CONTROLLING APPARATUS AND STARTING METHOD
    1.
    发明申请
    CONTROLLING APPARATUS AND STARTING METHOD 审中-公开
    控制装置和启动方法

    公开(公告)号:US20150176437A1

    公开(公告)日:2015-06-25

    申请号:US14578644

    申请日:2014-12-22

    IPC分类号: F01K23/10 F02C7/26 F02C9/00

    摘要: A controlling apparatus to control a combined cycle power-generating plant, the combined cycle power-generating plant including: a gas turbine; an heat recovery steam generator; and a steam turbine includes a controller that controls an output of the gas turbine. The controller controls the output of the gas turbine at a second output value that is greater than a first output value, after a paralleling of a power generator of the gas turbine, the first output value being a gas turbine output when an exhaust gas temperature of the gas turbine falls within a temperature range that is determined based on a metal temperature of the steam turbine. The controller controls the output of the gas turbine at the first output value, in a case where a temperature of the steam generated by the heat recovery steam generator exceeds a temperature based on the metal temperature.

    摘要翻译: 一种控制组合循环发电厂的控制装置,所述联合循环发电设备包括:燃气轮机; 热回收蒸汽发生器; 并且蒸汽涡轮机包括控制燃气轮机的输出的控制器。 在燃气轮机的发电机并联之后,控制器将燃气轮机的输出控制在大于第一输出值的第二输出值,第一输出值是当燃气轮机的排气温度 燃气轮机落在基于蒸汽轮机的金属温度确定的温度范围内。 在由热回收蒸汽发生器产生的蒸汽的温度超过基于金属温度的温度的情况下,控制器将燃气轮机的输出控制在第一输出值。

    FEEDWATER SYSTEM OF COMBINED CYCLE POWER PLANT

    公开(公告)号:US20170268383A1

    公开(公告)日:2017-09-21

    申请号:US15459263

    申请日:2017-03-15

    IPC分类号: F01K11/02 F01K13/02 F01K13/00

    摘要: A combined cycle power plant feedwater system includes: a feed pump which supplies feedwater to a heat recovery steam generator; a first pipe which extracts part of the feedwater from a flow path in mid-course of pressurization of the feed pump; a first boiler supplied with the feedwater led into the first pipe and subjected to first water treatment; a second pipe where the feedwater discharged from a feed pump outlet flows; a second boiler supplied with the feedwater led into the second pipe and subjected to second water treatment more downstream than the flow path in mid-course of the pressurization; and a water-treating substance supply device which supplies a water-treating substance for the second water treatment to the feedwater flow path in the feed pump, at a position more downstream than a connection position of the first pipe and more upstream than a connection position of the second pipe.

    Feedwater system of combined cycle power plant

    公开(公告)号:US10760453B2

    公开(公告)日:2020-09-01

    申请号:US15459263

    申请日:2017-03-15

    摘要: A combined cycle power plant feedwater system includes: a feed pump which supplies feedwater to a heat recovery steam generator; a first pipe which extracts part of the feedwater from a flow path in mid-course of pressurization of the feed pump; a first boiler supplied with the feedwater led into the first pipe and subjected to first water treatment; a second pipe where the feedwater discharged from a feed pump outlet flows; a second boiler supplied with the feedwater led into the second pipe and subjected to second water treatment more downstream than the flow path in mid-course of the pressurization; and a water-treating substance supply device which supplies a water-treating substance for the second water treatment to the feedwater flow path in the feed pump, at a position more downstream than a connection position of the first pipe and more upstream than a connection position of the second pipe.