-
公开(公告)号:US20180320049A1
公开(公告)日:2018-11-08
申请号:US15772883
申请日:2015-12-30
IPC分类号: C09K8/06 , C09K8/80 , E21B21/06 , E21B43/267 , E21B21/00
CPC分类号: C09K8/06 , C09K8/665 , C09K8/80 , C09K8/805 , E21B21/003 , E21B21/062 , E21B43/267
摘要: Systems and methods for treating subterranean formations using particulates treated with hydrophobizing agents in aqueous base fluid are provided. In one embodiment, the methods comprise: providing a treatment fluid comprising an aqueous base fluid and at least one particulate treated with one or more hydrophobizing agents; introducing the into a wellbore penetrating at least a portion of a subterranean formation; and using the treatment fluid to drill a portion of the wellbore.
-
公开(公告)号:US20180016485A1
公开(公告)日:2018-01-18
申请号:US15538086
申请日:2015-02-10
发明人: Kay Ann Galindo , Sandeep Kulkarni , Matthew Lynn Miller , Dale E. Jamison , Jessica Paola Ramirez Angulo , William Walter Shumway
CPC分类号: C09K8/145 , C09K8/14 , C09K8/16 , C09K8/24 , C09K2208/08 , E21B33/134
摘要: The present disclosure relates to systems and methods for wellbore pressure control with separated fluid columns. One embodiment is a composition comprising: a base fluid, a hectorite clay, a secondary clay comprising at least one clay selected from the group consisting of an attapulgite clay, a sepiolite clay, a polygorskite clay, and any combination thereof, and a plurality of fibers. Another embodiment is a method comprising: introducing a first fluid into a wellbore; introducing a barrier pill into the wellbore, wherein the barrier pill comprises: a base fluid, a hectorite clay, and a plurality of fibers; and introducing a second fluid into the wellbore. Another embodiment is a method comprising: introducing a first fluid into a wellbore; introducing a barrier pill into the wellbore, wherein the barrier pill comprises: a base fluid, a hectorite clay, and a secondary clay comprising at least one clay selected from the group consisting of an attapulgite clay, a sepiolite clay, a polygorskite clay, and any combination thereof; and introducing a second fluid into the wellbore.
-
公开(公告)号:US11168240B2
公开(公告)日:2021-11-09
申请号:US16492454
申请日:2017-04-21
摘要: Compositions, methods, and systems for using particulates treated with one or more hydrophobizing agents in forming filter cakes during drilling to improve filter-cake removal. A method for drilling a wellbore may include circulating a drilling fluid in the wellbore, wherein the drilling fluid comprises particulates treated with one or more hydrophobizing agents; extending the wellbore while the drilling fluid is circulated in the wellbore; and forming a filter cake in the wellbore, wherein the filter cake comprises a portion of the particulates from the drilling fluid.
-
公开(公告)号:US20210017439A1
公开(公告)日:2021-01-21
申请号:US16492454
申请日:2017-04-21
摘要: Compositions, methods, and systems for using particulates treated with one or more hydrophobizing agents in forming filter cakes during drilling to improve filter-cake removal. A method for drilling a wellbore may include circulating a drilling fluid in the wellbore, wherein the drilling fluid comprises particulates treated with one or more hydrophobizing agents; extending the wellbore while the drilling fluid is circulated in the wellbore; and forming a filter cake in the wellbore, wherein the filter cake comprises a portion of the particulates from the drilling fluid.
-
公开(公告)号:US11021640B2
公开(公告)日:2021-06-01
申请号:US15772883
申请日:2015-12-30
摘要: Systems and methods for treating subterranean formations using particulates treated with hydrophobizing agents in aqueous base fluid are provided. In one embodiment, the methods comprise: providing a treatment fluid comprising an aqueous base fluid and at least one particulate treated with one or more hydrophobizing agents; introducing the into a wellbore penetrating at least a portion of a subterranean formation; and using the treatment fluid to drill a portion of the wellbore.
-
公开(公告)号:US10995259B2
公开(公告)日:2021-05-04
申请号:US16444645
申请日:2019-06-18
摘要: A method of inhibiting gas hydrate formation in downhole fluids, including providing a downhole fluid and mixing the downhole fluid with an aqueous gas thermodynamic hydrate inhibitor formulation to form a downhole fluid mixture. A concentration of lithium chloride in the downhole fluid mixture is at least about 1 wt % and a density of the downhole fluid mixture is in a range of about 1.08 to 1.3 gm/cm3 at a downhole temperature of about 50° F. or less and a downhole differential pressure of about 500 psi or higher. An aqueous gas thermodynamic hydrate inhibitor formulation and oil and gas well drilling system including such a formulation are also disclosed.
-
公开(公告)号:US20200317990A1
公开(公告)日:2020-10-08
申请号:US16444645
申请日:2019-06-18
摘要: A method of inhibiting gas hydrate formation in downhole fluids, including providing a downhole fluid and mixing the downhole fluid with an aqueous gas thermodynamic hydrate inhibitor formulation to form a downhole fluid mixture. A concentration of lithium chloride in the downhole fluid mixture is at least about 1 wt % and a density of the downhole fluid mixture is in a range of about 1.08 to 1.3 gm/cm3 at a downhole temperature of about 50° F. or less and a downhole differential pressure of about 500 psi or higher. An aqueous gas thermodynamic hydrate inhibitor formulation and oil and gas well drilling system including such a formulation are also disclosed.
-
公开(公告)号:US10428258B2
公开(公告)日:2019-10-01
申请号:US15538086
申请日:2015-02-10
发明人: Kay Ann Galindo , Sandeep Kulkarni , Matthew Lynn Miller , Dale E. Jamison , Jessica Paola Ramirez Angulo , William Walter Shumway
IPC分类号: C09K8/14 , E21B33/134 , C09K8/16 , C09K8/24
摘要: The present disclosure relates to systems and methods for wellbore pressure control with separated fluid columns. One embodiment is a composition comprising: a base fluid, a hectorite clay, a secondary clay comprising at least one clay selected from the group consisting of an attapulgite clay, a sepiolite clay, a palygorskite clay, and any combination thereof, and a plurality of fibers. Another embodiment is a method comprising: introducing a first fluid into a wellbore; introducing a barrier pill into the wellbore, wherein the barrier pill comprises: a base fluid, a hectorite clay, and a plurality of fibers; and introducing a second fluid into the wellbore. Another embodiment is a method comprising: introducing a first fluid into a wellbore; introducing a barrier pill into the wellbore, wherein the barrier pill comprises: a base fluid, a hectorite clay, and a secondary clay comprising at least one clay selected from the group consisting of an attapulgite clay, a sepiolite clay, a palygorskite clay, and any combination thereof; and introducing a second fluid into the wellbore.
-
-
-
-
-
-
-