error occurring in the processing device is a remote response error (ST1) and a remote operation right enabling the remote operation is set (ST21) with respect to the management device based on a result of the error type determination in a case where the type of the error is the remote response error (Yes in ST1).
-
公开(公告)号:US11526157B2
公开(公告)日:2022-12-13
申请号:US17245395
申请日:2021-04-30
Inventor: Atsushi Nakazono , Hisashi Maezono , Kazunori Tomotake , Hideo Matsuoka
IPC: G05B19/418
Abstract: A management apparatus manages works to supply components to component mounting devices in a component mounting line. The management apparatus includes a component remaining number information acquisition portion that acquires, from each of the component mounting devices, a remaining number of components stored in the component mounting device, a worker information storage portion that stores worker information including a working range of each of workers in the component mounting line, a work sequence decision portion that generates work sequence information indicating a work sequence of component supply works for each of the workers based on the worker information and component remaining number information about a plurality of components within a predetermined period of time, and an information transmission portion that transmits the work sequence information to the workers who should perform the works.
-
公开(公告)号:US11215976B2
公开(公告)日:2022-01-04
申请号:US16688194
申请日:2019-11-19
Inventor: Kazuyoshi Harada , Takuya Yamazaki , Atsushi Nakazono , Hiroshi Ando
IPC: G05B99/00 , G05B19/418 , H05K13/08 , G01D7/00
Abstract: A component mounting system includes a component mounting line, a storage device, and a display device. The component mounting line is formed by connecting a plurality of mounting board manufacturing machines. The storage device is connected to the component mounting line via a network to acquire information from each of the plurality of mounting board manufacturing machines. The display device is connected to the storage device via the network and displays a progress status of set-up work executed when changing a type of a mounting board manufactured by the component mounting line based on information stored in the storage device.
-
-
-
-
-
-
-
-
-