摘要:
A rope terminal assembly of an elevator fixes an elevator rope to a fixing base such as an elevator unit, said elevator being suitable for transporting passengers and/or goods, which assembly includes at least the following components: an elevator rope, whose width is larger than its thickness in a rope transverse direction, with at least one end having an end face, one or more wedge elements, and a wedge housing, the rope terminal assembly including a rope gap through which said elevator rope passes and said wedge element is arranged to wedge between said rope and said wedge housing thus locking said elevator rope in the gap, and at least one component of the rope terminal assembly made of fiber reinforced polymer composite material, and an elevator.
摘要:
A travelling cable of an elevator, more particularly of a passenger transport elevator and/or freight transport elevator, includes a protective envelope, conductors for transmitting electrical energy and data between the elevator car and the elevator hoistway, and one or more load-bearing bearer parts of essentially the length of the travelling cable for fixing the travelling cable at its first end to the elevator car and at its second end to the elevator hoistway, and which bearer part includes glass-fiber reinforcements and/or aramid-fiber reinforcements and/or carbon-fiber reinforcements and/or polybenzoxazole-fiber reinforcements and/or polyethylene-fiber reinforcements and/or nylon-fiber reinforcements in a polymer matrix material. An elevator includes the travelling cable.
摘要:
The self-climbing elevator machine room comprises two decks positioned upon each other. Each deck comprises guide means supporting the deck movably on guide rails and locking means locking and unlocking the deck to the guide rails and/or to guide rail fixing means. Lifting means move the two decks along the guide rails in relation to each other. At least one power source provides power to the lifting means. The elevator machine room climbs stepwise along the guide rails by alternatingly locking and unlocking the lower deck and the upper deck to the guide rails and/or to the guide rail fixing means and thereafter raising the unlocked deck.
摘要:
The invention relates to a movable machine room comprising a support platform of a hoisting machine, the support platform comprising one or more releasable mounting mechanisms for releasably mounting the moveable machine room in a hoistway, and a hoisting machine mounted on the support platform; a working platform on top of the support platform, preferably forming a roof of the moveable machine room and/or comprising handrails; and at least one support structure supported by which the working platform rests on the support platform; and wherein each said support structure is selectively actuatable to expand in vertical direction for hoisting the working platform higher above the support platform taking reaction force from the support platform, or to contract in vertical direction for lowering the working platform back towards the support platform. The invention relates to an arrangement and a method implementing the movable machine room.
摘要:
In a rope of a lifting device, particularly of a passenger transport elevator and/or freight transport elevator, the width of which rope is greater than the thickness in the transverse direction of the rope, which rope includes a load-bearing part in the longitudinal direction of the rope, which load-bearing part includes carbon-fiber reinforced, aramid-fiber reinforced and/or glass-fiber reinforced composite material in a polymer matrix, and which rope includes one or more optical fibers and/or fiber bundles in connection with the load-bearing part and the optical fiber and/or fiber bundle is laminated inside the load-bearing part and/or the optical fiber and/or fiber bundle is glued onto the surface of the load-bearing part and/or and that the optical fiber and/or fiber bundle is embedded or glued into the polymer envelope surrounding the load-bearing part, as well as to a condition monitoring method for the rope of a lifting device.
摘要:
A rope and an elevator. The rope comprises a core, an outer layer of strands, comprising at least four outer strands, and an elastomeric coating creating at least the outer surface of the rope.
摘要:
The self-climbing installation platform comprises two decks positioned upon each other. Each deck comprises guide means supporting the deck movably on guide rails and locking means locking and unlocking the deck to the guide rails and/or to guide rail fixing means. Lifting means move the two decks along the guide rails in relation to each other. At least one power source provides power to the lifting means. The installation platform climbs stepwise along the guide rails by alternatingly locking and unlocking the lower and the upper deck to the guide rails and/or to the guide rail fixing means and thereafter raising the unlocked deck.
摘要:
The invention relates to a method for managing flow of people and goods within a building under construction, comprising providing one or more elevator control systems for automatically controlling movement of elevator cars; providing a first passenger elevator, the first passenger elevator comprising a first passenger elevator car for transporting people, the first passenger elevator car being vertically movable in an elevator hoistway formed inside the building under construction, vertical movement of the car being automatically controlled by an elevator control system, the first passenger elevator car comprising an interior delimited by floor, walls, ceiling and at least one automatic door; and providing a goods elevator, the goods elevator comprising a goods elevator car for transporting goods, the goods elevator car being vertically movable beside the first passenger elevator car in an elevator hoistway formed inside the building under construction, vertical movement of the goods elevator car being automatically controlled by an elevator control system, the goods elevator car comprising at least a transport platform; using the first passenger elevator to transport passengers between floors of the building under construction; and using the goods elevator to transport goods between floors of the building under construction. The invention also relates to an arrangement for managing flow of people and goods within a building under construction, which arrangement implements the method.
摘要:
The arrangement comprises a self-climbing installation platform comprising two consecutive decks, a machine room deck suspended from the installation platform and an elevator car suspended from the machine room deck. Each deck, the machine room deck and the car are supported movably with guide means on guide rails and locked and unlocked with locking means to the guide rails and/or to guide rail fixing means. Lifting means powered by a power source move the two decks in relation to each other. The installation platform climbs stepwise along the guide rails by alternatingly locking and unlocking the lower deck and the upper deck to the guide rails and/or to the guide rail fixing means and thereafter raising the unlocked deck.
摘要:
The invention relates to a method for transporting construction material and/or equipment into and inside a building under construction, wherein the building under construction comprises plurality of vertically displaced floors, the method comprising providing a control system configured to automatically operate one or more transporting devices, including at least an elevator; providing a storage at the construction site of the building; and transporting into the storage at the construction site of the building under construction plurality of transport containers containing construction material and/or equipment; storing said transport containers in the storage; and delivering transport containers belonging to said plurality of transport containers from said storage to different destination floors, the delivering comprising obtaining an order to deliver a transport container, the order identifying the transport container to be delivered; and retrieving the transport container identified in the order from the storage; and moving said transport container at least horizontally to a container loading floor of the building under construction; and loading said transport container on the load receiving unit for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container; and moving the load receiving unit vertically in the elevator shaft to the destination floor of said transport container; and unloading said transport container from the load receiving unit to the destination floor of said transport container. The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building under construction.