-
公开(公告)号:US20230328576A1
公开(公告)日:2023-10-12
申请号:US18335982
申请日:2023-06-15
Applicant: HUAWEI TECHNOLOGIES CO., LTD.
Inventor: Yingda Liu , Maozhi Tao , Jiangli Luo , Hongbo Gao
IPC: H04W28/02
CPC classification number: H04W28/0221 , H04W28/0252
Abstract: A communication device includes a first carrier and a second carrier. In a radio frequency channel management process, the communication device obtains a downlink sub-frame, and determines a target sub-frame in the downlink sub-frame, where both the first carrier and the second carrier allow shutting down a target radio frequency channel of the communication device in a time period corresponding to the target sub-frame. The communication device shuts down the target radio frequency channel in the time period corresponding to the target sub-frame. In this way, an energy-saving effect of the communication device is achieved by performing shutdown control on a radio frequency channel in a time period corresponding to a sub-frame granularity without affecting data communication between the communication device and another device based on each carrier.
-
公开(公告)号:US11589379B2
公开(公告)日:2023-02-21
申请号:US17093309
申请日:2020-11-09
Applicant: Huawei Technologies Co., Ltd.
Inventor: Longji Zeng , Lang He , Aiying Wang , Jiangli Luo , Zhouyu Deng
IPC: H04W72/12 , H04W72/04 , H04W72/121 , H04W72/1273
Abstract: A method, a device, and a system for resource allocation are provided to improve network capacities. The method implemented by an access network device includes: obtaining a first quantity of repetitions M and a first MCS order that are of a scheduling resource of a first terminal, and a second quantity of repetitions N and a second MCS order that are of a scheduling resource of a second terminal; calculating overlapping areas of first and second total scheduling resources based on the first and second quantities of repetitions and the first and second MCS orders, respectively; determining a maximum overlapping area of the first total scheduling resource based on the calculated overlapping areas; and allocating to the second terminal, N consecutive scheduling resources overlapping with the first total scheduling resource, wherein an overlapping area is less than or equal to the maximum overlapping area.
-