-
公开(公告)号:US20240222970A1
公开(公告)日:2024-07-04
申请号:US18398007
申请日:2023-12-27
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Risbeck , Chenlu Zhang , Saman Cyrus , Young M. Lee
IPC: H02J3/00
CPC classification number: H02J3/004 , H02J3/003 , H02J2203/10
Abstract: A method is provided for achieving a net energy goal for building operations for a time period including a first subperiod before a current time and a second subperiod from the current time to an end of the time period. The method includes generating first forecasted ranges for amounts of energy consumption for a plurality of time steps in the second subperiod, generating second forecasted ranges for amounts of energy production for the plurality of time steps in the second subperiod, and generating third forecasted ranges for amounts of net energy for the plurality of time steps in the second subperiod. The amounts of net energy are based on differences between the amounts of energy consumption and the amounts of energy production. The method also includes providing a strategy for the building operations based on the third forecasted ranges and the net energy goal
-
2.
公开(公告)号:US20240185122A1
公开(公告)日:2024-06-06
申请号:US18116974
申请日:2023-03-03
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Young M. Lee , Wenwen Zhao , Brian E. Keenan , Santle Camilus Kulandai Samy , Michael J. Risbeck , Zhanhong Jiang , Chenlu Zhang , Saman Cyrus
IPC: G06N20/00 , G05B19/042 , G06N7/01
CPC classification number: G06N20/00 , G05B19/042 , G06N7/01 , G05B2219/2614
Abstract: A method for training a fault probability model using warranty claim data includes obtaining, by a processing circuit, a first data set for failed building devices based on warranty claim data associated with the building devices; receiving, by the processing circuit, design change data associated with the building devices and determining a design change date based on the design change data; comparing, by the processing circuit, a manufacturing date for each of the failed building devices with the design change date; removing, by the processing circuit, any building devices from the first data set in response to the manufacturing date preceding the design change date to create an updated first data set; generating, by the processing circuit, a training data set comprising the updated first data set; and training, by the processing circuit, a fault probability model using the training data set to produce a trained model.
-
公开(公告)号:US20230315079A1
公开(公告)日:2023-10-05
申请号:US17710706
申请日:2022-03-31
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Risbeck , Chenlu Zhang , Zhanhong Jiang , Young M. Lee , Santle Camilus Kulandai Samy , Jaume Amores , Saman Cyrus
CPC classification number: G05B23/0254 , G05B13/048 , G05B13/029
Abstract: A method includes obtaining a fault prediction model for building equipment, predicting, with the fault prediction model, both (i) whether a fault will occur during a first prediction bin and (ii) whether a fault will occur during a second prediction bin, performing a first mitigating action for the building equipment if the fault is predicted to occur during the first prediction bin, and performing a second mitigating action for the building equipment if the fault is predicted to occur during the second prediction bin.
-
-