-
1.
公开(公告)号:US11384638B2
公开(公告)日:2022-07-12
申请号:US17059219
申请日:2018-10-29
发明人: Nong Zhang , Zhengzheng Xie , Qun Wei , Junyao Zhou
摘要: An apparatus for controllably unfolding a flexible mesh for a continuous miner includes a mesh roll storage rack, a height adjustment post, a mesh rolling shaft and a flexible mesh. The flexible mesh includes a mesh roll and an unfolded mesh. The mesh roll and the unfolded mesh are an integrated structure. The mesh roll is located on the mesh roll storage rack. The unfolded mesh is clamped on the mesh rolling shaft, and is pressed on a cut un-supported tunnel roof via a roof bolt. The mesh rolling shaft is rotatably connected to a top portion of the height adjustment post. The mesh roll storage rack and the height adjustment post are both mounted on the continuous miner. The mesh rolling shaft is located at a back end of the mesh roll storage rack. A limit mechanism and a damping mechanism are disposed on the mesh rolling shaft.
-
公开(公告)号:US20210340872A1
公开(公告)日:2021-11-04
申请号:US16624541
申请日:2018-10-29
发明人: Nong ZHANG , Zhengzheng Xie , Junyao Zhou , Qun Wei
摘要: The present invention provides a single-anchor centrally grouted full-length anchored steel wire bundle and a supporting method thereof, which are suitable for use in supporting engineering for the deep dynamic pressure roadway or soft rock roadway. The steel wire bundle consists of parallel steel wires and a central pipe, wherein multiple strands of parallel steel wires are arranged around the central pipe, the central pipe is provided with a slurry output bracket which divides the parallel steel wires into a front part and a rear part, the front part is provided with large stirring jackets, and the rear part is provided with a threaded casing on its tail end. After the coal is cut by a tunneling machine and a roadway is formed, the steel wire bundle is anchored at the ends, and the roadway tunneling speed is increased on a premise of ensuring roadway safety; central grouting is carried out for the steel wire bundle with a pump truck without affecting the quick roadway tunneling, so as to anchor the steel wire bundle in full length and ensure long-time stability of the roadway. The length of the steel wire bundle may be selected according to the geological conditions and the mining environment of the mine, and is not limited by the height of the roadway; the single-anchor centrally grouted supporting method realizes full-length anchoring of the steel wire bundle, and it not only improves the roadway tunneling speed and relieves mining imbalance in the mine, but also solves the problem of large deformation of the roadway.
-
公开(公告)号:US11078021B2
公开(公告)日:2021-08-03
申请号:US17057112
申请日:2018-10-29
发明人: Nong Zhang , Zhengzheng Xie , Junyao Zhou , Qun Wei
摘要: A steel belt conveying apparatus includes upper and lower horizontal conveying portions, left and right inclined conveying chains, a connecting rod frame, an inclined frame, a drive portion, and a height adjustment cylinder. The left inclined conveying chain is separately connected to the upper and lower horizontal conveying portions. The right inclined conveying chain is separately connected to the upper and lower horizontal conveying portions. A top portion of the connecting rod frame is hingedly connected to an upper horizontal frame of the upper horizontal conveying portion. A bottom portion is hingedly connected to a lower frame of the lower horizontal conveying portion. A top portion of the inclined frame is hingedly connected to an upper horizontal drive shaft of the upper horizontal conveying portion, and a bottom portion is hingedly connected to a lower horizontal drive shaft of the lower horizontal conveying portion.
-
4.
公开(公告)号:US11280195B2
公开(公告)日:2022-03-22
申请号:US16624541
申请日:2018-10-29
发明人: Nong Zhang , Zhengzheng Xie , Junyao Zhou , Qun Wei
摘要: A single-anchor centrally grouted full-length anchored steel wire bundle and a supporting method thereof are described herein. The steel wire bundle consists of parallel steel wires and a central pipe, wherein multiple strands of parallel steel wires are arranged around the central pipe, the central pipe is provided with a slurry output bracket which divides the parallel steel wires into a front part and a rear part, the front part is provided with large stirring jackets, and the rear part is provided with a threaded casing on its tail end. After the coal is cut by a tunneling machine and a roadway is formed, the steel wire bundle is anchored at the ends, and the roadway tunneling speed is increased; central grouting is carried out for the steel wire bundle so as to anchor the steel wire bundle in full length and ensure long-time stability of the roadway.
-
-
-