公开(公告)号:US20120155968A1
公开(公告)日:2012-06-21
申请号:US13327553
申请日:2011-12-15
申请人: Hang Ryong Byun , Jun Seoung Kim
发明人: Hang Ryong Byun , Jun Seoung Kim
CPC分类号: E02D35/00
摘要: Disclosed is a construction method of a cellar for a building completed. The construction method includes fixing supporting structures to bottom concrete of the building; installing a press-in machine on the supporting structures; inserting posts for supporting the building into the foundation under the building by inserting hollow piles into the holes to then insert the piles into the underground using the press-in machine, stacking new piles on the inserted piles, and sequentially inserting the piles using the press-in machine; excavating a foundation under the bottom concrete of the building to prepare an underground space when the building is supported by the posts; and placing the concrete on the horizontal and vertical faces of the underground space prepared by the excavating the bottom concrete of the building.
摘要翻译: 公开了一种完成建筑物的地窖的施工方法。 施工方法包括将支撑结构固定在建筑物的底部混凝土上; 在支撑结构上安装压入机; 通过将空心桩插入孔中将支撑建筑物的支柱插入建筑物内的基础,然后使用压入机将桩插入地下,将新桩堆叠在插入的桩上,并使用压力机顺序地插入桩 在机器上 在建筑物的底部混凝土下挖掘基础,以便在建筑物被柱子支撑时准备地下空间; 并将混凝土置于通过挖掘建筑物底部混凝土而制备的地下空间的水平和垂直面上。