-
公开(公告)号:US11261844B2
公开(公告)日:2022-03-01
申请号:US16288839
申请日:2019-02-28
Applicant: General Electric Company
Inventor: Chad Moshe Hotimsky , Necip Doganaksoy
Abstract: A method for operating a wind turbine includes determining at least one wind condition of the wind turbine for a plurality of time intervals. The method also includes determining a status of the wind turbine at the beginning of each of the plurality of time intervals. Further, the method includes determining at least one vibration parameter of the wind turbine for one or more preceding time intervals of the plurality of time intervals. Moreover, the method includes predicting whether a trip event is imminent based on the at least one wind condition, the status of the wind turbine at the beginning of each of the plurality of time intervals, and the vibration parameter. Thus, the method further includes implementing a control action for the wind turbine so as to prevent the trip event.
-
公开(公告)号:US11242842B2
公开(公告)日:2022-02-08
申请号:US16303243
申请日:2017-05-19
Applicant: GENERAL ELECTRIC COMPANY
Inventor: Robert August Kaucic , Zhanpan Zhang , Subhankar Ghosh , Hongyan Liu , Necip Doganaksoy
Abstract: The present disclosure is directed to a system and method for forecasting a farm-level power output of a wind farm having a plurality of wind turbines. The method includes collecting actual operational data and/or site information for the wind farm. The method also includes predicting operational data for the wind farm for a future time period. Further, the method includes generating a model-based power output forecast based on the actual operational data, the predicted operational data, and/or the site information. In addition, the method includes measuring real-time operational data from the wind farm and adjusting the power output forecast based on the measured real-time operational data. Thus, the method also includes forecasting the farm-level power output of the wind farm based on the adjusted power output forecast.
-
公开(公告)号:US20200277932A1
公开(公告)日:2020-09-03
申请号:US16288839
申请日:2019-02-28
Applicant: General Electric Company
Inventor: Chad Moshe Hotimsky , Necip Doganaksoy
IPC: F03D7/02
Abstract: A method for operating a wind turbine includes determining at least one wind condition of the wind turbine for a plurality of time intervals. The method also includes determining a status of the wind turbine at the beginning of each of the plurality of time intervals. Further, the method includes determining at least one vibration parameter of the wind turbine for one or more preceding time intervals of the plurality of time intervals. Moreover, the method includes predicting whether a trip event is imminent based on the at least one wind condition, the status of the wind turbine at the beginning of each of the plurality of time intervals, and the vibration parameter. Thus, the method further includes implementing a control action for the wind turbine so as to prevent the trip event.
-
公开(公告)号:US11334834B2
公开(公告)日:2022-05-17
申请号:US15601145
申请日:2017-05-22
Applicant: General Electric Company
Inventor: Subhankar Ghosh , Abhirup Mondal , Necip Doganaksoy , Hongyan Liu , Zhanpan Zhang , Robert August Kaucic , Jay Zhiqiang Cao
Abstract: The system and method described herein relate to production of power from the wind farm that incorporate tunable power production forecasts for optimal wind farm performance, where the wind farm power production is controlled at least in part by the power production forecasts. The system and method use a tunable power forecasting model to generate tunable coefficients based on asymmetric loss function applied on actual power production data, along with tuning factor(s) that tune forecast towards under forecasting or over forecasting. The power production forecasts are generated using the tunable coefficients 34 and power characteristic features that are derived from actual power production data. The power production forecasts are monitored for any degradation, and a control action to regenerate the coefficients or retune the model is undertaken if degradation is observed.
-
-
-