Abstract:
A base station that runs a plurality of beams calculates the sum of proportional fairness metrics for each of terminals scheduled for resource allocation in the beams, creates a beam muting list based on the sum of proportional fairness metrics for each beam, and mutes the beams in the beam muting list for blocking power.
Abstract:
Disclosed herein are a dual connectivity method including determining another base station to be dually connected with UE, setting up another base station, and reconfiguring the RRC connection of the UE with another base station, a method of changing a base station in a dual connectivity state, a method of hanging radio resources in a dual connectivity state, and a method of releasing dual connectivity.