摘要:
A system includes a drilling rig having a substructure, the drilling rig being adapted to be positioned above a plurality of wellbore location such that each of the plurality of wellbore locations is simultaneously positioned below the substructure. Equipment movement means is included for moving pressure control equipment between positions proximate each of the plurality of wellbore locations, the equipment movement means being adapted to move the pressure control equipment between the positions while the drilling rig is performing a rig operation on at least a first one of the plurality of wellbore locations. Equipment positioning means is included for positioning pressure control equipment on one or more of the plurality of wellbore locations, the equipment positioning means being adapted to position the pressure control equipment on a second one of the plurality of wellbore locations while the rig operation is being performed on the first wellbore location.
摘要:
A method includes assembling a telescoping substructure box having first and second substructure boxes in a collapsed configuration by nesting at least a portion of the first substructure box inside of a substantially open interior space defined by a plurality of structural elements that comprise the second substructure box. The assembled telescoping substructure box is transported to a drilling site and telescopically raised from the collapsed transportation configuration to a raised operating configuration for performing drilling operations on a wellbore location of the drilling site by telescopically raising one of the first and second substructure boxes relative to the other one of the first and second substructure boxes. A drilling mast is coupled to and raised above the telescoping substructure box, and drilling operations are performed on the wellbore location with the raised drilling mast.
摘要:
A collapsible drilling rig substructure is transported to a drilling site while in a collapsed transportation configuration wherein a raisable floor of the substructure is in a lowered transportation position relative to a fixed drill floor such that an upper surface of the raisable floor is positioned at a first height level above a base of the substructure while an upper surface of the fixed drill floor is positioned at a second height level above the base that is greater than the first height level. The substructure is positioned adjacent to a wellbore location at the drilling site and reconfigured from the lowered transportation configuration to a raised operating configuration by raising the raisable floor to an operating position laterally adjacent to the fixed drill floor while maintaining a height level of the upper surface of the fixed drill floor at the second height level.
摘要:
Disclosed herein is a telescoping substructure of a drilling rig that includes first and second telescoping substructure boxes. The first and second telescoping substructure boxes each include, among other things, a lower substructure box and an upper substructure box that is adapted to be telescopically raised and lowered relative to the lower substructure box. Furthermore, each telescoping substructure box also includes raising means for telescopically raising and lowering the upper substructure box relative to the lower substructure box between a collapsed configuration for transportation and a raised configuration for drilling operations, wherein each of the first and second telescoping substructure boxes are adapted to facilitate movement of the telescoping substructure in at least one of a lateral direction and a longitudinal direction over wellhead equipment positioned above a wellbore location when the upper substructure boxes are in the raised configuration.
摘要:
A system is disclosed that includes a drilling rig having a substructure, the drilling rig being adapted to be positioned above a plurality of wellbore location such that each of the plurality of wellbore locations is simultaneously positioned below the substructure, equipment movement means for moving pressure control equipment between positions proximate each of the plurality of wellbore locations, the equipment movement means being adapted to move the pressure control equipment between the positions while the drilling rig is performing a rig operation on at least a first one of the plurality of wellbore locations, and equipment positioning means for positioning pressure control equipment on one or more of the plurality of wellbore locations, the equipment positioning means being adapted to position the pressure control equipment on a second one of the plurality of wellbore locations while the rig operation is being performed on the first wellbore location.
摘要:
Systems and methods for clearing a top drive from an operational area of the mast such that operations may be performed along the rail without interference from the top drive. Systems and methods of the present disclosure provide for arranging the top drive in a parked configuration outside of, or generally behind, the mast. A guide rail may be arranged within an operational area of a mast and may have a pair of interchangeable rail sections, each of which may be configured for arrangement in either an operating configuration, where the rail section may be positioned within the operational area of the mast to form part of the rail, or a parked configuration, where the rail section may be positioned outside of the operational area. Each interchangeable rail section may be pivotable about an axis and may be arranged on a pivotable gate of the mast.
摘要:
Systems and methods for clearing a top drive from an operational area of the mast such that operations may be performed along the rail without interference from the top drive. Systems and methods of the present disclosure provide for arranging the top drive in a parked configuration outside of, or generally behind, the mast. A guide rail may be arranged within an operational area of a mast and may have a pair of interchangeable rail sections, each of which may be configured for arrangement in either an operating configuration, where the rail section may be positioned within the operational area of the mast to form part of the rail, or a parked configuration, where the rail section may be positioned outside of the operational area. Each interchangeable rail section may be pivotable about an axis and may be arranged on a pivotable gate of the mast.
摘要:
A drilling rig mast erection system includes a mast support shoe that is fixedly attached to a drilling rig substructure and has a support shoe pinned connection. A bottom mast section has a first mast pinned connection that is adapted to be pivotably connected to the support shoe pinned connection. A mast positioning apparatus is adapted to pivotably position the bottom mast section so that the first mast pinned connection is positioned adjacent to the support shoe pinned connection. The mast positioning apparatus includes a bottom mast support spreader having a first end that is adapted to be pivotably connected to the bottom mast section at a first spreader end pinned connection and a mast erection apparatus having a first end that is adapted to be pivotably connected to the bottom mast support spreader at a first mast erection apparatus pinned connection.
摘要:
A system includes a drilling mud cooling apparatus that is adapted to receive a flow of a mixture of drilling materials from a drilled wellbore during a drilling operation, and to cool the mixture from a first temperature to a second temperature, wherein the cooled mixture of drilling materials includes cooled drilling mud and drill cuttings. The disclosed system further includes a shale shaker apparatus that is adapted to receive a flow of the cooled mixture of drilling materials from the drilling mud cooling apparatus and to separate at least a portion of the drill cuttings from the cooled drilling mud.
摘要:
A collapsible drilling rig substructure is transported to a drilling site while in a collapsed transportation configuration wherein a raisable floor of the substructure is in a lowered transportation position relative to a fixed drill floor such that an upper surface of the raisable floor is positioned at a first height level above a base of the substructure while an upper surface of the fixed drill floor is positioned at a second height level above the base that is greater than the first height level. The substructure is positioned adjacent to a wellbore location at the drilling site and reconfigured from the lowered transportation configuration to a raised operating configuration by raising the raisable floor to an operating position laterally adjacent to the fixed drill floor while maintaining a height level of the upper surface of the fixed drill floor at the second height level.